Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.9 LAccepted-AOC 411 STREET NO 4 PANCHVATI NAGAR BATHINDA 151001 | BATHINDA | PUNJAB | 151001 | ₹34.9 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹37.8 L+₹2.8 L (8.14%)Rejected-AOC ZIRAKPUR PUNJAB | S A S NAGAR | PUNJAB | 140103 | ₹37.8 L+₹2.8 L (8.14%) | L2 | Rejected-AOC Other than Lowest Bidder |
| Sl No | Description | Qty | Unit | SS BUILDERS L2 | M/s Super Trading Corporation L1 |
|---|---|---|---|---|---|
| 1.00 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 500 | SQUARE METRE | 20 ₹10,000 Lowest | 39.6 ₹19,800 |
| 2.00 | Taking down chowkhats or frames n.exc 1.5 sqm each (without taking off shutter from the frame) including cutting holes through brickwall and making good the dismantled portion in cm 1:3 or PCC 1:2:4 and removing from the site including dismantling brick work of hold fasts etc complete all as specified and directed by Engineer-in-Charge. | 20 | EACH | 100 ₹2,000 Lowest | 180 ₹3,600 |
| 3.00 | Taking down chowkhats or frames exc 1.5 sqm each but not.exc 1.5 sqm each (without taking off shutter from the frame) including cutting holes through brickwall and making good the dismantled portion in cm 1:3 or PCC 1:2:4 and removing from the site including dismantling brick work of hold fasts etc complete all as specified and directed by Engineer-in-Charge. | 2 | EACH | 200 ₹400 Lowest | 243 ₹486 |
| 4.00 | Taking down steel tubing and connections of 15 mm bore in pipe with all fittings from walls,ceilings and floors and removal from site complete all as specified and directed by Engineer-in-Charge. | 120 | RUNNING METRE | 28 ₹3,360 | 18 ₹2,160 Lowest |
| 5.00 | Taking down steel tubing and connections of 20 mm bore in pipe with all fittings from walls,ceilings and floors and removal from site complete all as specified and directed by Engineer-in-Charge. | 100 | RUNNING METRE | 30 ₹3,000 | 18 ₹1,800 Lowest |
| 6.00 | Taking down eaves gutters and rainwater pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks, etc., and removal from site complete all as specified and directed by Engineer-in-Charge. | 195 | RUNNING METRE | 30 ₹5,850 | 27 ₹5,265 Lowest |
| 7.00 | Demolition of brick work or stone/boulder masonary built in cement mortar incl all quions arches, pillar or any other descrption etc complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 6.5 | CUBIC METRE | 300 ₹1,950 Lowest | 495 ₹3,217.5 |
| 8.00 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors) beams, slabs, staircases, landing, chajjas and similar suspended work complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 1 | CUBIC METRE | 600 ₹600 Lowest | 810 ₹810 |
| 9.00 | Demolition of Cement concrete unreinforced as in Ground Floor and paving n. exc. 15cm thick (above or below G.L.) complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 15 | CUBIC METRE | 300 ₹4,500 | 270 ₹4,050 Lowest |
| 10.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and omplete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 630 | SQUARE METRE | 30 ₹18,900 Lowest | 39.6 ₹24,948 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
15 Jul 2026, 6:00 pmClosed
GE CHANDIGARH
GE CHANDIGARH N AREA OLD AIRPORT CHOWK CHANDIGARH 160003
GE/CHD/T-34/2026-27 REPAIR TO ROOF TREATMENT AND SUNKEN FLOORING INCL CONNECTED ITEM AT K AREA UNDER GE CHANDIGARH
2026_MES_773077_1
GE/CHD/T-34/2026-27
Open Tender
Civil Works
Item Rate
270 days
ZIRAKHPUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE CHANDIGARH
₹80,000
Yes
17 Sept 2026
18 Jun 2026
17 Jul 2026
18 Jun 2026
15 Jul 2026
3 Jul 2026
19 Jun 2026 - 25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 500 | SQUARE METRE | 100 | ₹50,000 |
| 2 | Taking down chowkhats or frames n.exc 1.5 sqm each (without taking off shutter from the frame) including cutting holes through brickwall and making good the dismantled portion in cm 1:3 or PCC 1:2:4 and removing from the site including dismantling brick work of hold fasts etc complete all as specified and directed by Engineer-in-Charge. | 20 | EACH | 100 | ₹2,000 |
| 3 | Taking down chowkhats or frames exc 1.5 sqm each but not.exc 1.5 sqm each (without taking off shutter from the frame) including cutting holes through brickwall and making good the dismantled portion in cm 1:3 or PCC 1:2:4 and removing from the site including dismantling brick work of hold fasts etc complete all as specified and directed by Engineer-in-Charge. | 2 | EACH | 100 | ₹200 |
| 4 | Taking down steel tubing and connections of 15 mm bore in pipe with all fittings from walls,ceilings and floors and removal from site complete all as specified and directed by Engineer-in-Charge. | 120 | RUNNING METRE | 10 | ₹1,200 |
| 5 | Taking down steel tubing and connections of 20 mm bore in pipe with all fittings from walls,ceilings and floors and removal from site complete all as specified and directed by Engineer-in-Charge. | 100 | RUNNING METRE | 10 | ₹1,000 |
| 6 | Taking down eaves gutters and rainwater pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks, etc., and removal from site complete all as specified and directed by Engineer-in-Charge. | 195 | RUNNING METRE | 10 | ₹1,950 |
| 7 | Demolition of brick work or stone/boulder masonary built in cement mortar incl all quions arches, pillar or any other descrption etc complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 6.5 | CUBIC METRE | 10 | ₹65 |
| 8 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors) beams, slabs, staircases, landing, chajjas and similar suspended work complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 1 | CUBIC METRE | 10 | ₹10 |
| 9 | Demolition of Cement concrete unreinforced as in Ground Floor and paving n. exc. 15cm thick (above or below G.L.) complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 15 | CUBIC METRE | 10 | ₹150 |
| 10 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and omplete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 630 | SQUARE METRE | 10 | ₹6,300 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
TENDER34.pdf
Tender Documents • 2.59 MB
BOQ_865657.xls
BOQ • 5.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .