Tender Value
₹43.9 L
EMD Value
₹87,820
Closing Date
25 Aug 2026, 11:15 amDue tomorrow
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other alleid works.
2026_DOA_173502_1
DSWC/SAN/2026-27/17
Open Tender
Pipe Laying Works
Percentage
180 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹1,500
₹87,820
13 Aug 2026
13 Aug 2026
25 Aug 2026
13 Aug 2026
25 Aug 2026
13 Aug 2026
FINANCIAL BID NO.: DSWC/SAN/2026-2027/17
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 700 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Jakehpal Dharamgarh 23185/R, Tehsil-Sunam and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 10465.45 /Cum 93.78 Ninety Three rupees and Seventy Eight paise
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 5005 /Mtrs 87 Eighty Seven Rupees
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2002 /Joints 386.225 Three Hundred Eighty Seven Rupees and Seventy three Paise
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (700mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 5461.344 Five Thousand Four Hundred Sixty One Rupees and Thirty Four Paise
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (700 mm) 40 /Cut hole 172 One Hundred Seventy Two Rupees
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 9 /Cut hole 41 Fourty One Rupess
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (700mm) 40 /Riser & Valve 1117.64 One Thousand One Hundred Seventeen Rupees and Sixty Four Paise
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 9 /Air pipe 286.91 Two Hundred Eighty Six Rupees and Ninty One Paise
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Ninty Three Rupees and Seventy Eight Paise
B.B.C 1:8:16 0.6 cum 3864.08 Three Hundred Eight Hundred Sixty Four Rupees and Eight Paise
Plain Cement Concrete 1:2:4 0.14 cum 5087.17 Five Thousand Eighty Seven Rupees and Seventeen Paise
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5041.67 Five Thousand Fourty One Rupees and Sixty Seven Paise
12.5 mm thick cement plaster work 1:4 15.32 cum 201.77 Two Hundred One Rupee and Seventy Seven Paise
RCC Slab 1:2:4 0.21 cum 8185.19 EightThousand One Hundred Eighty Five Rupees and Ninteen Paise
Foot rest (Item No. 29.37) 6 No 100 One Hundred Rupee
Total Cost for ONE Haudi
Total Cost for 4 Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Four Thousand rupees
Sign Board (5' X 3') 0 each 4000 Four Thousand rupees
Fixing of gate valve (700 mm) 10 each 3209.817 Two thousand nine hundred Seventeen Rupees and eighty two Paise
Nimar for jointing the pipe 791.5908 Per kg 60 Sixty rupees
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 1488.192 per tonnes 209.86
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 16792
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 500 mm Dia RCC Pipes, fixing of AVP, NP3 Pipes, Risers, Construction of Haudies at Village - Chhahar 11200/TL(Ext2) , Tehsil and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1128 /Cum 93.78 Ninety Three rupees and Seventy Eight paise
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 640 /Mtrs 71 Seventy One Rupees
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 256 /Joints 297.63 Two Hundred Ninety-Eight and Sixty-Three Paise
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (500mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 3776.8 Three Thousand Seven Hundred Seventy-Six Rupees and Eighty Paise
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (500 mm) 5 /Cut hole 127 One Hundred Twenty Seven
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 41 Fourty One Rupess
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (500mm) 5 /Riser & Valve 891.07 Eight Hundred Ninety-One Rupees and Seven Paise
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 2 /Air pipe 286.39 Two Hundred Eighty-Six Rupees and Thirty-Nine Paise
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Ninety Three rupees and Seventy Eight paise
B.B.C 1:8:16 0.6 cum 3868.8 Three Thousand Eight Hundred Sixty-Eight rupees and eighty paise
Plain Cement Concrete 1:2:4 0.14 cum 5099.64
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5043.97 Five Thousand Fourty Three Rupees and Ninty Seven Paise
12.5 mm thick cement plaster work 1:4 15.32 cum 202.09 Two Hundred Two Rupees and Nine Paise
RCC Slab 1:2:4 0.21 cum 8196.55 Eight Thousand One Hundred Ninty-Six rupees and Fifty Fivepaise
Foot rest (Item No. 29.37) 6 No 100
Total Cost for ONE Haudi
Total Cost for 0 Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000
Sign Board (5' X 3') 0 each 4000
Fixing of gate valve (500 mm) 1 each 2566.44 Two Thousand Two Hundred Seventy Four Rupees and Foury Four Paise
Nimar for jointing the pipe (500mm) 54.067 Per kg 60 Sixty rupees
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 98.938 per tonnes 209.86 Two Hundred Nine rupees and Eighty Six paise
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP, fixing of Risers,Alfa-Alfa Valve and gate valve,Fixing of Pump Stands etc. at Village - Nilowal 44020/R Tehsil-Sunam and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 5825.4 /Cum 93.78 Ninety Three rupees and Seventy Eight paise
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 5110 /Mtrs 84 EightyFour Rupees
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2044 /Joints 116.71 One hundred Sixteen Rupees and Seventy Six Paise
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 50 /Cut hole 75 seventy Five Rupees
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 15 /Cut hole 41 Fouty One Rupees
Fixing of Risers & Alfa valves with C.C 1:2:4 50 /Riser & Valve 485.31 Four Hundred Eighty Five Rupees and Thirty One Paise
Fixing of Air vent Pipes with C.C 1:2:4 15 /Air pipe 286.28 Two hundred Eighty Rupees and Twenty Eight Paise
Fixing of S & S Pipe (Pump Stand/Haudi)
Exavation (2m X2m X2m) 8 cum 93.78 Ninety Three rupees and Seventy Eight paise
B.B.C 1:8:16 and material 0.6 cum Three thousand seven Hundred eighty one Rupees and sevety seven Paise
Fixing of the double pump stand with labour 1 No Three Thousand Five Hundred seventy two rupees and thirteen paise
Total Cost for ONE Pump Stand
Total Cost for 8 Pump Stand
Providing and Fixing of jaal 1 each 4000 Four Thousand rupees
Sign Board (5' X 3') 1 each 4000 Four Thousand rupees
Fixing of gate valve (300 mm) 11 each 1450.22 One thousand seven hundred thirty three rupee and seventy six paise
Nimar for jointing the pipe (300mm) 160.25 Per kg 60 Sixty rupees
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 283.453 per tonnes 160.3 One hundred Seventy two rupees and ninty four paise
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency
GRAND TOTAL (A+B+C)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
NITUGPL262717.pdf
Tender Documents • 0.52 MB
DNITUGPL262717.pdf
Tender Documents • 1.18 MB
FBUGPL262717.xls
Additional Documents • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].