Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.0 LAdmitted-Finance | ₹33.0 L | L1 | Admitted-Finance |
| 2 | L2₹33.3 LAdmitted-Finance SWAGAT CO OP HSG SOCIETY LTD 22 303 CHATRAPATI SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKTA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | ₹33.3 L | L2 | Admitted-Finance |
| 3 | L3₹36.3 LAdmitted-Finance 1 14 SUJAL MANSION B BLOCK BHANGWADI KALBADEVI ROAD MUMBAI 400 002 | MUMBAI | MAHARASHTRA | 400002 | ₹36.3 L | L3 | Admitted-Finance |
| 4 | L4₹48.9 LAdmitted-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON W MUMBAI 400 104 | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹48.9 L | L4 | Admitted-Finance |
| 5 | L5₹49.5 LAdmitted-Finance | ₹49.5 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHRI SAI ENTERPRISES L6 | BRITE INDUSTRIES L5 | R J ENTERPRISES L10 | sapana enterprises L9 | somnath engineering corporation L11 | Chakshu Enterprise L3 | Shree Ayyappa Engineering L4 | DARSHAN CONSTRUCTION Co. L1 | cooltech engineering services L2 | pk Enterprises L8 | shakti engineering and electrical works L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Repairs and routine maintenance of VRF air-conditioning plants of MITSUBISHI / BLUE STAR make, with outdoor unit capacities ranging from 07 HP to 28 HP, including round-the-clock operation and maintaining the required indoor temperature of 21°C ± 3°C without interruption. The work shall include daily monitoring, periodic servicing, repairs and replacement of unserviceable minor components such as: 1.1 Controlling valves and refrigerant line accessories 1.2 Copper tubing, joints and fittings 1.3 Nitrile rubber insulation for refrigerant piping 1.4 Electrical and electronic components 1.5 Control wiring, communication wiring and earthing 1.6 Sensors, thermistors and related controls 1.7 Thermocol inner packing materials, if required 1.8 Indoor and outdoor fan motor windings/repairs 1.9 Vibration pads and mounting arrangements 1.10 Painting of rusted outdoor unit stands/supports 1.11 Drainage lines, pre-filters and cleaning of indoor units 1.12 Leak testing, gas pressure checks and system performance testing 1.13 All other accessories required for smooth functioning of VRF system Complete all as specified and directed by Engineer-in-Charge. | ||||||||||||||
| 1.01 | Out door units of capacity 07 HP -03 Nos | 11 | Per month | 3,194 ₹35,134 | 3,216 ₹35,376 | 3,170 ₹34,870 | 3,182 ₹35,002 | 6,500 ₹71,500 | 1,350 ₹14,850 | 3,000 ₹33,000 | 6,000 ₹66,000 | 2,000 ₹22,000 | 3,092 ₹34,012 | 3,215 ₹35,365 |
| 1.02 | Out door units of capacity 10 HP -06 Nos | 11 | Per month | 9,017 ₹99,187 | 9,066 ₹99,726 | 9,018 ₹99,198 | 9,032 ₹99,352 | 7,500 ₹82,500 | 6,700 ₹73,700 | 8,900 ₹97,900 | 16,500 ₹1.8 L | 6,000 ₹66,000 | 8,942 ₹98,362 | 9,065 ₹99,715 |
| 1.03 | Out door units of capacity 12 HP -03 Nos | 11 | Per month | 5,417 ₹59,587 | 4,548 ₹50,028 | 5,418 ₹59,598 | 5,432 ₹59,752 | 8,500 ₹93,500 | 4,000 ₹44,000 | 5,200 ₹57,200 | 9,500 ₹1.0 L | 3,400 ₹37,400 | 5,342 ₹58,762 | 3,000 ₹33,000 |
| 1.04 | Out door units of capacity 14 HP -02 Nos | 11 | Per month | 1,542 ₹16,962 | 4,587 ₹50,457 | 4,300 ₹47,300 | 9,000 ₹99,000 | 9,500 ₹1.0 L | 1,480 ₹16,280 | 4,000 ₹44,000 | 7,500 ₹82,500 | 2,500 ₹27,500 | 4,213 ₹46,343 | 4,135 ₹45,485 |
| 1.05 | Out door units of capacity 16 HP -05 Nos | 11 | Per month | 12,450 ₹1.4 L | 11,967 ₹1.3 L | 12,098 ₹1.3 L | 12,018 ₹1.3 L | 12,000 ₹1.3 L | 8,900 ₹97,900 | 11,500 ₹1.3 L | 23,000 ₹2.5 L | 7,900 ₹86,900 | 12,013 ₹1.3 L | 12,025 ₹1.3 L |
| 1.06 | Out door units of capacity 18 HP -01 Nos | 11 | Per month | 2,717 ₹29,887 | 2,667 ₹29,337 | 2,798 ₹30,778 | 2,718 ₹29,898 | 16,000 ₹1.8 L | 1,600 ₹17,600 | 2,600 ₹28,600 | 4,500 ₹49,500 | 1,600 ₹17,600 | 2,350 ₹25,850 | 2,727 ₹29,997 |
| 1.07 | Out door units of capacity 24 HP -02 Nos | 11 | Per month | 7,215 ₹79,365 | 7,167 ₹78,837 | 7,298 ₹80,278 | 9,800 ₹1.1 L | 18,500 ₹2.0 L | 2,350 ₹25,850 | 7,200 ₹79,200 | 13,500 ₹1.5 L | 4,400 ₹48,400 | 7,254 ₹79,794 | 7,227 ₹79,497 |
| 1.08 | Out door units of capacity 26 HP -02 Nos | 11 | Per month | 7,815 ₹85,965 | 7,827 ₹86,097 | 9,811 ₹1.1 L | 7,815 ₹85,965 | 18,500 ₹2.0 L | 1,140 ₹12,540 | 7,500 ₹82,500 | 14,500 ₹1.6 L | 5,000 ₹55,000 | 7,854 ₹86,394 | 7,827 ₹86,097 |
| 1.09 | Out door units of capacity 28 HP -03 Nos | 11 | Per month | 12,615 ₹1.4 L | 10,000 ₹1.1 L | 12,698 ₹1.4 L | 13,000 ₹1.4 L | 22,000 ₹2.4 L | 9,370 ₹1.0 L | 12,300 ₹1.4 L | 24,500 ₹2.7 L | 8,000 ₹88,000 | 15,000 ₹1.6 L | 12,620 ₹1.4 L |
Tender Value
₹47.5 L
EMD Value
₹95,000
Closing Date
30 Mar 2026, 6:00 pmClosed
CWE (NW) Mumbai
CWE (NW) Mumbai
REPAIR/MAINTENANCE OF VRF PLANT AT INHS ASVINI UNDER AGE (I) ASVINI, COLABA, MUMBAI
2026_MES_755825_1
8023/CWE(NW)MUMBAI/E8
Open Tender
Civil Works
330 days
AGE (I) Asvini
Class D
cat c (i)
7 documents required · 7 mandatory
₹500
AGE (I) Asvini
₹95,000
Yes
5 May 2026
11 Mar 2026
1 Apr 2026
11 Mar 2026
30 Mar 2026
25 Mar 2026
11 Mar 2026 - 24 Mar 2026
Repairs and routine maintenance of VRF air-conditioning plants of MITSUBISHI / BLUE STAR make, with outdoor unit capacities ranging from 07 HP to 28 HP, including round-the-clock operation and maintaining the required indoor temperature of 21°C ± 3°C without interruption. The work shall include daily monitoring, periodic servicing, repairs and replacement of unserviceable minor components such as: 1.1 Controlling valves and refrigerant line accessories 1.2 Copper tubing, joints and fittings 1.3 Nitrile rubber insulation for refrigerant piping 1.4 Electrical and electronic components 1.5 Control wiring, communication wiring and earthing 1.6 Sensors, thermistors and related controls 1.7 Thermocol inner packing materials, if required 1.8 Indoor and outdoor fan motor windings/repairs 1.9 Vibration pads and mounting arrangements 1.10 Painting of rusted outdoor unit stands/supports 1.11 Drainage lines, pre-filters and cleaning of indoor units 1.12 Leak testing, gas pressure checks and system performance testing 1.13 All other accessories required for smooth functioning of VRF system Complete all as specified and directed by Engineer-in-Charge.
Out door units of capacity 07 HP -03 Nos
Out door units of capacity 10 HP -06 Nos
Out door units of capacity 12 HP -03 Nos
Out door units of capacity 14 HP -02 Nos
Out door units of capacity 16 HP -05 Nos
Out door units of capacity 18 HP -01 Nos
Out door units of capacity 24 HP -02 Nos
Out door units of capacity 26 HP -02 Nos
Out door units of capacity 28 HP -03 Nos
Four way casette type indoor Unit of any capacity-135 Nos
Split hi wall type indoor Unit of any capacity-98 Nos
Supply and charging of fresh refrigerant gas R-410A in VRF system, including necessary leak checking and topping up to required operating pressure, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of Compressor for VRF outdoor unit of capacity range 28 HP to 26 HP, as per existing catalogue part number, including all necessary electrical/refrigerant connections, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of Control board for VRF outdoor unit of capacity range 28 HP to 26 HP, as per existing catalogue part number, including proper connections and functional testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of M-NET communication board for VRF outdoor unit of capacity range 28 HP to 26 HP, as per existing catalogue part number, including integration with existing control system, complete all as specified and directed by the Engineer-in-Charge
Supply, fixing, testing and commissioning of noise filter for VRF outdoor unit of capacity range 28 HP to 26 HP, as per existing catalogue part number, including all required wiring and performance testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of fan control board (Fan Board) for VRF outdoor unit of capacity range 28 HP to 26 HP, as per existing catalogue part number, including all necessary wiring connections and functional testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of inverter board for VRF outdoor unit of capacity range 28 HP to 16 HP, as per existing catalogue part number, including proper electrical connections and performance testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of motor for VRF outdoor unit of capacity range 28 HP to 26 HP, as per existing catalogue part number, including alignment, electrical termination and operational testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of compressor for VRF outdoor unit of capacity range 18 HP to 16 HP, as per existing catalogue part number, including all refrigerant piping connections, electrical connections and functional testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of control board for VRF outdoor unit of capacity range 18 HP to 16 HP, as per existing catalogue part number, including all required wiring and system integration testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of M-NET communication board for VRF outdoor unit of capacity range 18 HP to 16 HP, as per existing catalogue part number, including connectivity with existing VRF control network, complete all as specified and directed by the Engineer-in-Charge
Supply, fixing, testing and commissioning of noise filter for VRF outdoor unit of capacity range 18 HP to 16 HP, as per existing catalogue part number, including wiring connections and performance verification, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of fan control board (Fan Board) for VRF outdoor unit of capacity range 18 HP to 16 HP, as per existing catalogue part number, including necessary wiring and functional testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of Inverter Board for VRF outdoor unit of capacity range 18 HP to 16 HP, as per existing catalogue part number, including all necessary electrical connections and functional performance testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of motor for VRF outdoor unit of capacity range 18 HP to 16 HP, as per existing catalogue part number, including alignment, electrical termination and operational testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of compressor for VRF outdoor unit of capacity range 14 HP to 10 HP, as per existing catalogue part number, including refrigerant piping connections, electrical connections and functional testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of control board for VRF outdoor unit of capacity range 14 HP to 10 HP, as per existing catalogue part number, including proper wiring connections and system integration testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of M-NET communication board for VRF outdoor unit of capacity range 14 HP to 10 HP, as per existing catalogue part number, including connectivity with existing VRF control network, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of noise filter for VRF outdoor unit of capacity range 14 HP to 10 HP, as per existing catalogue part number, including wiring connections and performance verification, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of Fan Control Board (Fan Board) for VRF outdoor unit of capacity range 14 HP to 10 HP, as per existing catalogue part number, including all necessary wiring connections and functional testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of Inverter Board for VRF outdoor unit of capacity range 14 HP to 10 HP, as per existing catalogue part number, including proper electrical connections and performance testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of motor Model YC9201A for VRF outdoor unit of capacity range 14 HP to 10 HP, as per existing catalogue part number, including alignment, electrical termination and operational testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of compressor for VRF outdoor unit of capacity range 12 HP to 07 HP, as per existing catalogue part number, including refrigerant piping connections, electrical connections and functional testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of control board for VRF outdoor unit of capacity range 12 HP to 07 HP, as per existing catalogue part number, including proper wiring connections and system integration testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of M-NET communication board for VRF outdoor unit of capacity range 12 HP to 07 HP, as per existing catalogue part number, including connectivity with existing VRF control network, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of noise filter for VRF outdoor unit of capacity range 12 HP to 07 HP, as per existing catalogue part number, including wiring connections and performance verification, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of Fan Control Board (Fan Board) for VRF outdoor unit of capacity range 12 HP to 07 HP, as per existing catalogue part number, including all necessary wiring connections and functional testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of Inverter Board for VRF outdoor unit of capacity range 12 HP to 07 HP, as per existing catalogue part number, including proper electrical connections and performance testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of motor for VRF outdoor unit of capacity range 12 HP to 07 HP, as per existing catalogue part number, including alignment, electrical termination and operational testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of PCB (Printed Circuit Board) for VRF indoor units (four-way cassette / hi-wall type), including proper electrical connections and functional testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of drain pump for VRF indoor units (four-way cassette / hi-wall type), including necessary connections and operational testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of blower motor for VRF indoor units (four-way cassette / hi-wall type), including alignment, electrical termination and performance testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of Linear Expansion Valve (LEV) for VRF indoor units (four-way cassette / hi-wall type), including refrigerant circuit integration and functional testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of Addressing Board for VRF indoor units (four-way cassette / hi-wall type), including proper electrical connections, addressing configuration and functional testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of Remote Controller for VRF indoor units (four-way cassette / hi-wall type), including necessary wiring/communication connection and operational testing, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing and replacement of perforated cable tray of size 300 mm × 50 mm made out of 2.0 mm thick pre-galvanised steel sheet, powder coated and hot dip treated, including dismantling and removal of old unserviceable/damaged cable tray, complete all as specified and directed by the Engineer-in-Charge.
Supply, installation, testing and commissioning of mirror finish hard drawn copper refrigerant piping of size 25 mm to 42 mm dia, suitable for VRF system, including all required fittings such as bends, elbows, tees and internal joint type connectors. The complete piping shall be pressure tested for requisite working pressure and supported at intervals of 2.4 metres. All refrigerant piping shall be provided with thermal insulation of 19/13 mm thick Class “O” Armaflex nitrile rubber insulation. The piping shall be laid in GI tray, including dismantling and removal of old unserviceable/damaged refrigerant pipes, complete all as specified and directed by the Engineer-in-Charge.
All as per Item No. 38 above, but for hard drawn copper refrigerant piping of size 6.5 mm to 16 mm dia, including insulation, fittings, pressure testing, supports, laying in GI tray and removal of old unserviceable piping, complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of condenser coil for VRF outdoor unit of capacity 7 HP, including nitrogen leak testing and all necessary connections, complete all as specified and directed by the Engineer-in-Charge.
Ditto all as per Item No. 40.00 above, but for VRF outdoor unit of capacity 10 HP.
Ditto all as per Item No. 40.00 above, but for VRF outdoor unit of capacity 14 HP.
Ditto all as per Item No. 40.00 above, but for VRF outdoor unit of capacity 16 HP.
Ditto all as per Item No. 40.00 above, but for VRF outdoor unit of capacity 18 HP.
Ditto all as per Item No. 40.00 above, but for VRF outdoor unit of capacity range 24 HP to 28 HP.
Supply, fixing, testing and commissioning of cooling/evaporator coil for VRF indoor unit (four-way cassette / hi-wall type), complete all as specified and directed by the Engineer-in-Charge.
Ditto all as per Item No. 41.00 above, but for VRF indoor unit cooling/evaporator coil.
Supply, fixing, testing and commissioning of motor board for VRF indoor units (four-way cassette / hi-wall type), complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning in replacement of various types of sensors for VRF indoor units (four-way cassette / hi-wall type), complete all as specified and directed by the Engineer-in-Charge.
Supply, fixing, testing and commissioning of solenoid valve for VRF indoor units (four-way cassette / hi-wall type), complete all as specified and directed by the Engineer-in-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_846597.xls
BOQ • 6.32 MB
8023.rar
Tender Documents • 3.31 MB
Download all tender documents and submit your bid