Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance 134 1 SAKTHI THEATER STREET NEHRU NAGAR KARUMALAIKOODAL METTUR DAM 02 | METTUR DAM | TAMIL NADU | ₹3.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.7 LAccepted-Finance 30 OPP ALOK PRESS GHATI BADBHUNJA CHAMELI ROAD BHOPAL BHOPAL MADHYA PRADESH 462001 UDYAM MP 10 0044621 | BHOPAL | MADHYA PRADESH | 462001 | ₹3.7 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | Natesan Engineering Contractor L1 | R K ELECTRICALS L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for complete cleaning of the oil sedimentation on the H.V.R. Transformer outer body, complete cleaning of the knife switch chamber, marshaling boxes at ESP rooftop of Unit I, II & IV (ESP I:24, ESP II:24, ESP IV:36 = Total :84 Nos.) | 84 | Nos | 862 ₹72,408 | 914 ₹76,776 |
| 2.00 | Charges for complete cleaning of the support insulator and its chambers at ESP rooftop of Unit I,II,III & IV (ESP I:96, ESP II:96, ESP III:96, ESP IV:144 = Total :432 Nos.) | 432 | Nos | 212 ₹91,584 | 225 ₹97,200 |
| 3.00 | Charges for complete cleaning of the collecting and Emitting electrode rapping motors in ESP Unit I,II,III & IV (ESP I:36, ESP II:36, ESP III:36, ESP IV:60 = Total :168 Nos.) | 168 | Nos | 72 ₹12,096 | 76 ₹12,768 |
| 4.00 | Charges for releasing of defective insulators from the chamber and re-fixing the new insulator at ESP roof top of Unit I,II,III & IV (if necessary) | 6 | Nos | 1,790 ₹10,740 | 1,897 ₹11,382 |
| 5.00 | Charges for cleaning with emery sheet on rusted area and soap water washing the external body of HVR Transformer, support insulator chamber outer side at ESP unit III, two coats of painting with DA Grey colour paint. I).Painting of 24 Nos. transformers. (Surface area/transformer=22.47 m2 ) | 539.28 | Sqmtr | 158 ₹85,206.24 | 167 ₹90,059.76 |
| 6.00 | Charges for cleaning with emery sheet on rusted area and soap water washing the external body of HVR Transformer, support insulator chamber outer side at ESP unit III, two coats of painting with DA Grey colour paint. II).Painting 96 Nos. of support insulator chamber outer side.(Surface area/chamber=1.725 m2 ) | 165.6 | Sqmtr | 160 ₹26,496 | 170 ₹28,152 |
| 7.00 | DA Grey paint (Asian paint)( For 24 Nos. transformers and 96 Nos. of support insulator chamber outer side ) | 133 | Litrs | 310 ₹41,230 | 328 ₹43,624 |
| 8.00 | Thinner | 25 | Litrs | 93 ₹2,325 | 99 ₹2,475 |
| 9.00 | Material cost for CRC | 5 | Nos | 400 ₹2,000 | 425 ₹2,125 |
| 10.00 | Cost of Consumables (Lumsum) | 1 | Nos | 3,195 ₹3,195 | 3,387 ₹3,387 |
Tender Value
Refer Docs
EMD Value
₹3,200
Closing Date
20 Feb 2026, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EM-II SD-III- Cleaning of HVR Transformers, support insulators and rapping motors at ESP roof top of Unit-I to IV and scrapping painting of Unit III HVR transformers during the respective Unit AOH COH for the year 2026 2027
2026_EB_652240_1
CE-MTPSI-SE-ES-EM2-OT131-25-26
Open Tender
Electrical Works
31 days
MTPS-I/METTURDAM
As per Tender specification
4 documents required · 4 mandatory
₹0
₹3,200
Yes
11 Mar 2026
6 Feb 2026
21 Feb 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
Charges for complete cleaning of the oil sedimentation on the H.V.R. Transformer outer body, complete cleaning of the knife switch chamber, marshaling boxes at ESP rooftop of Unit I, II & IV (ESP I:24, ESP II:24, ESP IV:36 = Total :84 Nos.)
Charges for complete cleaning of the support insulator and its chambers at ESP rooftop of Unit I,II,III & IV (ESP I:96, ESP II:96, ESP III:96, ESP IV:144 = Total :432 Nos.)
Charges for complete cleaning of the collecting and Emitting electrode rapping motors in ESP Unit I,II,III & IV (ESP I:36, ESP II:36, ESP III:36, ESP IV:60 = Total :168 Nos.)
Charges for releasing of defective insulators from the chamber and re-fixing the new insulator at ESP roof top of Unit I,II,III & IV (if necessary)
Charges for cleaning with emery sheet on rusted area and soap water washing the external body of HVR Transformer, support insulator chamber outer side at ESP unit III, two coats of painting with DA Grey colour paint. I).Painting of 24 Nos. transformers. (Surface area/transformer=22.47 m2 )
Charges for cleaning with emery sheet on rusted area and soap water washing the external body of HVR Transformer, support insulator chamber outer side at ESP unit III, two coats of painting with DA Grey colour paint. II).Painting 96 Nos. of support insulator chamber outer side.(Surface area/chamber=1.725 m2 )
DA Grey paint (Asian paint)( For 24 Nos. transformers and 96 Nos. of support insulator chamber outer side )
Thinner
Material cost for CRC
Cost of Consumables (Lumsum)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_782105.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid