Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | ₹6.0 L | L1 | Accepted-AOC Found lowest one bidder |
| 2 | L2₹7.0 L+₹1.0 L (16.9%)Rejected-AOC BOGDANG | ₹7.0 L+₹1.0 L (16.9%) | L2 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹6 L
Closing Date
5 Oct 2022, 2:00 pmClosed
Executive Engineer
REW Leh
Construction of drainage including soakpit at Maneysermo Community
2022_RDD_7820_10
NIT 32 - UTL REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Payable To Executive Engineer
Exempted
7 Feb 2023
27 Sept 2022
7 Oct 2022
27 Sept 2022
5 Oct 2022
27 Sept 2022
Amount
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Earth work in excavation by manual means over areas (Exceeding 30cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed : Ordinary rock
Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1 :6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)
Providin.9 and laying in position specified grade of reinforced cement concrete excluding the cost of centenng. shuttering, finishing and reinforcement-All work upto plinth level.1.1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size)
Centring and shuttermg including strutting, propping etc. and removal of form for pended floors, roofs, landings, balco nies and access platform
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars
providing and laying HDPE pipe /PVC 150mm (heavy ) 6kgs including placing in position all complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- all work upto plinth level 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) (A) Crushed
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) (B) Nallah
Centring and shuttermg including strutting, propping etc. and removal of form for· Foundations: footings, bases of columns etc. for mass concrete.
Strctural steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Chequerred precast cement concrete tiles 22mm thick in footpath & courtyard jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) .Dark shade using ordinary cement.
carriage of stone average distance of 20kms byMT
carriage of sand and bajree average distance of 20 kms byMT
carriage of earth dispose beyond avg distance of 5km by MT
M/S SHAMSHER ALI
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .