Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.6 LAccepted-AOC | ₹62.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹65.1 LRejected-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹65.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Gopi S L2 | Malaiarasan.V L1 |
|---|---|---|---|---|---|
| 1.01Strengthening of the Road Veeranamur to Kadugapattu Road km 0/0 -1/370 | |||||
| 1.02 | Clearing the scrub jungles including all labour charges for all labour charges etc complete. | 2,211.62 | m2 | 15 ₹33,174.30 | 5.6 ₹12,385.07 |
| 1.03 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br | 3,071.7 | m3 | 200 ₹6.1 L | 140 ₹4.3 L |
| 1.04 | Picking the existing BT surface upto 5cm to 10cm thickness and sectioning the road | 1,706.5 | m2 | 25 ₹42,662.50 | 23 ₹39,249.50 |
| 1.05Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete. | |||||
| 1.06 | km 0/0 - 1/00 | 462.77 | m3 | 820.22 ₹3.8 L | 820.22 ₹3.8 L |
| 1.07 | km 1/00 - 1/200 | 172.05 | m3 | 829.65 ₹1.4 L | 829.65 ₹1.4 L |
| 1.08 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 639.93 | m3 | 2,723.27 ₹17.4 L | 2,723.27 ₹17.4 L |
| 1.09 | Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 5,137.5 | m2 | 86.54 ₹4.4 L | 86.54 ₹4.4 L |
| 1.10 | Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 5,137.5 | m2 | 20.25 ₹1.0 L | 20.25 ₹1.0 L |
Tender Value
₹66.4 L
EMD Value
₹67,000
Closing Date
20 Feb 2026, 3:00 pmClosed
The Additional Collector
DRDA, VILUPPURAM
TNVPM/NABARD/26-27/25
2026_RDTN_656513_19
TNVPM/NABARD/26-27
Open Tender
Civil Works
180 days
Viluppuram District
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹67,000
Yes
16 Mar 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
14 Feb 2026
Strengthening of the Road Veeranamur to Kadugapattu Road km 0/0 -1/370
Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br
Picking the existing BT surface upto 5cm to 10cm thickness and sectioning the road
Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision of rumble strips covered with premix bituminous carpet, 15 - 20 mm high at centre, 250 mm wide placed at 1 m center-to-centre at approved locations to control speed, marked with white strips of road marking paint.Painting lines, Dashes, Arrows, etc. on Road in Two Coats on New Work Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702
Provision for KM Stones.
Provision for HM Stones.
Provision for 60Cm Equilateral Triangular Sign board Charges
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Towards the cost of Name Board charges
Towards the cost of photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_788200.xls
BOQ • 0.26 MB
25.pdf
Tender Documents • 1.02 MB
Download all tender documents and submit your bid