Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance | L1 | Accepted-Finance OK | |
| 2 | L2₹1.6 L+₹3,117.64 (1.95%)Accepted-Finance UNKNOWN | L2 | Accepted-Finance OK | |
| 3 | L3₹1.6 L+₹4,353.64 (2.72%)Accepted-Finance | L3 | Accepted-Finance OK |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
17 May 2024, 12:00 pmClosed
Executive Engineer
220KV sub station Lucknow Road Hardoi
Replacement of various equipments to attend emergency breakdown at various 220KV and 132KV sub station under ETD Hardoi
2024_UPTCL_924107_1
01/ETDH/2024-25
Open Tender
Electrical Works
Fixed-rate
365 days
Hardoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer ETD Hardoi
₹2,000
17 May 2024
6 May 2024
17 May 2024
6 May 2024
17 May 2024
6 May 2024
Amount
Replacement of various 220 KV, 132 KV and 33 KV equipments under ETD, Hardoi alongwith other associated works during the period of 1 year with all due care of safety & precautions, with all cost of men, misc. consumables, T&Ps etc. required for satisfactory completion of the work as per technical specification & direction of the supervising engineer. 1. Replacement of defective / damaged 33 KV VCB installed at 132 KV S/S, Hardoi/ Sandila /Baghauli/ Shrimau/ Asha/ Shahabad /Bharawan (i) Dismantling of 33 KV damaged / defective VCB including shifting of dismantled VCB form switch yard to storage place / store room.
(ii) Modification of 33 KV VCB foundation as per site requirement/ as per manufacturing drawing or as per direction of supervising Engineer and shifting of earthing & both side jumper.
(iii) Erection of new 33 KV VCB in proper alignment and cable termination of circuit breaker as per logic for tripping/ closing, spring charging/ indication/ supervision circuit with proper ferruling and checking out of breaker operation from local / remote including earthing & connection of both side jumpers and works related to complete the erection work. All required T&P, skilled labours, crane / hydra etc. shall be arranged by the contractor at his own cost.
2. Replacement of 220 KV CT/CVT/PT with all cost of required T&P, skilled labours, crane/hydra etc. shall be arranged by the contractor at his own cost. (i) Dismantling of 220 KV CT/CVT/PT after opening of its both side jumpers, earthing & cable termination etc. including shifting of dismantled material from site to store.
(ii) Erection of new 220 KV CT/CVT/PT including shifting of new 220 KV CT/CVT/PT from store to site. The works also includes jumpering from both side, earthing and cable termination.
3. Replacement of 132 KV CT/PT with all cost of required T&P, skilled labours, crane/hydra etc. shall be arranged by the contractor at his own cost. (i) Dismantling of 132 KV CT/PT after opening of its both side jumpers, earthing & cable termination etc. including shifting dismantled material from site to store.
(ii) Erection of new 132 KV CT/PT including shifting of new 132 KV CT/PT from store to site. The works also includes jumpering from both side, earthing and cable termination.
4. Replacement of 220 KV/132 KV LA with all cost of required T&P, skilled labours, crane/hydra etc. shall be arranged by the contractor at his own cost. (i) Dismantling of 220 KV/132 KV LA after opening of its jumpers, earthing including shifting of dismantled material from site to store.
(ii) Erection of new 220 KV/132 KV LA including shifting of new LA from store to site. The works also includes jumpering from side, earthing and cable termination.
Verma Enterprises
vivaan enterprises
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .