Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-2₹936.2 CrAccepted-AOC 6TH FLOOR CHANAKYA OFF ASHRAM ROAD AHMEDABAD AHMEDABAD GUJARAT 380009 | AHMADABAD | GUJARAT | 380009 | ₹936.2 Cr | L-2 | Accepted-AOC Found eligible for placing LOA |
| 2 | L-1₹897.1 CrRejected-AOC | ₹897.1 Cr | L-1 | Rejected-AOC Not Found eligible for placing LOA |
| 3 | L-3₹949.0 CrRejected-AOC PLOT 104 BHRAMHAPUTRA INDUSTRIAL PARK GOURIPUR AMINGAON SILA INDURIGHOPA KAMRUP ASSAM 781031 | KAMRUP | ASSAM | 781031 | ₹949.0 Cr | L-3 | Rejected-AOC Not Found eligible for placing LOA |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically and Financially Disqualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Financially Disqualified |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
17 Nov 2022, 3:00 pmClosed
CGM (Procurement)
Nishtha Parishar Bhopal
Appointment of Advanced Metering Infrastructure Service Provider (AMISP) for Smart Metering on Design-Build Finance-Own-Operate-Transfer (DBFOOT) basis on Hybrid OPEX model
2022_MKVVC_214023_1
MD/MK/04/798
Open Tender
Miscellaneous Works
3650 days
Bhopal
As per TS
3 documents required · 3 mandatory
₹23,600
₹1 L
Nishtha Parishar Bhopal
9 Jan 2024
29 Jul 2022
18 Nov 2022
29 Jul 2022
17 Nov 2022
30 Aug 2022
17 Aug 2022
Amount
Meters (each with related hardware, software and equipment)
DLMS Compliant Single-Phase LT static whole current smart energy meter Category D-1 with meter box and sealing arrangement(For Consumer Metering) as per technical specifications Annexure-9.A of Contract Agreement document)
DLMS Compliant Category-D3, LT CT operated Three-Phase 4 wire smart energy meter with meter Box & CTs (For Consumer Metering)- As per technical specifications Annexure-9.B.1 & Annexure-9.B.4 of Contract Agreement document)
DLMS Compliant Category D-2, LT three Phase Whole Current Static Smart Energy Meter (for consumer metering)- As per technical specifications Annexure-9.B.2 & 9.B.3 of Contract Agreement document)
DLMS Compliant Category-D3, LT CT operated Three-Phase 4 wire smart energy meter with meter Box & CTs (For Distribution Transformer Metering)- As per technical specifications Annexure-9.B.1 & Annexure-9.B.4 of Contract Agreement document)
Genus Power Infrastructures Limited
Apraava Energy Private Limited
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid