| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC PROPER |
| 2 | L2₹1.7 Cr+₹4.2 L (2.50%)Rejected-AOC | ₹1.7 Cr+₹4.2 L (2.50%) | L2 | Rejected-AOC NOT QUALIFIED FOR AOC |
| 3 | L3₹1.8 Cr+₹14.5 L (8.76%)Rejected-AOC | ₹1.8 Cr+₹14.5 L (8.76%) | L3 | Rejected-AOC NOT QUALIFIED FOR AOC |
| 4 | L4₹1.8 Cr+₹15.6 L (9.38%)Rejected-AOC | ₹1.8 Cr+₹15.6 L (9.38%) | L4 | Rejected-AOC NOT QUALIFIED FOR AOC |
| 5 | L5₹1.8 Cr+₹15.6 L (9.38%)Rejected-AOC | ₹1.8 Cr+₹15.6 L (9.38%) | L5 | Rejected-AOC NOT QUALIFIED FOR AOC |
Tender Value
₹2.1 Cr
EMD Value
₹4.1 L
Closing Date
7 Mar 2020, 2:00 pmClosed
Addl. Chief Engineer, UAZ, W.R. Deptt., Dibrugarh
Addl. Chief Engineer, UAZ, W.R. Deptt., Dibrugarh
Immediate Measures to recoup flood damaged of country side slope of B/Dyke from Ch. 19th Km. to 24th Km. (Kandulimari to Chataikur) area in the form of formation of back berm under SDRF for 2019-20 (Package 1)
2020_DoWR_16815_1
MAJU/SDRF/KNDL/2019-20/1
Open Tender
Civil Works
Works
60 days
Majuli
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
The Executive Engineer,Majuli W.R.Division
₹4.1 L
Yes
18 May 2020
26 Feb 2020
10 Mar 2020
26 Feb 2020
7 Mar 2020
2 Mar 2020
Amount
Medium Jungles: Clearing medium jungles and trees upto 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed. ( When 30% to 60 % of the area is covered by shrubs,trees etc)
Uprooting bamboo clumps where bamboo already removed including removing stumps to a distance as directed.
Earth work in embankment by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 22cm. thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 2.5cm cube, dressing as per design section including payment of forest royalty if any, etc. complete as directed. (10% deduction will be made from the section measured quantities of the completed and compacted on account of shrinkage)g properly curing for 28days and supply at specified work site complete as directed. For initial lead beyond ½ Km and up to 4.00 Km and for all lifts
Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pagging with Jati bamboo split, watering till the grass grows for a lead up to 90m and all lifts.
UPEN KUMAR BORTHAKUR
Sri Jyoti Prakash Borah
BABUL GOHAIN
pulin borgohain
Sri Hemanta Phukan
Utpal Gogoi
MOHAN CH DAS
DIBYA SARMAH MANTU KUMAR BHUYAN JV
NAGENDRA BAGIRI
NANDALAL PD. GUPTA
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .