Tender Value
₹7.9 Cr
EMD Value
₹7.9 L
Closing Date
17 Apr 2026, 4:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Commissioner
Bhupalpally
Laying of Internal Roads and Drains in 1 to 30 Wards in Bhupalapally Municipality Nagaraabhivrudhi Grant
692272
Short Tender Notice No. E1/CT. No: 01/02/MCBHPL/e-procurement/2026, Dt. 09.04.20226
OPEN
Civil Works
JAYASHANKAR BHUPALPALLY
13 documents required · 12 mandatory · 1 optional
₹11,800
₹7.9 L
10 Apr 2026
10 Apr 2026
10 Apr 2026
RBR-EECD-15: Construction of subgrade with approved material obtained from borrow pits with all leads and lifts including pre-watering of soil, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (5th revision).
RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTHCement Concrete M15 & M20 (Manual means)
RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTHReinforced Cement Concrete and prestressed Concrete (Manual means)
RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means by using Hydraulic excavator including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge.
RBR-SBBS-1 A III: Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge
Providing P.C.C grade M 10 concrete using 20 mm graded metal hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
RBR-CCPV-5-Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 350 kg per cum or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
Vaccum dewatering of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length,vaccum pump to maintain vaccum pressure 0.7-0.8 atmosphere as per the standard procedure,floating with power floater,vibrating using Screed vibrator, mechanical trowelling, finishing with sound edges and corners,including hire and operational charges of machinery ,labour,fuel etc,complete for finished item as directed by the Engineer-in-Charge.
Groove Cutting of 2-4 mm for 1/3rd depth of concrete slab using concrete groove cutting machine with diamond studded saw within 24 hours of casting of CC pavement including labour charges etc,complete for finished item as directed by the Engineer-in-Charge
Carting of surplus excavated earth upto a lead of 5kms from the site to a distance suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.
RBR-STCL-15:Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately.
RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTHCement Concrete M15 & M20 (Manual means)
RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTHReinforced Cement Concrete and prestressed Concrete (Manual means)
RBR-STCL-7B : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar
RBR-FNDN-1: B i: Earthwork excavation in ordinary soil by mechanical means up to 3 mts depth for structures as per drawing and technical specifications Clause 305.1 including disposal upto a lead of 50 m, dressing of sides and bottom as per Technical Specification 305 MORD / 304 MORTH.
RBR-FNDN-1: A i: Earthwork excavation in ordinary soil by manual means up to 3 mts depth for structures as per drawing and technical specifications Clause 305.1 including disposal upto a lead of 50 m, dressing of sides and bottom as per Technical Specification 305 MORD / 304 MORTH
Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.
BLD-CSTN-2-8 (16): Collection, Supply and filling with HBG stone chips 2.36 mm & below from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
RBR-FNDN-4 I(i) : Providing P.C.C grade M 10 concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and under flooring bed.
RBR-FNDN-4 II (iii) : Providing P.C.C grade M 15 (MORD), Nominal mix (1:2.5:5) concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. For base slab
RBR-FNDN-4 II (iii) : Providing P.C.C grade M 15 (MORD), Nominal mix (1:2.5:5) concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. For Side Wall
RBR-FNDN-4 C (i): Providing R.C.C grade M 20 (Nominal Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. for Base Slab
RBR-FNDN-4 C (i): Providing R.C.C grade M 20 (Nominal Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. for Side Wall
RBR-FNDN-4 II(iii): Providing P.C.C grade M 15 Nominal mix concrete for structures using 20mm size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and all other incidental charges for complete finished item of work as directed by the Engineer in Charge For Channel Portion
RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for Culvert slabs.
BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126
Carting of surplus excavated rock/Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.
Supplying and fixing of 100 mm dia PVC pipes for weep holes including material, labour charges like cutting size, fixing in side wall etc as directed by Engineer- in- charge
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BHPL 10 NIT.docx
TENDER_DOCUMENT • 0.03 MB
BOQItem roads 10 cr.xls
TENDER_DOCUMENT • 0.41 MB
ADVT 09.04.2026.pdf
TENDER_DOCUMENT • 0.00 MB
Download all tender documents and submit your bid