Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | -26.81% | ₹1.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.5 L+₹2,631.16 (1.79%)Admitted-Fee/PreQual/Technical/Finance | -25.50% | ₹1.5 L+₹2,631.16 (1.79%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.5 L+₹5,844.79 (3.98%)Admitted-Fee/PreQual/Technical/Finance | -23.90% | ₹1.5 L+₹5,844.79 (3.98%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.6 L+₹13,678.01 (9.30%)Admitted-Fee/PreQual/Technical/Finance R O VILLAGE KOTLA TEHSIL KATRA DISTRICT REASI | -20.00% | ₹1.6 L+₹13,678.01 (9.30%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.7 L+₹19,502.72 (13.3%)Admitted-Fee/PreQual/Technical/Finance | -17.10% | ₹1.7 L+₹19,502.72 (13.3%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
7 Sept 2026, 6:00 pmClosed
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_322970_4
e-NIT No. 153 REW UDHAMPUR of 2026-27 Dated 31-08-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹4,000
9 Sept 2026
1 Sept 2026
8 Sept 2026
1 Sept 2026
7 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add cost of CIB | 1 | No. | 2,000 | ₹2,000 |
| 2 | Earth work in trench excavation (ordinary rock) | 4.4 | cum | 924.8 | ₹4,069.12 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 11.74 | cum | 4,826.5 | ₹56,663.11 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 6.63 | cum | 5,733.6 | ₹38,013.77 |
| 5 | Centering and shuttering including stru tting, propping etc. and removal of form work for: Foundations | 27.18 | sqm | 286.35 | ₹7,782.99 |
| 6 | providing and laying 50 mm thick c.conc flooring in 1:2:4 mix and curing complte | 126.86 | Cum | 562.15 | ₹71,314.35 |
| 7 | Carriage of Sand | 11.05 | cum | 941.81 | ₹10,407 |
| 8 | Carriage of Aggregates | 22.1 | cum | 479.71 | ₹10,601.59 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_1085686.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .