| 1 | L1₹68,513Accepted-Finance SUGANTHAM BUILDING 24 8 5 PALLIYADI KANYAKUMARI DIST PIN 629 169 | PALLIYADI | KANYAKUMARI | TAMIL NADU | 629169 | ₹68,513 | L1 | Accepted-Finance lowest value |
| Sl No | Description | Qty | Unit | M/s. Bafflin Groups L1 |
|---|---|---|---|---|
| 1.00 | Excavation of pole pit (1.25m * 0.6m * 1.83 m) 9/9.14 mtr length l in Normal ground | 6 | Per pit | 4,500 ₹5,310 Lowest |
| 2.00 | Erection of pole 9 / 9.14 mtr. in Normal ground | 6 | Per pole | 4,800 ₹5,664 Lowest |
| 3.00 | Transporting of 9 mtr pole from road side to pole pit upto 2 KM | 6 | Each pole | 4,800 ₹5,664 Lowest |
| 4.00 | Loading and unloading 9 mtr. PSC pole / Square pole | 6 | Each | 3,600 ₹4,248 Lowest |
| 5.00 | Loading and unloading of Line materials | 1 | MT | 400 ₹472 Lowest |
| 6.00 | Concreting of pole as per Board standards (2 *2*5'). The materials such as sand, jelly etc., have to be supplied by the contractor. Cement supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges., for placing transporting of sand, jelly from box and water curing for 14 days etc., complete. | 3 | Loc. | 9,000 ₹10,620 Lowest |
| 7.00 | Coil earthing per pole & pole earthing | 6 | Each | 900 ₹1,062 Lowest |
| 8.00 | Excavation of stay pit (1 m * 0.5m*1.5m) in Normal Ground | 4 | per pit | 1,400 ₹1,652 Lowest |
| 9.00 | Erection of stay set complete in Normal Ground | 4 | per set | 2,000 ₹2,360 Lowest |
| 10.00 | Fixing of V X arm 4 1/2 ' / 3 1/2 ' | 4 | Each | 1,600 ₹1,888 Lowest |
Tender Value
Refer Docs
Closing Date
5 Aug 2026, 2:00 pmClosed
o/o the EE/D/Ngl
o/o the EE/D/Ngl
Improvement estmate for insertion of 3 Nos. 9 mtr. PSC pole at Nesamoninagar SS I -250 KVA and
2026_EB_687710_1
EE/D/NGL/ET .29/dt.22.07.2026
Open Tender
Electrical Works
Works
90 days
EE/NGL
As per Specified
3 documents required · 3 mandatory
₹0
Yes
6 Aug 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
22 Jul 2026 - 4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of pole pit (1.25m * 0.6m * 1.83 m) 9/9.14 mtr length l in Normal ground | 6 | Per pit | - | - |
| 2 | Erection of pole 9 / 9.14 mtr. in Normal ground | 6 | Per pole | - | - |
| 3 | Transporting of 9 mtr pole from road side to pole pit upto 2 KM | 6 | Each pole | - | - |
| 4 | Loading and unloading 9 mtr. PSC pole / Square pole | 6 | Each | - | - |
| 5 | Loading and unloading of Line materials | 1 | MT | - | - |
| 6 | Concreting of pole as per Board standards (2 *2*5'). The materials such as sand, jelly etc., have to be supplied by the contractor. Cement supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges., for placing transporting of sand, jelly from box and water curing for 14 days etc., complete. | 3 | Loc. | - | - |
| 7 | Coil earthing per pole & pole earthing | 6 | Each | 1 | ₹6 |
| 8 | Excavation of stay pit (1 m * 0.5m*1.5m) in Normal Ground | 4 | per pit | 2 | ₹8 |
| 9 | Erection of stay set complete in Normal Ground | 4 | per set | 3 | ₹12 |
| 10 | Fixing of V X arm 4 1/2 ' / 3 1/2 ' | 4 | Each | 4 | ₹16 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_826573.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].