| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-AOC | ₹3.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.8 CrSame as L1Rejected-Finance | ₹3.8 CrSame as L1 | L2 | Rejected-Finance L2 |
| 3 | L2₹3.8 CrSame as L1Rejected-Finance | ₹3.8 CrSame as L1 | L2 | Rejected-Finance L2 |
| 4 | L2₹3.8 CrSame as L1Rejected-Finance | ₹3.8 CrSame as L1 | L2 | Rejected-Finance L2 |
| 5 | Rejected-Technical RAJAPUR SHASTRINAGAR GHAZIABAD UTTAR PRADESH | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | - | - | Rejected-Technical all requried not complete |
Tender Value
₹4.5 Cr
EMD Value
₹13.5 L
Closing Date
28 Feb 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Construction work of road and side track from Utsav Bhawan to Medical Chowk via Sain Chowk and from Chanakya Chowk to Jalbi Chowk under Vijaynagar Zone.
2026_DOLBU_1113580_18
107/Nirman/2025-26 Date 16.01.2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹26,490
₹13.5 L
21 May 2026
9 Feb 2026
28 Feb 2026
9 Feb 2026
28 Feb 2026
9 Feb 2026
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge SI NO 251 (a)
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.DSR 2023 16.83
Deduct the cost of old tiles etc A.R
Disposal of earth up to 8.00 Km from site including etc. all complete work. S.I.N0-231(A)
S/L of 22.4 to 53 mm gauge stone ballast with stacking for measurement etc all complete as per direction of engineer in charge ( As per PWD SOR 2020 RMR)
Supply of Screening material with stacking for measurement etc all complete as per direction of engineer in charge
Consolidation stone aggregates of 45-63mm/22.4-53mm size to water bound macadam,specification including spreading in uniform thickness hand packing rolling with three wheel 80-100 KN static roller in stages to proper grade and camber applying and brooming crushable screening to fill-up the interstices of coarse aggregate,watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405.SOR 2022 Page N0-51 (752)
Providing applying tack coat with bitumen VG 10 Grade using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared graunlar surface treated with primer and cleaned with hydraulic broom as per technical specifications causes 503 RMR
Providing and laying dence grade bituminous macdam with HMP.producing and average output of 75 tonnes per hour using crushed aggregate from approved quarry of specified grading premixed with bituminous binder(VG-30)@4.5 per cent by weight of total mix and filler,transporting the hot mix to work site,laying with a hydrestatic paver finisher to the required grade,level alignment,rolling with smooth wheeled vibratory and tandern rollers to achieve the desired compaction. RMR
Providing applying tack coat with bitumen VG 10 Grade using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared graunlar surface treated with primer and cleaned with hydraulic broom as per technical specifications causes 503 RMR
Providing and laying bituminous concrete with HMP. crushed aggregate from approved quarry of specified grading premixed with bituminous binder(VG-30)@5.4 per cent by weight of total mix and filler,transporting the hot mix to work site,laying with a hydrestatic paver finisher to the required grade,level alignment,rolling with smooth wheeled vibratory and tandern rollers to achieve the desired compaction.
P/L of hot applied thermoplastic compund 2.5 mm thick including reflectorising glass leads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied Glass beads as per IRC:35-2015 The finished surface to be level,uniform and free streaks and holes.S.I N0- 22.2 SOR 2022
Reflective Raised Pavement Markers ( Cat Eye / Road Stud) Supply and fixing of raised pavement marker with Made of Plastic body of RPM Road Stud shall be moulded from ASA installation and incidentals all complete as per direction of the Engineer - in - Charge S.I N0- 22.5 SOR 2022
Solar power road marker (Solar studs)the solar studs shall bemade of Aluminium alloy and poly (8.35) carbonate material which shall be absolutely weather resistant and suggestiv strong enough to support a load of 13,635 Kg tested in accordance with ASTM D4280. Its colour may be white, red, yellow, green or blue or combination as directed by the engineer its water resistance meet the requirements of IP 65 in accordance with IS:12063:1987 category 2 for protection against water ingress. The dimensions of solar studs shall not be less then 100mmx100xxx10mm. It shall have super bright LEDs so as to provide long visibility from a distance of more than 800 m. Its flashing rate shall not be less then 1Hz. Its should be able to give the prescribed performance in the temperrature range of-400C to +550C. Its Life shall be not less than 3 years. The rate shall including all materials, labour, equipments, fabrication, transportation, erection, installation and incidentals all complete as per direction of the Engineer-in-charge SOR 2022
Supply & laying 80mm thick precase cement concrete i-sape interlocking paver block (Grey color) with top layer of minimum 8mm thickness having plan dimension 200x(160+120mm) of O.P cement smoothing gloss finish,skid resistant manufacture from rubber moulds through vibro-compression mechanism, the compressive strength of concrete paver block shall not be less than 30mpa (M-30) and weight 5kg. per no. confirming to IS:15658-2006 including cost of material, labour,t&P etc. required for proper completion of the work as directed by Engineer-in-charge RMR
M-150 Brick work in 1:4 one cement and four course sand mortar in foundation and plinth Including suppy of all material labour,T&P etc required for proper completion of the work S.I No 305(a) SOR-2022
P.c.c in 1:2:4 with 2 cm gauge stone grit of instead of 4 cm gauge stone ballast etc all complete.S.I No 279 (a)SOR 2022
Scraping old white or colour wash including disposal of refuse as Directed by the Engineer-in-charge within a distance of 60metre(200Feet) SOR 2022 S.I N0 708
Providing wall putty on old surface with approved quality material of berger J.K/Birla or Similar make 2 coats SOR 2022 New Item P.N.45
Painting or varnishing work in small areas or wood work with two coat (upto one square metre of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of materials, labour, Tools & plants etc. required for proper completion of the work. above but for every coat on perviously painted etc
MS Iron work of small size and section etc a/c work For Divder etc a/c
S/F Sign Board
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_2062338.xls
BOQ • 0.37 MB
T1-T2-T3.pdf
Additional Documents • 2.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .