Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
26 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE OFFICER
MUNICIPAL BOARD AKOLA
CONSTRUCTION OR REPAIR OF DRAINS OR GUTTERS IN THE AKOLA MUNICIPAL AREA UNDER AN ANNUAL RATE CONTRACT
2026_DLB_604246_1
E-NIVIDA SUCHAN 09/2026-27/2306 DT 16-10-2026 NP AKOLA
Open Tender
Civil Works
Percentage
365 days
AKOLA
Please See Tender Document Or Condition
2 documents required · 2 mandatory
₹1,000
EO NAGARPALIKA AKOLA/MD RISL
₹60,000
Yes
16 Oct 2026
16 Oct 2026
27 Oct 2026
16 Oct 2026
26 Oct 2026
16 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 300 | Cum | 229.5 | ₹68,850 |
| 2 | Silt clearance of drains, channels and canals with lift 1.5 Mtr and lead up to 50 Mtr. | 300 | Cum | 384.5 | ₹1,15,350 |
| 3 | Sludge clearance of drains, channels and canals with lift 1.5 Mtr and lead up to 50 Mtr | 300 | Cum | 411 | ₹1,23,300 |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Dismantling Stone Masonry Rubble stone masonry in cement mortar. | 60 | Cum | 386 | ₹23,160 |
| 5 | Carriage of Materials by mechanical transport including loading, unloading and stacking 5 km. | 400 | Cum | 254.76 | ₹1,01,904 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 120 | Cum | 5,910 | ₹7,09,200 |
| 7 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | 90 | Cum | 4,860 | ₹4,37,400 |
| 8 | Centring and shuttering upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 600 | Sqm | 236.5 | ₹1,41,900 |
| 9 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : 1:6 (1 cement : 6 fine/ coarse sand) | 1,000 | Sqm | 294.5 | ₹2,94,500 |
| 10 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). | 600 | Sqm | 445 | ₹2,67,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Tendernotice_2.pdf
PDF • 1.68 MB
BOQ_1071755.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .