Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹15,200
Closing Date
1 Apr 2021, 6:00 pmClosed
UNIT HEAD
RIICO LTD. ALWAR
Cleaning of drains at MIA Alwar
2021_RIICO_217570_1
34/2020-21
Open Tender
Civil Works
Item Rate
240 days
ALWAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
RIICO LTD.
₹15,200
Yes
8 Apr 2021
22 Mar 2021
6 Apr 2021
22 Mar 2021
1 Apr 2021
22 Mar 2021
22 Mar 2021 - 1 Apr 2021
Amount
Labour charges for cleaning of drains on mentioned roads of IA The scope of the above said works consists of as below A cleaning desilting of sludge from drains manually mechanically as per site condition on the satisfaction of engineer in charge B Transportation of excavated sludge silt after proper drying in a specified purpose vehicle duly covered with PVC polythene sheet so as to avoid foul spreading on the way from the site to the place as directed by Engineer in charge C The excavated sludge sill shall be transported at an earliest after getting it dried for making it transportable If the same is not disposed transported within three days after drying an amount of Rs 5000 per km of drain shall be levied and same be deducted from the running bills D If any type of covering has been done on the drain same shall be removed by the contractor at his own cost and same shall be refixed as original after de silting of drains by the contractor at his own cost brought to the notice of engineer in charge E If at any instance it is found by the contractor that polythene begs waste material from the plant is mixed thrown directly in the drains effecting the easy flow of the drain then same shall be incharge immediately so that action may be initiated against the party as per RIICO rules F If during de siltling sludge removal any drain is damaged by the contractor due to negligence the shall be repaired by the contractor If not attended by the contractor within ten days same shall be got repaired by corporation at risk and cost of the contractor within any notice G Being an urgent nature of work if the same is not executed by the contractor to the satisfaction of engineer in charge or corporation the work shall be rescined immediately without any notice and same shall be got executed at his risk and cost H The contractor shall ensure that all the inlets of the drain like weep holes inlets at top are properly cleaned so as not to interrupt the flow of water from the road to inside of drain The work shall be executed on important drains situated on roads as decided assigned by engineer in charge as below A Sizes of the drain to be cleaned are as follows for the drain having top width upto 600mm
Labour charges for cleaning of drains on mentioned roads of IA The scope of the above said works consists of as below A cleaning desilting of sludge from drains manually mechanically as per site condition on the satisfaction of engineer in charge B Transportation of excavated sludge silt after proper drying in a specified purpose vehicle duly covered with PVC polythene sheet so as to avoid foul spreading on the way from the site to the place as directed by Engineer in charge C The excavated sludge sill shall be transported at an earliest after getting it dried for making it transportable If the same is not disposed transported within three days after drying an amount of Rs 5000 per km of drain shall be levied and same be deducted from the running bills D If any type of covering has been done on the drain same shall be removed by the contractor at his own cost and same shall be refixed as original after de silting of drains by the contractor at his own cost brought to the notice of engineer in charge E If at any instance it is found by the contractor that polythene begs waste material from the plant is mixed thrown directly in the drains effecting the easy flow of the drain then same shall be incharge immediately so that action may be initiated against the party as per RIICO rules F If during de siltling sludge removal any drain is damaged by the contractor due to negligence the shall be repaired by the contractor If not attended by the contractor within ten days same shall be got repaired by corporation at risk and cost of the contractor within any notice G Being an urgent nature of work if the same is not executed by the contractor to the satisfaction of engineer in charge or corporation the work shall be rescined immediately without any notice and same shall be got executed at his risk and cost H The contractor shall ensure that all the inlets of the drain like weep holes inlets at top are properly cleaned so as not to interrupt the flow of water from the road to inside of drain The work shall be executed on important drains situated on roads as decided assigned by engineer in charge as below A Sizes of the drain to be cleaned are as follows for the drain having top width upto 6100mm to 1000mm
Labour charges for cleaning of drains on mentioned roads of IA The scope of the above said works consists of as below A cleaning desilting of sludge from drains manually mechanically as per site condition on the satisfaction of engineer in charge B Transportation of excavated sludge silt after proper drying in a specified purpose vehicle duly covered with PVC polythene sheet so as to avoid foul spreading on the way from the site to the place as directed by Engineer in charge C The excavated sludge sill shall be transported at an earliest after getting it dried for making it transportable If the same is not disposed transported within three days after drying an amount of Rs 5000 per km of drain shall be levied and same be deducted from the running bills D If any type of covering has been done on the drain same shall be removed by the contractor at his own cost and same shall be refixed as original after de silting of drains by the contractor at his own cost brought to the notice of engineer in charge E If at any instance it is found by the contractor that polythene begs waste material from the plant is mixed thrown directly in the drains effecting the easy flow of the drain then same shall be incharge immediately so that action may be initiated against the party as per RIICO rules F If during de siltling sludge removal any drain is damaged by the contractor due to negligence the shall be repaired by the contractor If not attended by the contractor within ten days same shall be got repaired by corporation at risk and cost of the contractor within any notice G Being an urgent nature of work if the same is not executed by the contractor to the satisfaction of engineer in charge or corporation the work shall be rescined immediately without any notice and same shall be got executed at his risk and cost H The contractor shall ensure that all the inlets of the drain like weep holes inlets at top are properly cleaned so as not to interrupt the flow of water from the road to inside of drain The work shall be executed on important drains situated on roads as decided assigned by engineer in charge as below A Sizes of the drain to be cleaned are as follows for the drain having top width upto 1000mm to 1500mm
Labour charges for cleaning of drains on mentioned roads of IA The scope of the above said works consists of as below A cleaning desilting of sludge from drains manually mechanically as per site condition on the satisfaction of engineer in charge B Transportation of excavated sludge silt after proper drying in a specified purpose vehicle duly covered with PVC polythene sheet so as to avoid foul spreading on the way from the site to the place as directed by Engineer in charge C The excavated sludge sill shall be transported at an earliest after getting it dried for making it transportable If the same is not disposed transported within three days after drying an amount of Rs 5000 per km of drain shall be levied and same be deducted from the running bills D If any type of covering has been done on the drain same shall be removed by the contractor at his own cost and same shall be refixed as original after de silting of drains by the contractor at his own cost brought to the notice of engineer in charge E If at any instance it is found by the contractor that polythene begs waste material from the plant is mixed thrown directly in the drains effecting the easy flow of the drain then same shall be incharge immediately so that action may be initiated against the party as per RIICO rules F If during de siltling sludge removal any drain is damaged by the contractor due to negligence the shall be repaired by the contractor If not attended by the contractor within ten days same shall be got repaired by corporation at risk and cost of the contractor within any notice G Being an urgent nature of work if the same is not executed by the contractor to the satisfaction of engineer in charge or corporation the work shall be rescined immediately without any notice and same shall be got executed at his risk and cost H The contractor shall ensure that all the inlets of the drain like weep holes inlets at top are properly cleaned so as not to interrupt the flow of water from the road to inside of drain The work shall be executed on important drains situated on roads as decided assigned by engineer in charge as below A Sizes of the drain to be cleaned are as follows for the drain having top width from 1500mm and above
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .