| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAdmitted-Finance | ₹3.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.2 CrAdmitted-Finance 947 C ASHOK NAGAR COLONY HUMAYUNPUR POLICE STATION GORAKHNATH DISTRICT GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | ₹3.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹3.3 CrAdmitted-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹3.3 Cr | L3 | Admitted-Finance |
| 4 | L4₹3.3 CrAdmitted-Finance | ₹3.3 Cr | L4 | Admitted-Finance |
| 5 | L5₹3.3 CrAdmitted-Finance KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹3.3 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S CHAUDHARY ENTERPRISES L3 | M/S RUCHI CONSTRUCTION CO L4 | Durga Engineers and Earth Movers L5 | RANJEET SINGH L2 | VIRAT CONSTRUCTION L6 | M/S ASHTBHUJA L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Dismantling of brick work including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge | 116.46 | M3 | 50 ₹5,823 Lowest | 600 ₹69,876 | 55 ₹6,405.3 | 600 ₹69,876 | 618.9 ₹72,077.09 | 600 ₹69,876 |
| 1.02 | Dismantling of CC (1:4:8) including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge | 33.14 | M3 | 400 ₹13,256 | 400 ₹13,256 | 450 ₹14,913 | 650 ₹21,541 | 398.73 ₹13,213.91 Lowest | 650 ₹21,541 |
| 1.03 | Dismantling of RCC including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge | 61.91 | M3 | 800 ₹49,528 Lowest | 800 ₹49,528 Lowest | 800 ₹49,528 Lowest | 920 ₹56,957.2 | 829.27 ₹51,340.11 | 920 ₹56,957.2 |
| 1.04 | Earth work in making Road Diversion for V.R.B. Construction including all lead , lift, labour and T&P etc.as per direction of engineer in charge | 1,620 | M3 | 50 ₹81,000 | 5 ₹8,100 Lowest | 60 ₹97,200 | 165 ₹2,67,300 | 48.92 ₹79,250.4 | 165 ₹2,67,300 |
| 1.05 | Earth work in excavation for foundation including back filling with all lead & lift labour and T&P etc for completion of work as direction of Engineer-in-Charge | 5,291.94 | M3 | 100 ₹5,29,194 | 30 ₹1,58,758.2 Lowest | 100 ₹5,29,194 | 70 ₹3,70,435.8 | 127.69 ₹6,75,727.82 | 70 ₹3,70,435.8 |
| 1.06 | Centering & shutering for C.C. block including cost of all material , labour and T&P etc | 123.6 | M2 | 600 ₹74,160 | 600 ₹74,160 | 600 ₹74,160 | 580 ₹71,688 Lowest | 643.85 ₹79,579.86 | 580 ₹71,688 Lowest |
| 1.07 | Centering & shutering for R.C.C. works including all cost of materials, labour and T&P etc. required for proper completion of the work.as per direction of engineer in charge | 888.66 | M3 | 900 ₹7,99,794 | 1,000 ₹8,88,660 | 900 ₹7,99,794 | 710 ₹6,30,948.6 Lowest | 993.17 ₹8,82,590.45 | 710 ₹6,30,948.6 Lowest |
| 1.08 | Cutting, bending, binding of reinforcement(Fe500) and placing in proper position including all cost of material with steel, labour and T&P etc. required for porper completion of the work as per drawing in direction of engineer-in-charge | 104.58 | MT | 91,000 ₹95,16,780 | 91,000 ₹95,16,780 | 91,000 ₹95,16,780 | 75,000 ₹78,43,500 Lowest | 89,437.15 ₹93,53,337.15 | 75,000 ₹78,43,500 Lowest |
| 1.09 | Laying of cement concrete ( 1:2:4) with all material, labour, T&P etc. required for proper completion of work with coarse sand F.M. not less than 2.00 with Aggregate size (20mm to 40mm) | 605.97 | M3 | 9,100 ₹55,14,327 | 9,800 ₹59,38,506 | 9,000 ₹54,53,730 Lowest | 11,300 ₹68,47,461 | 9,640.67 ₹58,41,956.8 | 11,000 ₹66,65,670 |
| 1.10 | Laying of concrete mixed of grade (M-25) ncluding all cost of materials, labour and T&P etc. as per direction of engineer-in-charge | 1,269.81 | M3 | 11,100 ₹1,40,94,891 | 11,000 ₹1,39,67,910 Lowest | 11,200 ₹1,42,21,872 | 11,179 ₹1,41,95,205.99 | 11,280.15 ₹1,43,23,647.27 | 11,179 ₹1,41,95,205.99 |
Tender Value
₹3.5 Cr
EMD Value
₹7.0 L
Closing Date
19 May 2026, 11:00 amClosed
Superintending Engineer
Office Superintending Engineer 14th Circle Irrigation Work Azamgarh
3 pcs. Box Culvert
2026_UPIDC_1147526_1
01/S.E./2026-27
Open Tender
Civil Works
Item Rate
180 days
Sultanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,900
₹7.0 L
Yes
Azamgarh
25 Jun 2026
13 May 2026
19 May 2026
13 May 2026
19 May 2026
13 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of brick work including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge | 116.46 | M3 | - | - |
| 1.02 | Dismantling of CC (1:4:8) including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge | 33.14 | M3 | - | - |
| 1.03 | Dismantling of RCC including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge | 61.91 | M3 | - | - |
| 1.04 | Earth work in making Road Diversion for V.R.B. Construction including all lead , lift, labour and T&P etc.as per direction of engineer in charge | 1,620 | M3 | - | - |
| 1.05 | Earth work in excavation for foundation including back filling with all lead & lift labour and T&P etc for completion of work as direction of Engineer-in-Charge | 5,291.94 | M3 | - | - |
| 1.06 | Centering & shutering for C.C. block including cost of all material , labour and T&P etc | 123.6 | M2 | - | - |
| 1.07 | Centering & shutering for R.C.C. works including all cost of materials, labour and T&P etc. required for proper completion of the work.as per direction of engineer in charge | 888.66 | M3 | - | - |
| 1.08 | Cutting, bending, binding of reinforcement(Fe500) and placing in proper position including all cost of material with steel, labour and T&P etc. required for porper completion of the work as per drawing in direction of engineer-in-charge | 104.58 | MT | - | - |
| 1.09 | Laying of cement concrete ( 1:2:4) with all material, labour, T&P etc. required for proper completion of work with coarse sand F.M. not less than 2.00 with Aggregate size (20mm to 40mm) | 605.97 | M3 | - | - |
| 1.1 | Laying of concrete mixed of grade (M-25) ncluding all cost of materials, labour and T&P etc. as per direction of engineer-in-charge | 1,269.81 | M3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.15 MB
Biddocument1.pdf
Tender Documents • 1.93 MB
BOQ_2147327.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].