Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹12.7 L (9.62%)Admitted-Finance | ₹1.4 Cr+₹12.7 L (9.62%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical GROUND FLOOR MAKAMLUANG JIRIBAM JIRIBAM BIDYANAGAR IMPHAL WEST MANIPUR 795115 | JIRIBAM | MANIPUR | 795115 | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | ZERO GRAVITY L1 | SDA IMPEX PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00(A) BASKET BALL COURT: | |||||
| 2.00 | Compacting original ground supporting subgrage (Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction). | 742.4 | m2 | 91.03 ₹67,580.67 Lowest | 5,600 ₹41,57,440 |
| 3.00 | Construction of granular sub base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, complete as per cluase 401, Grading I Material | 91.2 | m3 | 2,927.04 ₹2,66,946.05 Lowest | 4,200 ₹3,83,040 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:5:10 ( 1 Cement: 5 coarse sand : 10graded stone aggregate 40 mm nominal size) | 91.2 | m3 | 8,576.53 ₹7,82,179.54 | 3,900 ₹3,55,680 Lowest |
| 5.00Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. | |||||
| 6.00 | (C) RCC Grade M20 (a) RCC Grade M20 using batching plant & Manual placing | 83.7 | m3 | 12,133.71 ₹10,15,591.53 | 1,500 ₹1,25,550 Lowest |
| 7.00 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. (b) Thermo-Mechanically Treated bars | 6,570.45 | kg | 113.29 ₹7,44,366.28 Lowest | 230 ₹15,11,203.5 |
| 8.00 | Basketball acrylic board :- 25 mm transparent Board Iron framing with primer and paint | 1 | pair | 84,609 ₹84,609 | 32,600 ₹32,600 Lowest |
| 9.00 | 8 layer acrylic flooring; (i) primer- 1 layer (ii) resurfacer- 2 layer. (iii) cushion- 2 layer (iv) Color coat- 2 layer | 4,520.9 | sqft | 83.54 ₹3,77,675.99 Lowest | 430 ₹19,43,987 |
| 10.00 | Iron pole with primer and paint | 1 | pair | 77,112 ₹77,112 | 9,500 ₹9,500 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
7 Apr 2026, 11:00 amClosed
DC/ED DRDA Tamenglong.
Office of the DC/ED DRDA Tamenglong.
Construction of Basket-ball court with Gallery and providing High Mast lighting system at JNV school complex , Tamenglong
2026_RDnPR_3347_3
DC/TML-JNV/DRDAQ(Tml)
Open Tender
Civil Works
Works
365 days
As Per Tender Document
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
DC/ED DRDA Tamenglong
₹2.9 L
8 Apr 2026
24 Mar 2026
7 Apr 2026
24 Mar 2026
7 Apr 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1(A) BASKET BALL COURT: | |||||
| 2 | Compacting original ground supporting subgrage (Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction). | 1 | m2 | - | - |
| 3Construction of granular sub base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, complete as per cluase 401, Grading I Material | |||||
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:5:10 ( 1 Cement: 5 coarse sand : 10graded stone aggregate 40 mm nominal size) | |||||
| 5Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. | |||||
| 6(C) RCC Grade M20 (a) RCC Grade M20 using batching plant & Manual placing | |||||
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. (b) Thermo-Mechanically Treated bars | 1 | kg | - | - |
| 8Basketball acrylic board :- 25 mm transparent Board Iron framing with primer and paint | |||||
| 9 | 8 layer acrylic flooring; (i) primer- 1 layer (ii) resurfacer- 2 layer. (iii) cushion- 2 layer (iv) Color coat- 2 layer | 1 | sqft | - | - |
| 10Iron pole with primer and paint | |||||
stage.html
html • 0.03 MB
techsummary_3635.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.97 MB
BOQ_3635.xls
BOQ • 0.36 MB
Extension.pdf
PDF • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .