| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.3 LAccepted-Finance | ₹30.3 L | L1 | Accepted-Finance DUE TO BELOW RATE |
| 2 | L2₹30.3 LRejected-Finance | ₹30.3 L | L2 | Rejected-Finance DUE TO ABOVE RATE |
| 3 | L3₹30.5 LRejected-Finance | ₹30.5 L | L3 | Rejected-Finance DUE TO ABOVE RATE |
Tender Value
₹30.6 L
EMD Value
₹3.1 L
Closing Date
18 May 2026, 5:00 pmClosed
EO NPP BIJNOR
O/O EO NPP BIJNOR
Construction of Park Boundary wall Interloking Tiles work and Ground Play Equipments At Ward No. 12 Moh Khatriyan Kashiram colony Bijnor
2026_DOLBU_1142785_35
128/ET-NPPB/2026-27
Open Tender
Civil Works - Others
90 days
EO NPP BIJNOR
PLEASE PREFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹854
EO NPP BIJNOR
₹3.1 L
16 Jun 2026
28 Apr 2026
19 May 2026
28 Apr 2026
18 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling old existing old Bricks workl or stone work lime or cement mortar an including Stacking or material as direction by engineer in charge with a distance of 60 meter . | 12.19 | Cum | 570 | ₹6,949.61 |
| 2 | Deduction of old and workable brick 40% of item no-3 | 2,243.38 | Cum | -5.5 | - |
| 3 | Excavationinfoundationinordinarysoil(Loam,Clayor Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. | 124.88 | Cum | 180 | ₹22,477.5 |
| 4 | Cartage of ballast kankar coal gritt or sand etc i/c laoding unloading but excluding staking pucca road. | 137.07 | nos | 183.5 | ₹25,151.85 |
| 5 | Concrete in 1:4:8 with cement,fine sand and Stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. | 23.46 | nos | 6,720 | ₹1,57,671.36 |
| 6 | M-150 brick work in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work. | 144.72 | Cum | 5,310 | ₹7,68,482.32 |
| 7 | R.C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage R.C.C Raft Foundation and Footing with 4cm including supply of all material,labour and T&P etc.required for proper completion of work | 15.12 | Sqm | 7,665 | ₹1,15,894.8 |
| 8 | R.C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage R.C.C Lighter Beam Having Span up to 6 m including supply of all material,labour and T&P etc.required for proper completion of work | 9.35 | cum | 8,445 | ₹78,939.05 |
| 9 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone ballast of 2cm guage R.C.C Column including supply of all material,labour and T&P etc.required for proper completion of work | 4.63 | Cum | 8,460 | ₹39,159.23 |
| 10 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work. | 611.38 | Cum | 215 | ₹1,31,447.13 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.13 MB
BOQ_2135304.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid