Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹4.0 Cr
EMD Value
₹1.2 L
Closing Date
12 May 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM(Contracts)
Indian Oil Corporation Limited, Paradip Refinery, PO- Jhimani, Via-Kujang, District-Jagatsinghpur, Odisha-754141, Tel No. - 06722- 255371
Structural Repair of Piles at South Oil Jetty (SOJ) Paradip Refinery.
2026_PDR_189248_1
9070C26A74
Open Tender
Civil Works
Tender cum Auction
180 days
PARADIP REFINERY
Please refer Tender documents.
10 documents required · 10 mandatory
₹1.2 L
Yes
Refer NIT Clause no. 6
3 Oct 2026
11 Mar 2026
13 May 2026
11 Mar 2026
12 May 2026
11 Mar 2026
17 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 10SOJ Pile repair | ||||||
| 10.1 | "Execution of Repair job of piles as the methodology mentioned as below. Step 1: Fix the Surface applied SRM TM Seamless Annular Shell Form (which is a high-performance Glass Fiber Reinforced Polymer (GFRP) annular forming laminate designed for creating a continuous, staying place, seamless external jacket around existing piles, columns, and similar vertical structural elements to be repaired or strengthened using suitable underwater epoxy adhesive and spacers as per site requirement. )over the prepared area of concrete section to be jacketed and cast it with Micro-concrete underwater to form a base collar ring along the periphery. Step 2: FIX SRM AF SPACERS at required Spacing in both directions and in plumb on the face of pier (also provide shear key and distribution steel bars wherever required in both directions. Step 3: Lower and fix the slide in high strength noncorrosive sacrificial SRM Annular Form Sheets in the spacers and fix it; after complete installation tie all of them together with annular tie bands for enhanced rigidity during casting. Step 4: Mixing the underwater Micro concrete and fill the same using the inlet point provided in SRM patch Form frame or pouring it in SRM Seamless Annular Shell with micro tremie pipes for better reach (for larger depths SRM Annular Form to be provided with Inlet ports for pouring Micro concrete). Use material with suitable consistency for underwater works. observe the fill through transparent window provided in form. Step 5: Allow to cure and carryout an underwater (after repair and retrofit works) inspection with photography and videography of repair , all complete as per direction of Engineer-In-charge The rate is inclusive of all consumables, materials , labours , Tool tackles, Transportation , Lodging etc. involved. The unit of measurement is in Sqm ( The Repaired area will be considered for measurement)" | 100 | SQM | 94,099.43 | ₹94,09,943 | 0.18% |
| 10.2 | "Execution of Repair job of piles as the methodology mentioned as below. Step 1: Removal of the highly corroded steel liners Step 2: Fix the Surface applied SRM TM Seamless Annular Shell Form (which is a high-performance Glass Fiber Reinforced Polymer (GFRP) annular forming laminate designed for creating a continuous, staying place, seamless external jacket around existing piles, columns, and similar vertical structural elements to be repaired or strengthened using suitable underwater epoxy adhesive and spacers as per site requirement. )over the prepared area of concrete section to be jacketed and cast it with Micro-concrete underwater to form a base collar ring along the periphery. Step 3: FIX SRM AF SPACERS at required Spacing in both directions and in plumb on the face of pier (also provide shear key and distribution steel bars wherever required in both directions. Step 4: Lower and fix the slide in high strength noncorrosive sacrificial SRM Annular Form Sheets in the spacers and fix it; after complete installation tie all of them together with annular tie bands for enhanced rigidity during casting. Step 5: Mixing the underwater Micro concrete and fill the same using the inlet point provided in SRM patch Form frame or pouring it in SRM Seamless Annular Shell with micro tremie pipes for better reach (for larger depths SRM Annular Form to be provided with Inlet ports for pouring Micro concrete). Use material with suitable consistency for underwater works. observe the fill through transparent window provided in form. Step 6: Over water level or in splash zone, apply abrasion (erosion) resistant FRCM system (Fibre Reinforced Cementitious Matrix) mainly on the upstream sides of pier highly prone to erosive forces. Step 7: Allow to cure and carryout an underwater (after repair and retrofit works) inspection with photography and videography of repair , all complete as per direction of Engineer-In-charge The rate is inclusive of all consumables, materials , labours , Tool tackles, Transportation , Lodging etc. involved. The unit of measurement is in Sqm ( The Repaired area will be considered for measurement)" | 400 | SQM | 75,728 | ₹3,02,91,200 | 0.18% |
| 10.3 | MICRO-CONCRETING: Providing and placing in position Micro-concrete as per relevant ASTM / BS/ IS having Compressive Strength of minimum 45 Mpa (M-45) at 28 days, of make PIDILITE / BASF/ SIKA/ FOSROC or equivalent in columns, beams, slabs etc. which shall be pre-packed single component, chloride free, non- shrink, free flow, self compacting and mixed as per manufacturer's specification, including required leak proof shuttering, pre-soaking of substrate, manual application or pumping, manpower and tools and tackles all complete as per direction of the Engineer-in-Charge. | 2 | M3 | 48,233.09 | ₹96,466.18 | 0.18% |
| 10.4 | Providing & applying anti-carbonation coating (high performanceelastomeric) in 2 coats over one coat OF DEEP penetrating primer ofapproved brand quality and specification provided in the tender. MAKE :Pidilite, BASF, FOSROC, SIKA, CICO, PAREX or equivelent. | 1,000 | M2 | 149.85 | ₹1,49,850 | 0.18% |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Tender-Acceptance-Format.pdf
Additional Documents • 0.08 MB
FAQs-IOCL-Online-EMD.pdf
Additional Documents • 0.55 MB
Bidders_help_Document_for_Preferencial_Bidding_20230207_v1.pdf
Additional Documents • 0.82 MB
Special_Instructions_to_the_Bidders_Version_5_dated_30_June_2025.pdf
Additional Documents • 2.80 MB
TCBID.pdf
Tender Documents • 1.75 MB
BOQ_199513.xls
BOQ • 0.24 MB
CommonDocs.rar
Tender Documents • 30.61 MB
ALL_TENDERDOCS.rar
Tender Documents • 3.92 MB
Corrigendum_02.pdf
PDF • 0.34 MB
TENDER_EXTENSION.pdf
PDF • 0.37 MB
TENDER_EXTENSION.pdf
PDF • 0.37 MB
Corrigendum01_to_GCC_April_2026.pdf
PDF • 2.33 MB
TENDER_EXTENSION.pdf
PDF • 0.37 MB
prebid-Annex-1.pdf
PDF • 1.96 MB
TENDER_EXTENSION.pdf
PDF • 0.37 MB
TENDER_EXTENSION.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .