Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | -20.00% | ₹2.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.2 L+₹40,839.85 (14.6%)Admitted-Fee/PreQual/Technical/Finance | -8.30% | ₹3.2 L+₹40,839.85 (14.6%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.5 L+₹69,776.80 (25.0%)Admitted-Fee/PreQual/Technical/Finance | -0.01% | ₹3.5 L+₹69,776.80 (25.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-NIT and SNo not mentioned on TR and CDR |
Tender Value
₹3.5 L
EMD Value
₹6,980
Closing Date
10 Sept 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
FINDC2627102992 (INFRASTRUCTURE DEVELOPMENT OF PARK AT GOVT.HIGH SCHOOL JAWAHARPORA ARIPAL)
2026_RDPR_322800_16
e- NIT No. 110/2026-27 Dated 29-08-2026
Open Tender
Civil Works
Percentage
45 days
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer REW Pulwama
₹6,980
11 Sept 2026
31 Aug 2026
11 Sept 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes,cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits, and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of the same as directed in all kinds of soils | 41.57 | cum | - | - |
| 2 | Provinding and laying of dry stone soling dully hand packed including watering, dressing, ramming with all carriages, loading, unloading and stacking etc complete | 10.98 | cum | - | - |
| 3 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:3:6 mix (1cement: 3coarse sand: 6 graded stone aggregate with 20mm nominal size) | 21.31 | cum | - | - |
| 4 | Cost of plum | 2.03 | cum | - | - |
| 5 | Brick work with common burnt clay (non-modular) bricksof class designation 7.5 in foundation and plinth ic curing in cement mortar 1:6 mix | 1.7 | cum | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for walls (any thickness) including slabs, suspended floors etc | 50.03 | sqm | - | - |
| 7 | Extra brick work | 1.7 | cum | - | - |
| 8 | Brick work in plain arches in superstructure above plinth level and upto floor V level
including centering, shuttering and curing complete for span upto 6 meters with common
burnt clay (non-modular) bricks of class designation 7.5 in cement mortar 1:3 ( 1 cement
: 3 coarse sand ) | 2.32 | cum | - | - |
| 9 | Providing and laying matt finished vitrified tile of specified size having
water absorption less than 0.5% and conforming to IS: 15622 of approved
make in all colours and shades in outdoor floors such as footpath, court
yard multi models etc., laid on 20mm thick base of cement mortar 1:4
(1cement: 4 coarse sand) in all shapes & patterns including grouting the
joints with white cement mixed with matching pigments etc. complete as
direction of Engineer-in-Charge.
16.91.2 300x300x9.8 mm | 54.07 | sqm | 1 | ₹54.02 |
| 10 | providing and fixing of conduts, wiring, switches and other related accessoreis with papapet wall for ligting arrnagement including outdoor lamps for gate and parapett wall complete job | 1 | LS | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_1084206.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .