Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68,980Admitted-Finance | ₹68,980 | L1 | Admitted-Finance |
| 2 | L2₹69,676.30+₹696.30 (1.01%)Admitted-Finance HIG 40 TYPE B DEV PRAYAGAM ADA COLONY JHALWA PRAYAGRAJ U P 211015 | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211015 | ₹69,676.30+₹696.30 (1.01%) | L2 | Admitted-Finance |
| 3 | L3₹69,743.95+₹763.95 (1.11%)Admitted-Finance | ₹69,743.95+₹763.95 (1.11%) | L3 | Admitted-Finance |
| 4 | L3₹69,743.95+₹763.95 (1.11%)Admitted-Finance | ₹69,743.95+₹763.95 (1.11%) | L3 | Admitted-Finance |
| 5 | L4₹69,744.01+₹764.01 (1.11%)Admitted-Finance 26 P BLOCK KUNJ VIHAR YASHODA NAGAR KANPUR NAGAR UTTAR PRADESH 208011 | KANPUR NAGAR | UTTAR PRADESH | 208011 | ₹69,744.01+₹764.01 (1.11%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N K Construction L1 | GOPAL ENTERPRISES L18 | M/s. P.L. Construction L4 | Bandhu Engineers L48 | J.S. ENTERPRISES L23 | OM BUILDERS L5 | SP ENTERPRISES L6 | M/s DIGAMBAR SINGH L36 | ABHI ENTERPRISES L47 | A K DIXIT & CO L42 | M/S S.D ENTERPRISES L7 | M/S TIWARI AND SONS L26 | URRBANVISTA ENTERPRISES L29 | M/s TRIPATHI ENTERPRISES AND COMPANY L38 | MAHAKAL ENTERPRISES L10 | SAUMYA ASSOCIATES L6 | PAL AND SONS L34 | M/S MA DURGA ENTERPRISES L3 | M/S KISHAN MARKETING CO L15 | A & A CONSTRUCTION L11 | JYOTI CONSTRUCTION CO. L13 | LAXMI ENTERPRISES L8 | M/s Maa Durga Construction Company L17 | M/s R K Construction Co. L2 | M/S ARYA ENTERPRISES L12 | JAGDAMBAY ENTERPRISES L25 | MAYANK ENTERPRISES L22 | AS ENTERPRISES L30 | LALITA CONSTRUCTION L41 | M/S R. V. TRADERS L27 | SHIVANSH ENTERPRISES L9 | M/S J.N. TRADERS L20 | SHUBHASH ENTERPRISES L19 | GAUTAM PLUMBERING WORKS L46 | National Trade Corporation L33 | FORTUNE BUILDERS L6 | S.R.CONSTRUCTION COMPANY L40 | M/s B. K. Engineering Works L39 | PK CONSTRUCTION CO L3 | RAMA TRADING AND COMPANY L16 | M/S HEMANT AND COMPANY L37 | M/s. R.A.ENTERPRISES L24 | M/S RADIANT CONSTRUCTION L35 | JAI BABA KI TRADERS L43 | Anand Traders L5 | KUMAR ENTERPRISES L21 | NAMO ENTERPRISES L31 | B S ENTERPRISEES L32 | MAA PITAMBARA ASSOCIATES L10 | V MUKH CONSTRUCTION COMPANY L7 | M/S SHIVAM ENTERPRISES L28 | DIVYA CONSTRUCTION L45 | M/S SHAKSHI ENTERPRISES L14 | M/S MAHABALI ENTERPRISES L44 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of roads for Construction of sewer M.H. including sorting out and stacking of serviciable materials and disposal of unserviciable materials upto a distance of 60m and its reistatement after filling and proper compection of trenches. A) Bitumuen Road | 1 | Sqm | 261 ₹261 | 271 ₹271 | 252 ₹252 | 260 ₹260 | 272 ₹272 | 252 ₹252 | 252 ₹252 | 254 ₹254 | 257 ₹257 | 270 ₹270 | 252 ₹252 | 273 ₹273 | 270 ₹270 | 262 ₹262 | 252 ₹252 | 252 ₹252 | 277 ₹277 | 252 ₹252 | 253 ₹253 | 257 ₹257 | 252 ₹252 | 255 ₹255 | 262 ₹262 | 255 ₹255 | 258 ₹258 | 252 ₹252 | 256 ₹256 | 283 ₹283 | 257.04 ₹257.04 | 285 ₹285 | 256 ₹256 | 255 ₹255 | 254 ₹254 | 255 ₹255 | 254.52 ₹254.52 | 252 ₹252 | 260 ₹260 | 253 ₹253 | 252 ₹252 | 245 ₹245 Lowest | 263 ₹263 | 245 ₹245 Lowest | 256 ₹256 | 274 ₹274 | 252 ₹252 | 253 ₹253 | 283 ₹283 | 255 ₹255 | 252 ₹252 | 252 ₹252 | 262 ₹262 | 267 ₹267 | 245 ₹245 Lowest | 268 ₹268 |
| 2.00 | Dismantling of roads for Construction of sewer M.H. including sorting out and stacking of serviciable materials and disposal of unserviciable materials upto a distance of 60m and its reistatement after filling and proper compection of trenches. B) CC Road | 1 | Sqm | 489 ₹489 | 491 ₹491 | 486.52 ₹486.52 | 500 ₹500 | 492 ₹492 | 486.52 ₹486.52 | 486.52 ₹486.52 | 487.52 ₹487.52 | 496.25 ₹496.25 | 500 ₹500 | 486.52 ₹486.52 | 493 ₹493 | 499 ₹499 | 490 ₹490 | 486.52 ₹486.52 | 486.52 ₹486.52 | 499 ₹499 | 486.52 ₹486.52 | 486 ₹486 Lowest | 491.52 ₹491.52 | 486.52 ₹486.52 | 487 ₹487 | 496.62 ₹496.62 | 487 ₹487 | 490 ₹490 | 488 ₹488 | 489 ₹489 | 492 ₹492 | 496.25 ₹496.25 | 490 ₹490 | 488 ₹488 | 490 ₹490 | 495 ₹495 | 495 ₹495 | 491.39 ₹491.39 | 486.52 ₹486.52 | 488 ₹488 | 490 ₹490 | 486.52 ₹486.52 | 488 ₹488 | 491 ₹491 | 488 ₹488 | 500 ₹500 | 504 ₹504 | 486.52 ₹486.52 | 487 ₹487 | 493 ₹493 | 491 ₹491 | 486.52 ₹486.52 | 486.52 ₹486.52 | 490 ₹490 | 507 ₹507 | 488 ₹488 | 508 ₹508 |
| 3.00 | Dismantling of roads for Construction of sewer M.H. including sorting out and stacking of serviciable materials and disposal of unserviciable materials upto a distance of 60m and its reistatement after filling and proper compection of trenches. C) Interlocking Road | 1 | Sqm | 219 ₹219 | 221 ₹221 | 215.38 ₹215.38 | 220 ₹220 | 222 ₹222 | 215.38 ₹215.38 | 215.38 ₹215.38 | 215.38 ₹215.38 | 219.68 ₹219.68 | 250 ₹250 | 215.4 ₹215.4 | 223 ₹223 | 258.25 ₹258.25 | 218 ₹218 | 215.38 ₹215.38 | 215.38 ₹215.38 | 229 ₹229 | 215.38 ₹215.38 | 215 ₹215 Lowest | 220.38 ₹220.38 | 218 ₹218 | 216 ₹216 | 225.38 ₹225.38 | 217 ₹217 | 218 ₹218 | 220 ₹220 | 221 ₹221 | 222 ₹222 | 219.68 ₹219.68 | 225 ₹225 | 217 ₹217 | 220 ₹220 | 218 ₹218 | 218 ₹218 | 217.53 ₹217.53 | 215.38 ₹215.38 | 230 ₹230 | 216 ₹216 | 215.38 ₹215.38 | 218 ₹218 | 219 ₹219 | 218 ₹218 | 218 ₹218 | 254 ₹254 | 215.38 ₹215.38 | 222 ₹222 | 223 ₹223 | 218 ₹218 | 215.38 ₹215.38 | 215.4 ₹215.4 | 218 ₹218 | 257 ₹257 | 250 ₹250 | 257 ₹257 |
| 4.00 | Excavation of foundation in ordinary soil(loam clay or sand) including lift upto 1.50 m & lead upto 30 mts.and including filling, watering & ramming of excavated earth into trenches or into the space between the building & the side of foundation trinches or into the plinth and removal of surplus earth disposed away from the site etc. all complete as per direction of site I/C. A) Lift up to 1.50 M | 1 | cum | 359 ₹359 | 351 ₹351 | 350.26 ₹350.26 | 360 ₹360 | 352 ₹352 | 350.26 ₹350.26 | 350.26 ₹350.26 | 350.26 ₹350.26 | 360.76 ₹360.76 | 360 ₹360 | 350.27 ₹350.27 | 353 ₹353 | 363 ₹363 | 355 ₹355 | 350.26 ₹350.26 | 350.26 ₹350.26 | 359 ₹359 | 350.26 ₹350.26 | 355 ₹355 | 355.26 ₹355.26 | 355 ₹355 | 351 ₹351 | 360.35 ₹360.35 | 350 ₹350 Lowest | 355 ₹355 | 365 ₹365 | 356 ₹356 | 352 ₹352 | 357 ₹357 | 350 ₹350 Lowest | 350 ₹350 Lowest | 355 ₹355 | 365 ₹365 | 358 ₹358 | 353.76 ₹353.76 | 350.26 ₹350.26 | 380 ₹380 | 352 ₹352 | 350.26 ₹350.26 | 365 ₹365 | 356 ₹356 | 365 ₹365 | 365 ₹365 | 364 ₹364 | 350.26 ₹350.26 | 360 ₹360 | 353 ₹353 | 354 ₹354 | 350.26 ₹350.26 | 350.27 ₹350.27 | 355 ₹355 | 367 ₹367 | 400 ₹400 | 367 ₹367 |
| 5.00 | Excavation of foundation in ordinary soil(loam clay or sand) including lift upto 1.50 m & lead upto 30 mts.and including filling, watering & ramming of excavated earth into trenches or into the space between the building & the side of foundation trinches or into the plinth and removal of surplus earth disposed away from the site etc. all complete as per direction of site I/C. B) Lift up to 3.00 M | 1 | cum | 458 ₹458 | 441 ₹441 | 439.33 ₹439.33 | 450 ₹450 | 442 ₹442 | 439.33 ₹439.33 | 439.33 ₹439.33 | 439.33 ₹439.33 | 448.11 ₹448.11 | 450 ₹450 | 439.3 ₹439.3 | 443 ₹443 | 455 ₹455 | 455 ₹455 | 439.33 ₹439.33 | 439.33 ₹439.33 | 449 ₹449 | 439.33 ₹439.33 | 350 ₹350 Lowest | 444.33 ₹444.33 | 445 ₹445 | 440 ₹440 | 450 ₹450 | 440 ₹440 | 440 ₹440 | 439 ₹439 | 439 ₹439 | 442 ₹442 | 448.11 ₹448.11 | 442 ₹442 | 440 ₹440 | 440 ₹440 | 440 ₹440 | 446 ₹446 | 443.72 ₹443.72 | 439.33 ₹439.33 | 450 ₹450 | 440 ₹440 | 439.33 ₹439.33 | 439 ₹439 | 451 ₹451 | 439 ₹439 | 440 ₹440 | 454 ₹454 | 439.33 ₹439.33 | 441 ₹441 | 443 ₹443 | 444 ₹444 | 439.33 ₹439.33 | 439.3 ₹439.3 | 450 ₹450 | 457 ₹457 | 450 ₹450 | 458 ₹458 |
| 6.00 | Excavation of foundation in ordinary soil(loam clay or sand) including lift upto 1.50 m & lead upto 30 mts.and including filling, watering & ramming of excavated earth into trenches or into the space between the building & the side of foundation trinches or into the plinth and removal of surplus earth disposed away from the site etc. all complete as per direction of site I/C. C ) Lift up to 4.50 M | 1 | cum | 558 ₹558 | 551 ₹551 | 550 ₹550 | 600 ₹600 | 552 ₹552 | 550.6 ₹550.6 | 550 ₹550 | 552.6 ₹552.6 | 567.11 ₹567.11 | 570 ₹570 | 550.6 ₹550.6 | 553 ₹553 | 563 ₹563 | 557 ₹557 | 550.6 ₹550.6 | 550 ₹550 | 559 ₹559 | 550.6 ₹550.6 | 560 ₹560 | 555.6 ₹555.6 | 560 ₹560 | 551 ₹551 | 561 ₹561 | 550 ₹550 | 552 ₹552 | 550 ₹550 | 549 ₹549 | 554 ₹554 | 561.61 ₹561.61 | 551 ₹551 | 550.8 ₹550.8 | 550 ₹550 | 550 ₹550 | 565 ₹565 | 556.11 ₹556.11 | 550 ₹550 | 560 ₹560 | 552 ₹552 | 550.6 ₹550.6 | 550 ₹550 | 556 ₹556 | 550 ₹550 | 550 ₹550 | 574 ₹574 | 550.6 ₹550.6 | 544 ₹544 | 553 ₹553 | 556 ₹556 | 550.6 ₹550.6 | 550.6 ₹550.6 | 555 ₹555 | 577 ₹577 | 460 ₹460 Lowest | 578 ₹578 |
| 7.00 | Excavation of foundation in ordinary soil(loam clay or sand) including lift upto 1.50 m & lead upto 30 mts.and including filling, watering & ramming of excavated earth into trenches or into the space between the building & the side of foundation trinches or into the plinth and removal of surplus earth disposed away from the site etc. all complete as per direction of site I/C. D ) Lift up to 6.00 M | 1 | cum | 548 ₹548 | 541 ₹541 | 538.8 ₹538.8 | 580 ₹580 | 542 ₹542 | 538.8 ₹538.8 | 538.8 ₹538.8 | 540.8 ₹540.8 | 555 ₹555 | 550 ₹550 | 538.8 ₹538.8 | 543 ₹543 | 552 ₹552 | 547 ₹547 | 638.8 ₹638.8 | 538.8 ₹538.8 | 549 ₹549 | 538.8 ₹538.8 | 540 ₹540 | 543.8 ₹543.8 | 555 ₹555 | 539 ₹539 | 548 ₹548 | 540 ₹540 | 540 ₹540 | 540 ₹540 | 539 ₹539 | 544 ₹544 | 549.57 ₹549.57 | 542 ₹542 | 540 ₹540 | 540 ₹540 | 538.8 ₹538.8 | 550 ₹550 | 544.19 ₹544.19 | 538.8 ₹538.8 | 555 ₹555 | 540 ₹540 | 538.8 ₹538.8 | 540 ₹540 | 546 ₹546 | 540 ₹540 | 540 ₹540 | 554 ₹554 | 538.8 ₹538.8 | 533 ₹533 Lowest | 543 ₹543 | 544 ₹544 | 638.8 ₹638.8 | 538.8 ₹538.8 | 545 ₹545 | 557 ₹557 | 540 ₹540 | 558 ₹558 |
| 8.00 | Excavation of foundation in ordinary soil(loam clay or sand) including lift upto 1.50 m & lead upto 30 mts.and including filling, watering & ramming of excavated earth into trenches or into the space between the building & the side of foundation trinches or into the plinth and removal of surplus earth disposed away from the site etc. all complete as per direction of site I/C. E) Lift up to 7.50 M | 1 | cum | 839 ₹839 | 831 ₹831 | 835.5 ₹835.5 | 850 ₹850 | 832 ₹832 | 835.5 ₹835.5 | 835.5 ₹835.5 | 837 ₹837 | 852.21 ₹852.21 | 850 ₹850 | 835.5 ₹835.5 | 833 ₹833 | 849 ₹849 | 843 ₹843 | 835.5 ₹835.5 | 835.5 ₹835.5 | 839 ₹839 | 835.5 ₹835.5 | 835 ₹835 | 840.8 ₹840.8 | 850 ₹850 | 836 ₹836 | 846 ₹846 | 837 ₹837 | 841.5 ₹841.5 | 850 ₹850 | 836 ₹836 | 834 ₹834 | 852.21 ₹852.21 | 830 ₹830 Lowest | 835 ₹835 | 837 ₹837 | 840 ₹840 | 848 ₹848 | 843.86 ₹843.86 | 835.5 ₹835.5 | 850 ₹850 | 836 ₹836 | 835.5 ₹835.5 | 850 ₹850 | 842 ₹842 | 850 ₹850 | 842 ₹842 | 854 ₹854 | 835.5 ₹835.5 | 833 ₹833 | 833 ₹833 | 844 ₹844 | 835.5 ₹835.5 | 835.5 ₹835.5 | 841 ₹841 | 857 ₹857 | 850 ₹850 | 857 ₹857 |
| 9.00 | Excavation of foundation in ordinary soil(loam clay or sand) including lift upto 1.50 m & lead upto 30 mts.and including filling, watering & ramming of excavated earth into trenches or into the space between the building & the side of foundation trinches or into the plinth and removal of surplus earth disposed away from the site etc. all complete as per direction of site I/C. F) Lift up to 9.00 M | 1 | cum | 1,098 ₹1,098 Lowest | 1,101 ₹1,101 | 1,098.04 ₹1,098.04 | 1,150 ₹1,150 | 1,101 ₹1,101 | 1,098.04 ₹1,098.04 | 1,098.04 ₹1,098.04 | 2,000 ₹2,000 | 1,131 ₹1,131 | 1,150 ₹1,150 | 1,098.05 ₹1,098.05 | 1,103 ₹1,103 | 1,112 ₹1,112 | 1,106 ₹1,106 | 1,098.04 ₹1,098.04 | 1,098.04 ₹1,098.04 | 1,109 ₹1,109 | 1,098.04 ₹1,098.04 | 1,100 ₹1,100 | 1,103.04 ₹1,103.04 | 1,098 ₹1,098 Lowest | 1,098 ₹1,098 Lowest | 1,109 ₹1,109 | 1,098 ₹1,098 Lowest | 1,100 ₹1,100 | 1,100 ₹1,100 | 1,101 ₹1,101 | 1,105 ₹1,105 | 1,120 ₹1,120 | 1,100 ₹1,100 | 1,098 ₹1,098 Lowest | 1,100 ₹1,100 | 1,100 ₹1,100 | 1,125 ₹1,125 | 1,109.02 ₹1,109.02 | 1,098.04 ₹1,098.04 | 1,100 ₹1,100 | 1,100 ₹1,100 | 1,098.04 ₹1,098.04 | 1,098 ₹1,098 Lowest | 1,100 ₹1,100 | 1,100 ₹1,100 | 1,110 ₹1,110 | 1,154 ₹1,154 | 1,098.04 ₹1,098.04 | 1,111 ₹1,111 | 1,103 ₹1,103 | 1,109 ₹1,109 | 1,098.04 ₹1,098.04 | 1,098.05 ₹1,098.05 | 1,099 ₹1,099 | 1,157 ₹1,157 | 1,098 ₹1,098 Lowest | 1,156 ₹1,156 |
| 10.00 | Close Timbering in trenches A ) 0.0 to 3.0 M deep | 1 | Sqm | 185 ₹185 Lowest | 1,651 ₹1,651 | 1,648.7 ₹1,648.7 | 1,700 ₹1,700 | 1,653 ₹1,653 | 1,648.7 ₹1,648.7 | 1,648.7 ₹1,648.7 | 1,650 ₹1,650 | 1,698 ₹1,698 | 1,700 ₹1,700 | 1,648.7 ₹1,648.7 | 1,653 ₹1,653 | 1,662 ₹1,662 | 1,696 ₹1,696 | 1,648.7 ₹1,648.7 | 1,648.7 ₹1,648.7 | 1,659 ₹1,659 | 1,648.04 ₹1,648.04 | 1,650 ₹1,650 | 1,653.7 ₹1,653.7 | 1,660 ₹1,660 | 1,649 ₹1,649 | 1,659 ₹1,659 | 1,650 ₹1,650 | 1,650.2 ₹1,650.2 | 1,660 ₹1,660 | 1,651 ₹1,651 | 1,655 ₹1,655 | 1,681.67 ₹1,681.67 | 1,650 ₹1,650 | 1,649 ₹1,649 | 1,650 ₹1,650 | 1,660 ₹1,660 | 1,690 ₹1,690 | 1,665.19 ₹1,665.19 | 1,648.7 ₹1,648.7 | 1,660 ₹1,660 | 1,650 ₹1,650 | 1,648.04 ₹1,648.04 | 1,660 ₹1,660 | 1,690 ₹1,690 | 1,660 ₹1,660 | 1,650 ₹1,650 | 1,704 ₹1,704 | 1,648.7 ₹1,648.7 | 1,666 ₹1,666 | 1,653 ₹1,653 | 1,665 ₹1,665 | 1,648.7 ₹1,648.7 | 1,648.7 ₹1,648.7 | 1,680 ₹1,680 | 1,707 ₹1,707 | 1,660 ₹1,660 | 1,705 ₹1,705 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
29 Jun 2026, 2:00 pmClosed
EE
S/O
Repairing/Construction of New Sewer Manhole in jalkal vibhag, Nagar Nigam.
2026_DOLBU_1161113_1
JalKal / 1060 / EE Zone 4 /
Open Tender
Miscellaneous Works
Item Rate
30 days
Jal Kal Vibhag Kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Jal Kal Vibhag
₹50,000
18 Sept 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of roads for Construction of sewer M.H. including sorting out and stacking of serviciable materials and disposal of unserviciable materials upto a distance of 60m and its reistatement after filling and proper compection of trenches. A) Bitumuen Road | - | Sqm | - | - |
| 2 | Dismantling of roads for Construction of sewer M.H. including sorting out and stacking of serviciable materials and disposal of unserviciable materials upto a distance of 60m and its reistatement after filling and proper compection of trenches. B) CC Road | - | Sqm | - | - |
| 3 | Dismantling of roads for Construction of sewer M.H. including sorting out and stacking of serviciable materials and disposal of unserviciable materials upto a distance of 60m and its reistatement after filling and proper compection of trenches. C) Interlocking Road | - | Sqm | - | - |
| 4 | Excavation of foundation in ordinary soil(loam clay or sand) including lift upto 1.50 m & lead upto 30 mts.and including filling, watering & ramming of excavated earth into trenches or into the space between the building & the side of foundation trinches or into the plinth and removal of surplus earth disposed away from the site etc. all complete as per direction of site I/C. A) Lift up to 1.50 M | - | cum | - | - |
| 5 | Excavation of foundation in ordinary soil(loam clay or sand) including lift upto 1.50 m & lead upto 30 mts.and including filling, watering & ramming of excavated earth into trenches or into the space between the building & the side of foundation trinches or into the plinth and removal of surplus earth disposed away from the site etc. all complete as per direction of site I/C. B) Lift up to 3.00 M | - | cum | - | - |
| 6 | Excavation of foundation in ordinary soil(loam clay or sand) including lift upto 1.50 m & lead upto 30 mts.and including filling, watering & ramming of excavated earth into trenches or into the space between the building & the side of foundation trinches or into the plinth and removal of surplus earth disposed away from the site etc. all complete as per direction of site I/C. C ) Lift up to 4.50 M | - | cum | - | - |
| 7 | Excavation of foundation in ordinary soil(loam clay or sand) including lift upto 1.50 m & lead upto 30 mts.and including filling, watering & ramming of excavated earth into trenches or into the space between the building & the side of foundation trinches or into the plinth and removal of surplus earth disposed away from the site etc. all complete as per direction of site I/C. D ) Lift up to 6.00 M | - | cum | - | - |
| 8 | Excavation of foundation in ordinary soil(loam clay or sand) including lift upto 1.50 m & lead upto 30 mts.and including filling, watering & ramming of excavated earth into trenches or into the space between the building & the side of foundation trinches or into the plinth and removal of surplus earth disposed away from the site etc. all complete as per direction of site I/C. E) Lift up to 7.50 M | - | cum | - | - |
| 9 | Excavation of foundation in ordinary soil(loam clay or sand) including lift upto 1.50 m & lead upto 30 mts.and including filling, watering & ramming of excavated earth into trenches or into the space between the building & the side of foundation trinches or into the plinth and removal of surplus earth disposed away from the site etc. all complete as per direction of site I/C. F) Lift up to 9.00 M | - | cum | - | - |
| 10 | Close Timbering in trenches A ) 0.0 to 3.0 M deep | - | Sqm | - | - |
stage.html
html • 0.14 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
1060t.pdf
Tender Documents • 1.41 MB
BOQ_2176223.xls
BOQ • 0.37 MB
MM.pdf
PDF • 1.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .