Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | +1.99% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 L+₹1,311.32 (0.79%)Admitted-Finance | +2.80% | ₹1.7 L+₹1,311.32 (0.79%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 L+₹1,635.10 (0.99%)Admitted-Finance | +3.00% | ₹1.7 L+₹1,635.10 (0.99%) | L3 | Admitted-Finance |
Tender Value
₹70 L
EMD Value
₹35,000
Closing Date
17 Aug 2026, 12:00 pmClosed
EE PHED DIVISION AMET
EE PHED DIVISION AMET
NIT 48
2026_PHCJA_586650_8
EE 41-49/2026-27
Open Tender
Civil Works - Water Works
Percentage
330 days
AMT
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
EE PHED DIVISION AMET
₹35,000
26 Aug 2026
14 Aug 2026
17 Aug 2026
14 Aug 2026
17 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of RCC open wells (4.00 mtr dia & 25 mtr depth) | - | - | - | - |
| 2 | Earth work in excavation over areas (exceeding 30cm depth, 1.5 mtr in width and 10 SQM in plan) for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter.
Rates are exclusive of GST. | - | - | - | - |
| 3 | All kind of soil | 1 | /Cum | 266.1 | ₹266.1 |
| 4 | Ordinary Rock | 1 | /Cum | 571.19 | ₹571.19 |
| 5 | Hard Rock (Requiring blasting) | 1 | /Cum | 827.12 | ₹827.12 |
| 6 | Hard Rock (Blasting Prohibited) | 1 | /Cum | 1,148.31 | ₹1,148.31 |
| 7 | Add extra over item No. 2.39.1 for every additional lift of 1.5 Mtr. or part thereof : In all kind of soils.
Rate is exclusive of GST. | 1 | /Cum | 39.83 | ₹39.83 |
| 8 | Add extra over item No. 2.39.2-4 for every additional lift of 1.5 Mtr. or part thereof : In Ordinary rock and hard rock.
Rate is exclusive of GST. | 1 | /Cum | 56.78 | ₹56.78 |
| 9 | Add 20% extra over item No. 2.39 for excavation in saturated soil where pumping or baling out of water is required, including shoring strutting where required and dewatering. | 1 | /Cum | - | - |
| 10 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
TD_48.pdf
Tender Documents • 15.91 MB
BOQ_1044347.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .