Loading…
Loading…
Tender Value
₹44.1 L
EMD Value
₹88,200
Closing Date
1 Jul 2026, 10:30 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Revenue
HQ
6 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per Part I Offer Letter, Part II General Instructions to tenderer and Tender Conditions & Annexures-Attached
Annual Maintenance shut-down works 2026- (Group-1) of EOT cranes and EAF's of Steel Melting Shop.
RWF-M-OT-MMS-2026-27-29
RWF-M-OT-MMS-2026-27-29
Open
Works - General
12 Months
Bengaluru Urban, Karnataka
₹0
₹88,200
1 Jul 2026
9 Jun 2026
17 Jun 2026
5 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 15,25,224 | ||
| 1. Servicing of LT Gear boxes in EOT Crane No. 1 & 2 a) Removal of Inspection cover from the girder. b) Fixing of diversion pulleys. c) Connecting of winch motor wire rope through the roof pulleys to the gearbox. d) Dismantling of coupling fasteners, motor fasteners, gearbox base fasteners. e) Lowering of gearbox & float shaft to the ground. f) Dismantling of gearbox cover, removal of gears from gearbox. g) Removal of used old oil from the gearbox & cleaning of gearbox. h) Removal of bearings, removal of output shaft coupling & bearings, fitment of new oil seal, bearings, pressing of new rigid coupling. i) Assembling of gearbox. j) Lifting of gearbox & float shaft onto crane, Fitment of gearbox, connecting of float shaft to Gearbox & wheel, filling of oil to gearbox. k) Lubrication of couplings by greasing. l) Alignment and trial run. Qty - 08 Nos. 2. Servicing of AH Gearboxes in EOT Crane No. 1 & 2 a) Fixing of diversion pulleys. b) Connecting of winch motor wire rope through the roof pulleys to the gearbox. c) Removal of AH wire ropes from rope drum after lowering of bottom block to the ground. d) Dismantling of AH motor base fasteners and shifting of AH motor. e) Dismantling of coupling, fasteners, gearbox base fasteners, brake units. f) Removal of 68 kg electro hydraulic thrustors. g) Removal of gearbox cover & lowering of first line shaft assembly to the ground. h) Pressing out of drum, coupling from the input shaft. i) Replacement of new oil seals & bearings, pressing of drum & coupling onto the input shaft. j) Connecting of female coupling to the brakedrum. k) Removal of used old oil from the gearbox & cleaning of gearbox. l) Lifting of first line shaft brake drum assembly onto the crane. m) Placement of cover onto the gearbox & fitment of fasteners. n) Removal of used male coupling of motor and fitment of new one. o) Connecting of motor coupling to gearbox. p) Alignment of AH motor to gearbox. q) Connecting of tachomotor coupling to AH motor coupling. r) Filling of new gearbox oil, trial run without AH wire rope. s) Lubrication of input shaft coupling by greasing. t) Fixing of AH wire ropes to the rope drum and lifting of bottom block, trail run. Qty - 02 Nos. (Refer Part V of Tender documents for complete description) | — | — | — | 15,25,224 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
PartIOfferletter.pdf
ATTACHMENT
PartIIInstructionstoTenderers.pdf
ATTACHMENT
PartIIISpecialconditions.pdf
ATTACHMENT
PartIVPricesandpayments.pdf
ATTACHMENT
PartVBreakupofratesandschedule.pdf Part V Breakup of rates and schedul
ATTACHMENT
PartVIAnnexures.pdf
ATTACHMENT
PartVIINITfore-tender.pdf
ATTACHMENT
Part VIII GCC doc
ATTACHMENT
PartVBreakupofratesandschedule.pdf
ATTACHMENT
GCC_April-2022_merged_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .