| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC 33 3 2 TANGRA ROAD C AL 15 KOLKATA WEST BENGAL | KOLKATA | WEST BENGAL | 700015 | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.1 L+₹9,928.19 (2.00%)Rejected-Finance 21 KBM CHAKDAH P O P S CHAKDAH DIST NADIA PIN 741222 | CHAKDAH | NADIA | WEST BENGAL | 741222 | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.2 L+₹24,671.56 (4.97%)Rejected-Finance 3 1 120 ANANDA PALIT ROAD ADJACENT AREA IN WARD NO 55 | KOLKATA | WEST BENGAL | 700001 | L3 | Rejected-Finance L3 |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
10 Feb 2026, 10:30 amClosed
EEC, BR-VII
9/1A, AJC BOSE ROAD, KOL-17
REPAIRING OF ROAD BY PROVIDING HOT MIX AT KUSTIA ROAD, BRIGHT STREET, TILJALA ROAD AND ITS SURROUNDINGS AREA IN W/65
2026_KMC_997248_5
KMC/EEC/VII/25-26/1
Open Tender
CIVIL WORKS
Percentage
60 days
BOROUGH VII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
13 Oct 2026
2 Feb 2026
12 Feb 2026
2 Feb 2026
10 Feb 2026
2 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil | 31.29 | M3 | 79.9 | ₹2,500.31 |
| 2 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018) | 164.7 | SQM | 361 | ₹59,456.7 |
| 3 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) For Construction of Sub Base by consolidating Brick Bats / Laterite (90 mm to 45 mm) (For compacted thickness 100mm) | 164.7 | SQM | 194.49 | ₹32,032.5 |
| 4 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.) | 167.2 | SQM | 11.07 | ₹1,850.9 |
| 5 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface. (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.) | 6,133.8 | SQM | 10.18 | ₹62,442.08 |
| 6 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Day Time | 6,298.5 | SQM | 41 | ₹2,58,238.5 |
| 7 | Sub Total | - | - | - | - |
| 8 | GST 18% | 1 | Nos | - | - |
| 9 | CESS 1% | 1 | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
TF6545.pdf
Tender Documents • 0.55 MB
BOQ_2441167.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .