Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.2 Cr+₹1.8 L (0.56%)Rejected-AOC 947 C ASHOK NAGAR COLONY HUMAYUNPUR POLICE STATION GORAKHNATH DISTRICT GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹3.3 Cr+₹8.8 L (2.74%)Rejected-AOC 99 SUSHILA BIHAR BHUD BULANDSHAHAR | L3 | Rejected-AOC L3 | |
| 4 | L4₹3.3 Cr+₹9.5 L (2.95%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹3.3 Cr+₹9.7 L (3.02%)Rejected-AOC KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | M/S CHAUDHARY ENTERPRISES L3 | M/S RUCHI CONSTRUCTION CO L4 | Durga Engineers and Earth Movers L5 | RANJEET SINGH L2 | VIRAT CONSTRUCTION L6 | M/S ASHTBHUJA L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Dismantling of brick work including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge | 116.46 | M3 | 50 ₹5,823 Lowest | 600 ₹69,876 | 55 ₹6,405.3 | 600 ₹69,876 | 618.9 ₹72,077.09 | 600 ₹69,876 |
| 1.02 | Dismantling of CC (1:4:8) including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge | 33.14 | M3 | 400 ₹13,256 | 400 ₹13,256 | 450 ₹14,913 | 650 ₹21,541 | 398.73 ₹13,213.91 Lowest | 650 ₹21,541 |
| 1.03 | Dismantling of RCC including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge | 61.91 | M3 | 800 ₹49,528 Lowest | 800 ₹49,528 Lowest | 800 ₹49,528 Lowest | 920 ₹56,957.2 | 829.27 ₹51,340.11 | 920 ₹56,957.2 |
| 1.04 | Earth work in making Road Diversion for V.R.B. Construction including all lead , lift, labour and T&P etc.as per direction of engineer in charge | 1,620 | M3 | 50 ₹81,000 | 5 ₹8,100 Lowest | 60 ₹97,200 | 165 ₹2,67,300 | 48.92 ₹79,250.4 | 165 ₹2,67,300 |
| 1.05 | Earth work in excavation for foundation including back filling with all lead & lift labour and T&P etc for completion of work as direction of Engineer-in-Charge | 5,291.94 | M3 | 100 ₹5,29,194 | 30 ₹1,58,758.2 Lowest | 100 ₹5,29,194 | 70 ₹3,70,435.8 | 127.69 ₹6,75,727.82 | 70 ₹3,70,435.8 |
| 1.06 | Centering & shutering for C.C. block including cost of all material , labour and T&P etc | 123.6 | M2 | 600 ₹74,160 | 600 ₹74,160 | 600 ₹74,160 | 580 ₹71,688 Lowest | 643.85 ₹79,579.86 | 580 ₹71,688 Lowest |
| 1.07 | Centering & shutering for R.C.C. works including all cost of materials, labour and T&P etc. required for proper completion of the work.as per direction of engineer in charge | 888.66 | M3 | 900 ₹7,99,794 | 1,000 ₹8,88,660 | 900 ₹7,99,794 | 710 ₹6,30,948.6 Lowest | 993.17 ₹8,82,590.45 | 710 ₹6,30,948.6 Lowest |
| 1.08 | Cutting, bending, binding of reinforcement(Fe500) and placing in proper position including all cost of material with steel, labour and T&P etc. required for porper completion of the work as per drawing in direction of engineer-in-charge | 104.58 | MT | 91,000 ₹95,16,780 | 91,000 ₹95,16,780 | 91,000 ₹95,16,780 | 75,000 ₹78,43,500 Lowest | 89,437.15 ₹93,53,337.15 | 75,000 ₹78,43,500 Lowest |
| 1.09 | Laying of cement concrete ( 1:2:4) with all material, labour, T&P etc. required for proper completion of work with coarse sand F.M. not less than 2.00 with Aggregate size (20mm to 40mm) | 605.97 | M3 | 9,100 ₹55,14,327 | 9,800 ₹59,38,506 | 9,000 ₹54,53,730 Lowest | 11,300 ₹68,47,461 | 9,640.67 ₹58,41,956.8 | 11,000 ₹66,65,670 |
| 1.10 | Laying of concrete mixed of grade (M-25) ncluding all cost of materials, labour and T&P etc. as per direction of engineer-in-charge | 1,269.81 | M3 | 11,100 ₹1,40,94,891 | 11,000 ₹1,39,67,910 Lowest | 11,200 ₹1,42,21,872 | 11,179 ₹1,41,95,205.99 | 11,280.15 ₹1,43,23,647.27 | 11,179 ₹1,41,95,205.99 |
Tender Value
₹3.5 Cr
EMD Value
₹7.0 L
Closing Date
19 May 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office Superintending Engineer 14th Circle Irrigation Work Azamgarh
3 pcs. Box Culvert
2026_UPIDC_1147526_1
01/S.E./2026-27
Open Tender
Civil Works
Item Rate
180 days
Sultanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,900
₹7.0 L
Yes
Azamgarh
23 Oct 2026
13 May 2026
19 May 2026
13 May 2026
19 May 2026
13 May 2026
14 May 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of brick work including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge | 116.46 | M3 | - | - |
| 1.02 | Dismantling of CC (1:4:8) including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge | 33.14 | M3 | - | - |
| 1.03 | Dismantling of RCC including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge | 61.91 | M3 | - | - |
| 1.04 | Earth work in making Road Diversion for V.R.B. Construction including all lead , lift, labour and T&P etc.as per direction of engineer in charge | 1,620 | M3 | - | - |
| 1.05 | Earth work in excavation for foundation including back filling with all lead & lift labour and T&P etc for completion of work as direction of Engineer-in-Charge | 5,291.94 | M3 | - | - |
| 1.06 | Centering & shutering for C.C. block including cost of all material , labour and T&P etc | 123.6 | M2 | - | - |
| 1.07 | Centering & shutering for R.C.C. works including all cost of materials, labour and T&P etc. required for proper completion of the work.as per direction of engineer in charge | 888.66 | M3 | - | - |
| 1.08 | Cutting, bending, binding of reinforcement(Fe500) and placing in proper position including all cost of material with steel, labour and T&P etc. required for porper completion of the work as per drawing in direction of engineer-in-charge | 104.58 | MT | - | - |
| 1.09 | Laying of cement concrete ( 1:2:4) with all material, labour, T&P etc. required for proper completion of work with coarse sand F.M. not less than 2.00 with Aggregate size (20mm to 40mm) | 605.97 | M3 | - | - |
| 1.1 | Laying of concrete mixed of grade (M-25) ncluding all cost of materials, labour and T&P etc. as per direction of engineer-in-charge | 1,269.81 | M3 | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.15 MB
Biddocument1.pdf
Tender Documents • 1.93 MB
BOQ_2147327.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .