| 1 | L-1₹84.4 LAccepted-AOC LOWER KOM KEIRAP PO PS LOKTAK PROJECT CHURACHANDPUR MANIPUR 795124 | CHURACHANDPUR | CHURACHANDPUR | MANIPUR | 795124 | ₹84.4 L Quoted ₹85.9 L | L-1 | Accepted-AOC 1st Lowest |
| 2 | L-2₹87.8 L+₹1.9 L (2.21%)Rejected-Finance THENJANG VILLAGE CHURACHANDPUR MANIPUR 795124 | BISHNUPUR | MANIPUR | 795124 | ₹87.8 L+₹1.9 L (2.21%) | L-2 | Rejected-Finance 2nd Lowest |
| 3 | Rejected-Technical MAJURON VILLAGE CHURACHANDPUR MANIPUR 795124 | BISHNUPUR | MANIPUR | 795124 | - | - | Rejected-Technical Techno-commercially Non-Responsive |
| Sl No | Description | Qty | Unit | M/S P. MATHEW L2 | M/s SERTO ASON KOM L1 |
|---|---|---|---|---|---|
| 1.00 | Demolishing brick work manually/ by Mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in charge. In Cement mortar. | 1 | Cum | 1,399 ₹1,399 | 1,352 ₹1,352 Lowest |
| 2.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 1.53 | Cum | 2,465 ₹3,771.45 | 2,400 ₹3,672 Lowest |
| 3.00 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below. | 35 | Nos. | 248 ₹8,680 | 242 ₹8,470 Lowest |
| 4.00 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles above 10 mm and upto 25 mm. | 253.62 | Sqm | 48 ₹12,173.76 | 47 ₹11,920.14 Lowest |
| 5.00 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 1,034.05 | Sqm | 38 ₹39,293.9 | 37 ₹38,259.85 Lowest |
| 6.00 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 43.23 | Cum | 473 ₹20,447.79 | 463 ₹20,015.49 Lowest |
| 7.00 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed: All Kinds of soil. | 419.58 | Sqm | 88 ₹36,923.04 | 86 ₹36,083.88 Lowest |
| 8.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level: 1:3:6 (1 Cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). | 20.47 | Cum | 10,995 ₹2,25,067.65 | 10,730 ₹2,19,643.1 Lowest |
| 9.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 8.34 | Cum | 15,436 ₹1,28,736.24 | 15,101 ₹1,25,942.34 Lowest |
| 10.00 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 6.75 | Cum | 13,502 ₹91,138.5 | 13,209 ₹89,160.75 Lowest |
Tender Value
₹82.8 L
EMD Value
₹1.7 L
Closing Date
12 Jun 2026, 5:00 pmClosed
GSM (E and C), Contracts Division
Office of the GSM (E and C), Contracts Division, NHPC Limited, Loktak Power Station, PO-Loktak, Komkeirap, Distt-Churachandpur, Manipur-795124
Renovation of Leimatak Hospital at Loktak Power Station, Manipur.
2026_NHPC_908995_1
NH-LPS-CDIV/126/2025-LTPC/1106
Open Tender
Civil Works
Works
300 days
NHPC Ltd., Loktak Project
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,180
NHPC Ltd.
₹1.7 L
Yes
24 Aug 2026
22 May 2026
17 Jun 2026
22 May 2026
12 Jun 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by Mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in charge. In Cement mortar. | 1 | Cum | - | - |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 1.53 | Cum | - | - |
| 3 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below. | 35 | Nos. | - | - |
| 4 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles above 10 mm and upto 25 mm. | 253.62 | Sqm | - | - |
| 5 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 1,034.05 | Sqm | - | - |
| 6 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 43.23 | Cum | - | - |
| 7 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed: All Kinds of soil. | 419.58 | Sqm | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level: 1:3:6 (1 Cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). | 20.47 | Cum | - | - |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 8.34 | Cum | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 6.75 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.17 MB
tenderdocument.pdf
Tender Documents • 16.84 MB
BOQ_956234.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .