Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC GHOSHPUKUR DIST DARJEELING | ₹1.7 L | L1 | Accepted-AOC AOC |
| 2 | L2₹1.7 LRejected-Finance | ₹1.7 L | L2 | Rejected-Finance L2 |
| 3 | L3₹1.7 LRejected-Finance | ₹1.7 L | L3 | Rejected-Finance L3 |
Tender Value
₹1.7 L
EMD Value
₹3,478
Closing Date
9 Feb 2026, 1:00 pmClosed
BDO
PHANSIDEWA DEV BLOCK
Construction of C. C. Road from Samir Toppo house to Pucca Road house at Sastujote Sansad within Sastujote Shishu Shiksha Kendra R-1 Booth for Amader Para amader samadhan for the year 2025-26.ID NO APAS/01/027/190/0004 (2nd CALL)
2026_DMD_997670_5
75/DEV/PHD/APAS/GHP/2025-26
Open Tender
CIVIL WORKS
30 days
PHANSIDEWA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹3,478
Yes
6 Mar 2026
2 Feb 2026
12 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
Box cutting or filling in Road embankment in all sorts ofsoil including spreading the spoils properly over theflank as necessary or on berm to approximate grade& camber and rolling the sub-grade with power rollerto proper camber and grade as per direction andsatisfaction of Engineer-in-charge including uprootingand removing plants and jungles when and wherenecessary.
Spreading and consolidation River bed materials to a compected depth of 75 to 100 mm and above with power roller to proper gradient and camber including watering as necessary, lighting, guarding, barricading and making earthen bund there necessary to protect edges and curing with water 2 to 3 days mending cracks and depression by rolling where necessary complete as per specifications. Al incidental chares of roller, inclusive of the cost of fuels and lubricants are included. (payment will be made on the basis of finished compacted volume of river bed materials).
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
(II) Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. River bazree. [Page 24, Sl No. 4 (b)]{Vide Page 5 of 6th corrigenda of dated 29/07/2019}
Hire and labour charges for Shuttering with orwithout staging upto 4.0 m height using approvedstout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind ofplain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross drain etc. The rate is inclusive of fitting, fixing andstriking out after completion of work as perspecification and direction. (a) Where staging is not required.
Supplying, fitting and fixing GI Shade Display Board. L/S
Add CGST & SGST @ 18%
Labour welfare cess @ 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 0.15 MB
BOQ_2442883.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid