Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | I₹8.9 LAccepted-Finance | I | Accepted-Finance Lowest | |
| 2 | II₹8.9 LAccepted-Finance 44 621708 | PERAMBALUR | TAMIL NADU | 621708 | II | Accepted-Finance Highest |
| Sl No | Description | Qty | Unit | KATHIRAVAN R L2 | Mohan R L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard red earth, shales, murrams, gravel, hard rock not requiring blasting etc., Complete. | 24.39 | Cum | 255 ₹6,219.45 | 246 ₹5,999.94 Lowest |
| 2.00 | Cement Concrete 1:4:8 mix using 40 mm HBGS metal inculding cost and coveyance of all materials to site and all labour charges etc., Complete. | 42.16 | Cum | 5,250 ₹2,21,340 | 5,129 ₹2,16,238.64 Lowest |
| 3.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc., Complete. Centering For Below GL:- | 177.23 | Sqm | 525 ₹93,045.75 | 516 ₹91,450.68 Lowest |
| 4.00 | Cement Concrete 1:3:6 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site and all labour charges etc., Complete. | 31.91 | Cum | 5,555 ₹1,77,260.05 | 5,452 ₹1,73,973.32 Lowest |
| 5.00 | Cement Concrete 1:2:4 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site and all labour charges etc., Complete. | 25.51 | Cum | 6,125 ₹1,56,248.75 Lowest | 6,505 ₹1,65,942.55 |
| 6.00 | Brick work in cement mortar 1:5 mix using country bricks including all cost & conveyance of all materials to site and all labour charges etc., Complete. | 7.38 | Cum | 6,125 ₹45,202.5 | 5,957 ₹43,962.66 Lowest |
| 7.00 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding all cost and conveyance of all materials to site and labour charges etc., Complete. | 65.49 | Sqm | 275 ₹18,009.75 | 268 ₹17,551.32 Lowest |
| 8.00 | 50mm GI Pipe | 28 | Rm | 465 ₹13,020 | 464 ₹12,992 Lowest |
| 9.00 | Galvanised sheet | 19.8 | Sqm | 1,125 ₹22,275 | 1,041 ₹20,611.8 Lowest |
| 10.00 | Provision for Name board charges | 1 | No | 4,650 ₹4,650 | 4,000 ₹4,000 Lowest |
Tender Value
₹8.9 L
EMD Value
₹9,000
Closing Date
10 May 2025, 3:00 pmClosed
BDO VP Veppur Block
BDO VP Veppur Block Perambalur
Construction of Thrashing Floor Nannai Panchayat Veppur Block Perambalur District
2025_RDTN_554261_1
B5/0971/2025 03.05.2025
Open Tender
Civil Works
Item Rate
120 days
BDO VP Veppur Block
As Per Tender Documents
3 documents required · 3 mandatory
₹0
₹9,000
5 Nov 2025
3 May 2025
10 May 2025
3 May 2025
10 May 2025
3 May 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .