Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | ₹16.0 L | L1 | Accepted-AOC ok |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | A P CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification. | 451 | M3 | 197.8 ₹89,207.80 |
| 2.00 | Cement Concrete 1:4:8 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 44 | M3 | 5,651 ₹2.5 L |
| 3.00 | Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification | 239 | M2 | 579.4 ₹1.4 L |
| 3.01 | For side wall | 29 | M2 | 575.4 ₹16,686.60 |
| 3.02 | For culvert Centering | 31 | M2 | 1,246.5 ₹38,641.50 |
| 4.00 | Plain Cement Concrete 1:2:4 mix (One Cement, Two Fine Aggregate and Four Coarse Aggregate) Using 20mm ISS HBG Metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 144 | M3 | 6,528.5 ₹9.4 L |
| 5.00 | Supply And Filling of M.Sand including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers | 4 | M3 | 1,814.8 ₹7,259.20 |
| 6.00 | Supply And Filling of 40mm ISS HBG Metal including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers | 4 | M3 | 1,598.9 ₹6,395.60 |
| 7.00 | Supply And Filling of 20mm ISS HBG Metal including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers | 4 | M3 | 2,133.4 ₹8,533.60 |
| 8.00 | Supply And Filling of 20mm Brick Jally including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers | 4 | M3 | 826.4 ₹3,305.60 |
Tender Value
Refer Docs
EMD Value
₹19,500
Closing Date
20 May 2026, 3:00 pmClosed
EXECUTIVE OFFICER
C Pudupatti Town Panchayat
Construction of Storm Water Drainage at ward 15 indira colony from sridhar thottam to rabupudin thottam in C Pudupatti Town Panchayat
2026_DTP_677302_1
116/2026
Open Tender
Civil Works - Others
180 days
C Pudupatti Town Panchayat Limit
As Per tender Document
3 documents required · 3 mandatory
₹0
₹19,500
Yes
C Pudupatti Town Panchayat
26 May 2026
16 May 2026
20 May 2026
16 May 2026
20 May 2026
16 May 2026
16 May 2026 - 20 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification. | 451 | M3 | - | - |
| 2 | Cement Concrete 1:4:8 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 44 | M3 | - | - |
| 3 | Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification | 239 | M2 | - | - |
| 3.01 | For side wall | 29 | M2 | - | - |
| 3.02 | For culvert Centering | 31 | M2 | - | - |
| 4 | Plain Cement Concrete 1:2:4 mix (One Cement, Two Fine Aggregate and Four Coarse Aggregate) Using 20mm ISS HBG Metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 144 | M3 | - | - |
| 5 | Supply And Filling of M.Sand including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers | 4 | M3 | - | - |
| 6 | Supply And Filling of 40mm ISS HBG Metal including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers | 4 | M3 | - | - |
| 7 | Supply And Filling of 20mm ISS HBG Metal including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers | 4 | M3 | - | - |
| 8 | Supply And Filling of 20mm Brick Jally including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers | 4 | M3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.30 MB
BOQ_813825.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid