Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC D 11 47 SURAJPUR INDUSTRIAL AREA SITE 5 GREATER NOIDA GAUTAM BUDH NAGAR UTTAR PRADESH GAUTAM BUDDHA NAGAR UTTAR PRADESH 201306 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201306 | ₹2.4 Cr Quoted ₹7.2 Cr | L1 | Accepted-AOC Awarded |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
30 Mar 2021, 5:00 pmClosed
Executive Engineer
Executive Engineer, PH.Engg. Division No.3 Narnaul
Up gradation and commissioning of existing 3.00 MLD capacity sewage treatment based on Moving Bed Biological Reactor Technology Attached growth process on any proven technology specified in the CPHEEO manual of sewerage and sewage treatment plant by
2021_HRY_164515_1
EIC Pkl No. 82939-PHE/Works(2) dt.25.09.2020
Open Tender
Civil Works
Works
547 days
Kanina
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹3 L
9 Apr 2022
18 Mar 2021
30 Mar 2021
18 Mar 2021
30 Mar 2021
18 Mar 2021
Amount
Lump sum cost for Up gradation and commissioning of existing 3.00 MLDcapacity sewage treatment based on Moving Bed Biological Reactor Technology (Attached growth process) on any proven technology specified in the CPHEEO manual of sewerage and sewage treatment plant by Ministry of Urban Development, Govt. of India or subsequently approved by MOUD and should be suitable for achieving the parameters as per standards specified in data sheet keeping in view the adequacy of the existing structures and new structures to be constructed for upgradation of STP, right from MPS upto effluent channel and operation and maintenance during defect liability period of 12 months after trail run period of 3 months and for 5 years and all other works contingent there to at Kanina townDistrict Mohindergarh
Guaranteed Power Consumption -Electric Power consumption per year for Ist Year ( Units to be entered)
Guaranteed Power Consumption -Electric Power consumption per year for 2nd Year ( Units to be entered)
Guaranteed Power Consumption -Electric Power consumption per year for 3rd Year ( Units to be entered)
Guaranteed Power Consumption -Electric Power consumption per year for 4thYear ( Units to be entered)
Guaranteed Power Consumption -Electric Power consumption per year for 5th Year ( Units to be entered)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .