| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | L1 | Accepted-AOC WORK IS AWARDED TO L1 BIDDER | |
| 2 | L2₹1.6 L+₹7,380.20 (4.92%)Rejected-Finance | L2 | Rejected-Finance REJECTED BEING L2 | |
| 3 | L3₹1.8 L+₹32,840.77 (21.9%)Rejected-Finance | L3 | Rejected-Finance REJECTED BEING L2 |
Tender Value
₹2.1 L
EMD Value
₹2,700
Closing Date
25 Jun 2024, 5:00 pmClosed
STAFF OFFICER CIVIL ORIENT AREA MCL
STAFF OFFICER CIVIL,ORIENT AREA,MCL MOB 9937422452/9437249189/9438494602
Repairing of coal transportation road near weigh bridge of Mine No 02 under Orient Sub Area
2024_MCL_310078_1
MCL/GM/OA/SO(C)/e-T/24-25/06 dtd.08.06.2024
Open Tender
Civil Works - Roads
Item Rate
45 days
ORIENT AREA MCL
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,700
Yes
9 Oct 2024
14 Jun 2024
26 Jun 2024
14 Jun 2024
25 Jun 2024
14 Jun 2024
14 Jun 2024 - 18 Jun 2024
Amount
Item Description/ Heading
Supplying and stacking of stone boulder 15cm to 22.5 cm size of hard granite or equivalent as approved by EIC at work site including stacking along road side equidistantly and uniformly including royalty, octroi, and all other taxes complete with all lead and lift (A deduction of 15% is to be made on account of voids in stone boulder. Measurement of material is to be taken just before laying work starts and payment shall be made only after laying of the material)
Supplying and stacking at work site hard granite or equivalent as approved by EIC, hand broken stone metal 90mm to 45mm size I.e. IRC GR-I of approved quality including screening & stacking along road side equidistantly and uniformly including royalty, octrroi, and all other taxes complete with all leads and lifts (A deduction of 7.5% is to be made on account of voids in stone metal. Measurement of material is to be taken just before laying work starts and payment shall be made only after laying of the material)
Supplying and stacking at work site hard granite or equivalent as approved by EIC, hand broken stone metal 63mm to 45mm size I.e. IRC GR-II of approved quality including screening & stacking along road side equidistantly and uniformly including royalty, octrroi, and all other taxes complete with all leads and lifts ( A deduction of 7.5% is to be made on account of voids in stone metal. Measurement of material is to be taken just before laying work starts and payment shall be made only after laying of the material)
Supplying and stacking at work site crusher stone dust including royalty,octrroi and all other taxes complete with all leads and lifts
Laying Gr-I (90mm-45mm) or Gr-II (63mm-45mm) metal in WBM sub base/base course I/c screening, sorting, spreading to template, packing with smaller stones, blinding with moorum, watering and consolidation with power roller-80/100 KN capacity i/c hire charges and running cost of road roller, pay of driver, khalasi & chowkidar and providing proper signals, road barriers etc. complete but excluding the cost of material like stone metal, packing stone and moorum (Payment to be made for compacted volume of WBM layer actually laid. For estimation purpose, loose quantity of stone metal for 1 cu.m. compacted volume of WBM will be 1.221 cu.m. i.e. 1.00 cu.m + 32% for looseness factor.- 7.5% for void = 1.221 cu.m.).
Laying stone boulder 15 cm to 22.5 cm size in WBM sub base course I/c packing with smaller stones and consolidation with power roller-80/100 KN capacity i/c spreading and consolidation of binding material i.e. moorum or earth etc. including hire charges and running cost of road roller, pay of driver, khalasi & chowkidar and providing proper signals, road barriers etc. complete but excluding the cost of stone bouldr, chips and binding material.(Payment to be made for quantity of only stone boulder used excluding 15 % for voids)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth.1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.All kinds of soil
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
BABAR KHAN
MANJITA SINGH
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .