| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.3 CrAccepted-AOC 201 ROYAL ARCADE DR B BARUAH ROAD ULUBARI GUWAHATI 781007 | GUWAHATI | KAMRUP METRO | ASSAM | 781007 | ₹31.3 Cr | L1 | Accepted-AOC Awarded |
| 2 | L1₹31.3 CrRejected-Finance JYOTIKUCHI KARBI PATH BYE LANE 1 HOUSE NO 0 CITY TOWN GUWAHATI P O SUALKUCHI P S FATASHIL AMBARI DISTRICT KAMRUP METRO PIN 781034 | KAMRUP METRO | ASSAM | 781034 | ₹31.3 Cr | L1 | Rejected-Finance Rejected |
| 3 | L1₹31.3 CrRejected-Finance | ₹31.3 Cr | L1 | Rejected-Finance Rejected |
| 4 | L1₹31.3 CrRejected-Finance | ₹31.3 Cr | L1 | Rejected-Finance Rejected |
| 5 | L1₹31.3 CrRejected-Finance | ₹31.3 Cr | L1 | Rejected-Finance Rejected |
Tender Value
₹34.7 Cr
EMD Value
₹69.5 L
Closing Date
20 Sept 2024, 2:00 pmClosed
Chief Engineer (Roads), PWRD, Assam
O/o the Chief Engineer Roads, PWRD, Assam, Chandmari, Guwahati, 781003.
SOPD_G_24_25_05 Construction of Road from Lanka Umrangso State Highway(SH-20) to Dalmia Cement Plant under SOPD-G for the year 2024-25.
2024_PWD_38932_1
CE/DEV/TB/203/2024-25/01
Open Tender
Civil Works
Item Rate
540 days
Dima Hasao
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,000
₹69.5 L
Yes
O/o the Chief Engineer Roads, PWRD, Assam
13 May 2025
11 Sept 2024
20 Sept 2024
11 Sept 2024
20 Sept 2024
13 Sept 2024
11 Sept 2024 - 18 Sept 2024
18 Sept 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
(I) ByManual Means | 7.29 | Ha | 52,995.08 | ₹3,86,334.13 |
| 2 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per
Technical Specification Clause 201.
(i) Girth from 300mm to 600mm | 30 | Each | 255.95 | ₹7,678.5 |
| 3 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per
Technical Specification Clause 201.
(ii) Girth from 600mm to 900mm | 55 | Each | 438.55 | ₹24,120.25 |
| 4 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per
Technical Specification Clause 201.
(iii) Girth from 900mm to 1800mm | 10 | Each | 877.56 | ₹8,775.6 |
| 5 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes,in accordance with requirements of lines, grades and cross sections,loading and disposal of cut road with in all lifts and leads upto 1000 metres) | 2,67,851.96 | Cum | 67.8 | ₹1,81,60,362.89 |
| 6 | Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lift and lead up to 1000metres, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections. | 50,222.24 | Cum | 100.01 | ₹50,22,726.22 |
| 7 | Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross-sections, loading and disposal of cut rock with a lift upto 1.5 m and leads upto 1000 m as per Technical Specification Clause 302.3.5 | 16,740.75 | Cum | 261.03 | ₹43,69,837.97 |
| 8 | Construction of embankment with approved materials deposited from roadway cutting and excavation from drain and foundation of other structures
graded and compacted to meet requirement of Table 300-2 | 1,33,925.98 | Cum | 169.84 | ₹2,27,45,988.44 |
| 9 | Construction of embankment with materials obtained from borrowpits with initial lead up to 3km, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 (including land compensation of
earth) (b) 'From private land | 2,82,726.15 | Cum | 258.21 | ₹7,30,02,719.19 |
| 10 | Construction of subgrade with approved materials obtained from borrow pits, with initial lead up to 3.00 km transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 (including land compensation of earth)
(a) 'From private land | 19,036.24 | Cum | 339.68 | ₹64,66,230 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_63088.xls
BOQ • 0.45 MB
152085509.pdf
Tender Documents • 1.80 MB
152085511.html
Tender Documents • 0.03 MB
FOB.pdf
Tender Documents • 0.14 MB
SBDDalmia.pdf
Tender Documents • 5.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .