| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAccepted-AOC NAN | ₹5.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.8 CrRejected-Finance | ₹5.8 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹5.9 CrRejected-Finance | ₹5.9 Cr | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S VIVEK KUMAR SINGH L3 | M/S LODHI ENTERPRISES L2 | M/s Bajrang Construction & Suppliars L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in Mar, Rankar and Kabar mixed soils with lead up to 30m. and initial lift up to 1.5m. including dressing, proper disposal of excvated earth, all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge. | 8,665.23 | Cum. | 108 ₹9,35,844.84 | 98 ₹8,49,192.54 | 80 ₹6,93,218.4 |
| 2.00 | Earth work in filling in Mar, Kabar, Ranker & Kanker mixed soil with 2 Km. lead and inial lift by Power Transport including manual compaction, dressing, making profile etc. proper completion of work as per direction of Engineer-in-charge | 2,189.29 | Cum. | 251 ₹5,49,511.79 | 246.96 ₹5,40,667.06 | 200 ₹4,37,858 |
| 3.00 | Providing and laying 1:3:6 cement concrete with cement, coarse sand & stone grite including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge | 945.03 | Cum. | 5,575 ₹52,68,542.25 | 5,464.08 ₹51,63,719.52 | 4,900 ₹46,30,647 |
| 4.00 | Centering & Shuttering for R.C.C./C.C. work including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 8,511.37 | Sqm. | 572 ₹48,68,503.64 | 558.6 ₹47,54,451.28 | 520 ₹44,25,912.4 |
| 5.00 | Providing and laying 1:2:4 cement concrete with cement, coarse sand & stone grite including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge | 167.74 | Cum. | 5,712 ₹9,58,130.88 | 5,586 ₹9,36,995.64 | 5,200 ₹8,72,248 |
| 6.00 | Providing & Laying R.C.C. 1:1½:3 with cement, coarse sand & stone grite including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge | 2,628.8 | Cum. | 6,833 ₹1,79,62,590.4 | 6,693.4 ₹1,75,95,609.92 | 6,100 ₹1,60,35,680 |
| 7.00 | Providing steel reinforcement with cutting, bending, placing in position with binding with G.I. wire including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 122.18 | MT | 72,532 ₹88,61,959.76 | 72,500 ₹88,58,050 | 68,000 ₹83,08,240 |
| 8.00 | R.C.R. stone masonry in 1:3 cement sand mortar including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge | 340.96 | Cum. | 6,384 ₹21,76,688.64 | 6,223 ₹21,21,794.08 | 5,850 ₹19,94,616 |
| 9.00 | Providing and laying coarse sand filter in slope below stone boulder pitching including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge | 1,429.13 | Cum. | 1,918 ₹27,41,071.34 | 1,870 ₹26,72,473.1 | 1,550 ₹22,15,151.5 |
| 10.00 | Providing and laying stone grit filter in slope including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge | 1,429.13 | Cum. | 2,320 ₹33,15,581.6 | 2,254 ₹32,21,259.02 | 2,000 ₹28,58,260 |
Tender Value
Refer Docs
EMD Value
₹11.9 L
Closing Date
13 Feb 2026, 3:00 pmClosed
SE ICC MAHOBA
SE ICC BAZARIYA MAHOBA
Strengthening and Laying Stone boulder pitching of Common bank between Arjun Feeder Canal and Dhashan Main Canal.
2026_UPIDC_1112067_1
08/SE/2025-26
Open Tender
Civil Works
455 days
MAHOBA
as per tender nit and tender document
2 documents required · 2 mandatory
₹8,614
₹11.9 L
11 Mar 2026
4 Feb 2026
13 Feb 2026
4 Feb 2026
13 Feb 2026
4 Feb 2026
Earth work in excavation of foundation in Mar, Rankar and Kabar mixed soils with lead up to 30m. and initial lift up to 1.5m. including dressing, proper disposal of excvated earth, all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge.
Earth work in filling in Mar, Kabar, Ranker & Kanker mixed soil with 2 Km. lead and inial lift by Power Transport including manual compaction, dressing, making profile etc. proper completion of work as per direction of Engineer-in-charge
Providing and laying 1:3:6 cement concrete with cement, coarse sand & stone grite including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge
Centering & Shuttering for R.C.C./C.C. work including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
Providing and laying 1:2:4 cement concrete with cement, coarse sand & stone grite including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge
Providing & Laying R.C.C. 1:1½:3 with cement, coarse sand & stone grite including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge
Providing steel reinforcement with cutting, bending, placing in position with binding with G.I. wire including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
R.C.R. stone masonry in 1:3 cement sand mortar including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge
Providing and laying coarse sand filter in slope below stone boulder pitching including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge
Providing and laying stone grit filter in slope including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge
Providing and Laying Dry Stone Boulder Pitching including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge
Providing and laying Moorum on top of common bank all lead & lift including all cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge
Type-A "W" : Metal Beam Crash Barrier Providing and Erecting a "W" metal beam crash barner comprising of 3mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMCseries channel vertical post, 150x75x5 mm spaced 2 m centre to centre, 1.8 m hight, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS 1367 and IS 1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.49 MB
TDArjun.pdf
Tender Documents • 6.19 MB
BOQ_2056386.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid