| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.1 LAdmitted-Finance | -2.00% | ₹5.1 L | L1 | Admitted-Finance |
| 2 | L2₹5.1 LAdmitted-Finance | -1.02% | ₹5.1 L | L2 | Admitted-Finance |
Tender Value
₹5.2 L
EMD Value
₹10,350
Closing Date
20 Jan 2026, 5:00 pmClosed
EE, Raj Dam Env. L.A. Division,Rajghat
EE, Raj Dam Env. L.A. Division,Rajghat
Construction of 02 Nos Main Gate of Left flank Rajghat Dam Rajghat
2026_BRB_892567_1
23/2025-26/EE/Env and L.A. Division/Rajghat
Open Tender
Miscellaneous Works
90 days
RAJGHAT DAM LALITPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
EE ENV AND LA RAJGHAT
₹10,350
25 Feb 2026
7 Jan 2026
21 Jan 2026
7 Jan 2026
20 Jan 2026
7 Jan 2026
Item Description
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Mild steel and Medium Tensile steel bars. @1.5% of quantity
Centering and shuttering including strutting, propping etc. and removal of form work for :Columns, piers, abutments, pillars, posts and struts (as per CPWD SOR Item no 4.3.3)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete Providing and fixing bolts including nuts and washers complete.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited lay
Providing and laying gang saw cut 18 mm thick, mirror polished premoulded and pre polished machine cut granite stone of required sizeand shape of approved shade, colour and texture in footpath, flooringcut granite stone of required size and shape of approved shade,colour and texture in footpath, flooring in road side plazas and similarlocations, laid over 20mm thick base of cement mortar 1:4 (1cement: 4 coarse sand) including grouting the joints with white cementmixed with matching pigment, epoxy touch ups etc. complete asper direction of Engineer-in-Charge.
Light Lamp as per market Rate
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
LEFTGATE_TENDERDOC.pdf
Tender Documents • 4.01 MB
BOQ_938164.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid