Tender Value
Refer Docs
EMD Value
₹25 L
Closing Date
26 May 2025, 3:00 pmClosed
PR & CC
This tender is being floated for SITC of Emission control System for tank truck loading operations at HPCL
2500020508-HD-09050
5100020508
Open Tender
Unknown (Unspecified Location)
₹0
₹25 L
26 May 2025
5 May 2025
26 May 2025
26 May 2025
5 May 2025 - 21 May 2025
12 May 2025
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | DESIGN, ENGINEERING & | DESIGN, ENGINEERING & — "ECS/VRS: DESIGN, ENGINEERING, APPROVALS OFDOCUMENTS. BIDDER SHALL SUBMIT TPIA APPROVED/VETTEDDESIGN DOCUMENTS, QUALITY DOCUMENTS, DESIGN DRAWINGS &CALCULATIONS, DTASHEETS ETC FOR REVIEW/APPROVAL OF HPCL.BIDDER SHALL ARRANGE & OBTAIN ALL RELEVANT STATUTORYAPPROVALS (e.g., COMPLIANCE TO CPCB NORMS etc) AS REQUIRED FORTHE SKID MOUNTED VAPOR RECOVERY SYSTEM FOR PRODUCT MOTORSPIRIT (MS) VAPOR GENERATED FROM TANK TRUCK, AND MEETINGSTIPULATED EMISSION LEVEL OF HYDROCARBON VAPOR AS PERSTIPULATED CONDITIONS SPECIFIED IN THE MINISTRY OFENVIRONMENT AND FORESTS GUIDELINES.THE SYSTEM SHALL BE COMPLETE OPEERATING OPERATING UNITINCLUDING ALL REQUIRED AUXILIARY EQUIPMENST FOR EFFICIENTAND SATISFACTORY OPERATION AS A WHOLE. BIDDER SHAALL BERESPONSIBLE FOR FURNISHING ALL MECHAANICAL, ELECTRICAL,INSTRUMENTATION, STRUCTURAL, PIPING, PRESSURE VESSELS ANDOTHER INTERCONNECTING AND SAFETY ITEMS AS REQUIRED TOMAKE THE SYSTEM COPLETEVRU SKID SHALL CONSIST OF COMPLETE EQUIPMENTS/ITEMS SUCHAS ACTIVATED CARBON ABSORBER (ACAD) WITH SUCTION BLOWER (IFREQUIRED), SUPPLY & RETURN CENTRIFUGAL PUMP SETS OFSUITABLE CAPACITY AND HEAD , DRY VACUUM PUMP OF SUITABLECAPACITY WITH SUITABLE HEAD FOR REMOVAL OF HC VAPOR FROMACTIVATED CARBON ADSORBER, VESSELS, BLOWERS, ABSORPTIONCOLUMN (PACKED COLUMN AND WITH DEMISTER PAD) CONDENSERS,COMPRESSSORS, ANY OTHER EQUIPMENTS AS PER THEOFFERD/APPROVED PROCESS/P&ID AND ALL INTERCONNECTINGPIPINGS, STRUCTURES & INSTRUMENTATIONS ON A SINGLE SKIDREQUIRED FOR THE PROPER FUNCTIOING OF THE SYSTEM & IN AREADY TO START CONDITIONETC. FOR CIRCULATION OF MS-III/ MS-IVLIQUID IN ABSORPTION COLUMN AND ALSO TO TRANSFER OFABSORBED LIQUID TO STORAGE TANK THROUGH PIPELINE. BIDDERSHALL SUBMIT THE DESIGN CALCULATION REPORTS, ALL DRAWING &DOCUMENTS DULY VETTED BY HPCL APPROVED THIRD PARTYINSPECTION AGENCY(TPA)AS APPLICABLE AS PER TENDER TERMS" | - | Lump Sum |
| 2 | VRU SUPPLY | VRU SUPPLY — "ECS/VRS SKID COMPLETE: MANUFACTURING, FABRICATION,ASSEMBLY, TESTING, INSPECTION AND SUPPLY OF VRU AT SITE AS PERAPPROVED DESIGN AND DRAWINGS INCLUDING PACKING, LOADING,FORWARDING, TRANSPORTATION (ON FOT SITE BASIS), TRANSITINSURANCE, UNLOADING, SUPPLY, DELIVERY, STORAGEERECTION/INSTALLATION, COMISSIOING AND PERFORMANCETESTING OF THE SKID MOUNTED VAPOR RECOVERY SYSTEM FORPRODUCT, MOTOR SPIRIT (MS), VAPOR GENERATED FROM TRUCK &TANK WAGON LOADING GANTRY, MEETING STIPULATED EMISSIONLEVEL OF HYDROCARBON VAPOR AS PER STIPULATED CONDITIONSSPECIFIED IN THE MINISTRY OF ENVIRONMENT AND FORESTSGUIDELINES. THE SYSTEM SHALL BE COMPLETE OPEERATINGOPERATING UNIT INCLUDING ALL REQUIRED AUXILIARYEQUIPMENST FOR EFFICIENT AND SATISFACTORY OPERATION AS AWHOLE. BIDDER SHAALL BE RESPONSIBLE FOR FURNISHING ALLMECHAANICAL, ELECTRICAL, INSTRUMENTATION, STRUCTURAL,PIPING, PRESSURE VESSELS AND OTHER INTERCONNECTING ANDSAFETY ITEMS AS REQUIRED TO MAKE THE SYSTEM COPLETEVRU SKID SHALL CONSIST OF COMPLETE EQUIPMENTS/ITEMS SUCHAS ACTIVATED CARBON ABSORBER (ACAD) WITH SUCTION BLOWER (IFREQUIRED), SUPPLY & RETURN CENTRIFUGAL PUMP SETS OFSUITABLE CAPACITY AND HEAD , DRY VACUUM PUMP OF SUITABLECAPACITY WITH SUITABLE HEAD FOR REMOVAL OF HC VAPOR FROMACTIVATED CARBON ADSORBER, VESSELS, BLOWERS, ABSORPTIONCOLUMN (PACKED COLUMN AND WITH DEMISTER PAD) CONDENSERS,COMPRESSSORS, ANY OTHER EQUIPMENTS AS PER THEOFFERD/APPROVED PROCESS/P&ID AND ALL INTERCONNECTINGPIPINGS, STRUCTURES & INSTRUMENTATIONS ON A SINGLE SKIDREQUIRED FOR THE PROPER FUNCTIOING OF THE SYSTEM & IN AREADY TO START CONDITIONETC. FOR CIRCULATION OF MS-III/ MS-IVLIQUID IN ABSORPTION COLUMN AND ALSO TO TRANSFER OFABSORBED LIQUID TO STORAGE TANK THROUGH PIPELINE. BIDDERSHALL SUBMIT THE DESIGN CALCULATION REPORTS, ALL DRAWING &DOCUMENTS DULY VETTED BY HPCL APPROVED THIRD PARTYINSPECTION AGENCY(TPA)AS APPLICABLE AS PER TENDER TERMS." | - | Lump Sum |
| 3 | VRU INSTALLATIONS | VRU INSTALLATIONS — "UNLOADING, STORAGE AT SITE, SITE SECURITY OF MATERIALS, SITEHANDLING, INSTALLATION/ERECTION, TESTING, PAINTING, OFMECHANICAL, ELECTRICAL AND INSTRUMENTATION EQUIPMENT OFVAPOR RECOVERY SYSTEM. CIVIL WORK IS EXCLUDED FROM THESUPPLIER SCOPE. HOWEVER, DESIGN, PREPARATION OF CIVILDRAWINGS AND STAGE VERIFICATION OF DIMENSIONS OF CIVILSTRUCTURES ARE INCLUDED IN THE BIDDER SCOPE. SUPPLY OF 415VOLT ELECTRICAL POWER, HEADER PIPE FROM TLF GANTRY ARE NOTINCLUDED IN THE BIDDER SCOPE." | - | Lump Sum |
| 4 | COMISSIOINIG AND SAT OF | COMISSIOINIG AND SAT OF — "PRE-COMMISSIONING, SUCCESSFUL COMMISSIONING OF VAPORRECOVERY SYSTEM AT SITE AND SUCCESSFUL COMPLETION OF THESITE ACCEPTANCE TEST (SAT). SUCESSFUL COMISSIOINING OR SAT ISDEFINNED AS COMPLIANCE OF ALL PUNCH POINTS BY THE VENDORAND ACCEPTED BY HPCL EIC" | - | Lump Sum |
| 5 | FOR 1st YEAR AMC VAPOUR | FOR 1st YEAR AMC VAPOUR — "FOR 1st YEAR AMC VAPOUR RECOVERY UNITS WITHOUTSPARES/ITEMS/PARTS" | - | each |
| 6 | FOR 2nd YEAR AMC VAPOUR | FOR 2nd YEAR AMC VAPOUR — "FOR 2nd YEAR AMC VAPOUR RECOVERY UNITS WITHOUTSPARES/ITEMS/PARTS" | - | each |
| 7 | FOR 3rd YEAR AMC VAPOUR | FOR 3rd YEAR AMC VAPOUR — "FOR 3rd YEAR AMC VAPOUR RECOVERY UNITS WITHOUTSPARES/ITEMS/PARTS" | - | each |
| 8 | FOR 4th YEAR AMC VAPOUR | FOR 4th YEAR AMC VAPOUR — "FOR 4th YEAR AMC VAPOUR RECOVERY UNITS WITHOUTSPARES/ITEMS/PARTS" | - | each |
| 9 | FOR 5th YEAR AMC VAPOUR | FOR 5th YEAR AMC VAPOUR — "FOR 5th YEAR AMC VAPOUR RECOVERY UNITS WITHOUTSPARES/ITEMS/PARTS" | - | each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.