| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.2 LAccepted-AOC | ₹21.2 L | L1 | Accepted-AOC Loyas Amt |
| 2 | L2₹21.4 LRejected-Finance | ₹21.4 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | VIJAYALAKSHMI RADHAKRISHNAN L2 | Muthukumar J L1 |
|---|---|---|---|---|---|
| 1.00Construction of Community Hall at Puluthikudi AD Street in Thirumangalakudi Panchayat. | |||||
| 2.00 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | 70.84 | Cu.m | 266.42 ₹18,873.19 | 263.75 ₹18,684.05 |
| 3.00 | Supplying and filling in basement with filling excavated earth filling within 5km distance including all charges etc,. | 12.43 | Cum | 588.45 ₹7,314.43 | 582.56 ₹7,241.22 |
| 4.00 | Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications. | 8.38 | Cu.m | 2,518.14 ₹21,102.01 | 2,492.96 ₹20,891 |
| 5.00 | Plain Cement Concrete: 1:4:8 - One part Cement:Four part Sand:Eight part hard broken stone jelly using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick,well rammed,consolidated and curing etc.complete complying with standar specification. | 8 | Cu.m | 6,536.44 ₹52,291.52 | 6,471.07 ₹51,768.56 |
| 6.00 | RCC 1 : 1.5 :3 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 37.45 | Cu.m | 10,472.91 ₹3.9 L | 10,368.18 ₹3.9 L |
| 7.00Brick work in following Cement Mortar 1:5 using best quality Country bricks of size 8"3/4 x 41/4" X2 3/4" for foundation and basement including curing etc., complete complying with standard specification. Including scaffolding curing cost of reinforcement etc. all complete as per specifications and drawings as directed by the Engineer in-charge. | |||||
| 8.00 | Upto Basement | 8.83 | Cu.m | 6,377.6 ₹56,314.21 | 6,313.83 ₹55,751.12 |
| 9.00 | Above Basement | 21.3 | Cu.m | 6,471.4 ₹1.4 L | 6,406.69 ₹1.4 L |
| 10.00Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | |||||
Tender Value
₹21.6 L
EMD Value
₹21,600
Closing Date
16 Oct 2025, 3:00 pmClosed
Block Development Officer(VP)
Caveri Moolai street, Thiruvidaimarudur
constrution of ad street community hall puluthikudi habitation in thirumangalakudi panchayat
2025_RDTN_612690_1
1133/2025/B4 Thirumangalakudi Panchayat
Open Tender
Civil Works - Buildings
180 days
Thirumangalakudi
Please refer tenderdocument
9 documents required · 9 mandatory
₹0
₹21,600
Yes
11 Dec 2025
10 Oct 2025
16 Oct 2025
10 Oct 2025
16 Oct 2025
10 Oct 2025
Amount
Construction of Community Hall at Puluthikudi AD Street in Thirumangalakudi Panchayat.
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
Supplying and filling in basement with filling excavated earth filling within 5km distance including all charges etc,.
Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete: 1:4:8 - One part Cement:Four part Sand:Eight part hard broken stone jelly using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick,well rammed,consolidated and curing etc.complete complying with standar specification.
RCC 1 : 1.5 :3 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Brick work in following Cement Mortar 1:5 using best quality Country bricks of size 8"3/4 x 41/4" X2 3/4" for foundation and basement including curing etc., complete complying with standard specification. Including scaffolding curing cost of reinforcement etc. all complete as per specifications and drawings as directed by the Engineer in-charge.
Upto Basement
Above Basement
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Grade Beam
Roof, Lintel Beam
Column
Sunshade
Supplying Fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
Steel
Supplying and fixing of Doors and Windows
Window 1.50m x 1.30m
Door double leaves ( 1.80 x 2.10 )
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with cm 1:3 mix( one cement and three sand ) to 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Finishing the top of Roof with one course of Machine Pressed tiles with CM 1:3 mix
Floor finishing with Ceromic Tiles of size 600 x 600x 8mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Weathering course with brick jally lime concrete using 20mm brick jally with pure slacked lime in the proportion of 32:12.5
Distembering two coats with best approved distember including cost including cost and conveyance of all materials to and all labour charges etc.complete for 10 sqm
Exterier Emulsion painting two coats with approved emulsion paint including cost and conveyance of all materials to and all labour charges etc.complete for 10 sqm
Distembering two coats with best approved distember including cost including cost and conveyance of all materials to and all labour charges etc.complete for 10 sqm
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Provision for electrification
Fan point ( SD 18 )
Light point ( SD 18 )
ceiling fan ( SD 110 )
plug point ( SD 38 )
EB Deposit
service wire ( SD 66 )
EB Metre board ( SD 125 )
EB Main board ( SD 145 )
Tube light
Providing rain water down fall pipe with necessary accessories including cost of all materials , conveyance and labour charges
Soak Pit
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20A
Supply and filling of good river sand including cost & conveyance & Labour charges etc, Complete.,.
40mm size ISS HBG metal laid over the Earthern Surface
20mm size ISS HBG metal laid outer alround RCC Rings
Erection of RCC Rings
RCC Rings 900mm dia and Cover Slab
Erection charges of RCC Rings with cover slab
Drinage pipe 110mm dia PVC Pipe 4kg PWD -M8865-P146
Provision for Sintex tank 1000 litre
Provision for Labour Sintex tank fittings
Provision for Portico Grill work
Provision for Name Board and Photo Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VIJAYALAKSHMI RADHAKRISHNAN (BID ID -1489173)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid