Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-Finance 15 KEWALPURI SARWAT ROAD SADAR MUZAFFARNAGAR UTTAR PRADESH 251002 | MUZAFFARNAGAR | UTTAR PRADESH | 251002 | ₹2.4 Cr | L1 | Accepted-Finance First Lowest |
| 2 | L2₹2.4 CrAccepted-Finance GROUND FLOOR 66A BLOCK F GALI NO 4 HARI NAGAR EXTN PART 2 66A BADARPUR BADARPUR SOUTH EAST DELHI SOUTH DELHI DELHI 110044 UDYAM DL 09 0032523 | SOUTH EAST DELHI | DELHI | 110044 | ₹2.4 Cr | L2 | Accepted-Finance Second Lowest |
| 3 | L3₹2.4 CrAccepted-Finance N A | FARIDABAD | HARYANA | 121004 | ₹2.4 Cr | L3 | Accepted-Finance Third Lowest |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
27 Jul 2026, 2:00 pmClosed
General Manager, UPPCL, Zone-6 Noida
K-2, Sector-116, Noida Gautambudha Nagar
Construction Work of Girls Hostel Building at Government Inter College Tughlaqpur Kamhera, Block Purkaji in District Muzaffarnagar
2026_UPPRC_1169254_1
39/PCL/GM/Zone-6/Noida/2026-27 Dt 13.07.2026
Open Tender
Civil Works
Percentage
180 days
Government Inter College Tughlaqpur Kamhera, Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹5.8 L
25 Aug 2026
14 Jul 2026
27 Jul 2026
14 Jul 2026
27 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 1 | CUM | 181.86 | ₹181.68 |
| 2 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | 0.4 | CUM | 4,759.15 | ₹1,898.9 |
| 3 | Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. | - | CUM | 1,483.74 | - |
| 4 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 1 | SQM | 216.61 | ₹216.39 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (Raft foundation) | 1 | CUM | 6,319.74 | ₹6,313.42 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (Column) | - | CUM | 6,319.74 | - |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (Plinth beam) | 1 | CUM | 6,319.74 | ₹6,313.42 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:1:4 (1 cement : 4 sand) | 0.8 | CUM | 5,149.44 | ₹4,119.55 |
| 9 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil. | - | SQM | 102.11 | - |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). Slab | 0.4 | CUM | 8,038.22 | ₹3,215.29 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
Tender39.pdf
Tender Documents • 3.33 MB
DWG39.pdf
Additional Documents • 10.89 MB
BOQ_2194159.xls
BOQ • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].