Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance B 84 SATYAJIT PARK B 84 SATYAJIT PARK J P AVENUE DURGAPUR 713211 713211 BARDHAMAN WEST BENGAL 713211 | PASCHIM BARDHAMAN | WEST BENGAL | 713211 | +1.18% | ₹2.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 Cr+₹52,021.36 (0.20%)Admitted-Finance | +1.38% | ₹2.6 Cr+₹52,021.36 (0.20%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Not Qualified |
| 4 | Rejected-Technical 1 NO MOHISHILA COLONY DAKSHIN PARA ASANSOL 3 PASCHIM BARDHAMAN 713303 | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | - | - | - | Rejected-Technical Not Qualified |
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
10 Aug 2026, 3:00 pmClosed
Superintending Engineer(CIVIL), RCFA, Housing Dte.
O/o The SE, RCFA, Housing Dte., Kalyanpur Satellite Township Asansol - 05
Construction of Drain Conc. Road and Boudary wall
2026_HSD_1032681_1
WBHOUSNG/RCFA/eNIT01_2nd/26-27
Open Tender
CIVIL WORKS
Percentage
180 days
ANDAL, BAPL LAND, ANDAL BLOCK
Please refer Tender documents.
4 documents required · 4 mandatory
₹5.2 L
Yes
O/o The SE, RCFA, Housing Dte., Asansol
18 Sept 2026
15 Jul 2026
12 Aug 2026
15 Jul 2026
10 Aug 2026
17 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.Depth of excavation not exceeding 1,500 mm. | 1 | m3 | 119.27 | ₹119.15 |
| 2 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket pacity including cutting and loading in tippers --- etc. | - | m2 | 37.3 | - |
| 3 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc.a) With earth obtained from excavation of foundation and road. | - | m2 | 77.54 | - |
| 4 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 1 | m2 | 24 | ₹23.98 |
| 5 | Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety] in 1:3:6 proportion. | 1 | m3 | 4,702.53 | ₹4,697.83 |
| 6 | Batch Mixed Concrete | - | m3 | 5,757.9 | - |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (Pakur Variety ) | 1 | m3 | 4,828.47 | ₹4,823.64 |
| 8 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (Pakur Variety ) | 1 | m3 | 5,335.23 | ₹5,329.89 |
| 9 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation and upto roof of ground floor/upto 4 M. For Tor Steel/Mild Steel of JSW/ JSPL/ SHYAM make | 1 | MT | 54,741.46 | ₹54,686.72 |
| 10 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm shuttering without staging in foundation. | 1 | m2 | 205 | ₹204.8 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
Tendernotice_2.pdf
PDF • 0.55 MB
BOQ_2536148.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .