Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.3 L+₹726.34 (0.55%)Admitted-Finance 140 NEAR DAKBANGLO DHARAM GOOL RAMBAN UDHAMPUR J K | RAMBAN | JAMMU AND KASHMIR | 182144 | L2 | Admitted-Finance | ||
| 3 | L3₹1.3 L+₹1,386.66 (1.05%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-DOCUMENTS OF ANOTHER WORK IS UPOLOADED BY THE BIDDER, HENCE NOT ADMITTED. |
Tender Value
₹1.3 L
EMD Value
₹2,640
Closing Date
8 Aug 2026, 4:00 pmClosed
Er. Fayaz Ahmed Sheikh
Executive Engineer REW Ramban
As per NIT
2026_RDPR_317583_51
eNIT21 of REW Ramban Block Gundi Dharam (PRI/DDC/ABDP/BDC) 2026-27
Open Tender
Civil Works
Percentage
30 days
Ramban
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer REW Ramban
₹2,640
21 Aug 2026
24 Jul 2026
10 Aug 2026
24 Jul 2026
8 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soils. | - | Cum | 592.9 | - |
| 2 | Providing/Laying in position cement concrete of specified grade in 1:5:10 mix (1cement:5sand:10stone agg) with 40mm nominal size aggregates including curing | 1 | Cum | 4,828.5 | ₹4,823.67 |
| 3 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard jointed with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing cleaning and curing complete on 20mm thick bed of cement mortar 1:4 (cement:sand) ordinary cement without any pigment | - | Sqm | 903.85 | - |
| 4 | Providing/Laying in position cement concrete of specified grade in 1:2:4 mix (1cement:2sand:4stone agg) with 20mm nominal size aggregates including curing | 1 | Cum | 6,591.25 | ₹6,584.66 |
| 5 | Providing/Laying in position cement concrete of specified grade in 1:3:6 mix (1cement:3sand:6stone agg) with 20mm nominal size aggregates including curing | - | Cum | 5,733.5 | - |
| 6 | Dry stone pitching (any thickness) including cost of stones | - | Cum | 855 | - |
| 7 | Providing and laying in position cement Reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering in foundation and plinth with:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 7,788.4 | ₹7,780.61 |
| 8 | Steel reinforcement for RCC work including cutting, bending, binding and placeing in position all complete. | - | Kgs | 115 | - |
| 9 | Making Plinth protection 50mm thick of cement concrete 1:3:6 (1cement:3Sand:6graded stone aggregates) with 20mm nominal size aggregates over 75mm thick boulders along with all compaction and rammering complete | - | Sqm | 552.8 | - |
| 0.9 | Centering and shuttering including strutting propping etc in foundation and footing complete | - | Sqm | 286.35 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.54 MB
BOQ_1041712.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .