Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC 1 PNETH CHOORI CHAMBA CHAMBA HIMACHAL PRADESH 176311 UDYAM HP 02 0007745 | CHAMBA | HIMACHAL PRADESH | 176311 | ₹7.4 L Quoted ₹7.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.5 LRejected-Finance ESD BAIJNATH DISTT KANGRA | KANGRA | HIMACHAL PRADESH | 175013 | ₹8.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹8.6 LRejected-Finance GOVT CONTRACTOR VILL GUJREHRA TIKKRI P O TEHSIL JAISINGHPUR DISTT KANGRA H P 176095 | KANGRA | HIMACHAL PRADESH | 176095 | ₹8.6 L | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical VILL DUDHANA DISTT HAMIRPUR HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | - | - | Rejected-Technical Techno-commercially not Qualified |
Tender Value
₹7.4 L
EMD Value
₹8,000
Closing Date
12 Feb 2026, 10:00 amClosed
Sr. Executive Engineer
O/o Sr. Executive Engineer ED Hamirpur
Prov. SOP for improvement and remodeling of LWSS Hamirpur Town from Hiranagar by prov CT PT unit, 11 KV HT Line at Hiranagar in ES Anu UESD No. II Hamirpur. (ON PARTIAL TURN KEY BASIS).
2026_HPSEB_127718_1
HPSEBL/EDHMR/E/2025-26/315
Open Tender
Electrical Works
60 days
Hamirpur
Please refer to tender Doc
3 documents required · 3 mandatory
₹590
₹8,000
31 Mar 2026
6 Feb 2026
12 Feb 2026
6 Feb 2026
12 Feb 2026
6 Feb 2026
HT LINE with Tapping point :ACSR 80mm², (Eq. to Racoon) 7/3.81conductor additional 1% (Sag, Jumpering and wastage}
11 Mtr. Long ISI marked, Swaged Steel Tubular poles as per IS:2713/1980 (Part-I-III) as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-56.
RCC Muff 2000mm Long with concrete filling material
GO AB Switch Unit (11KV, 400A,25KA) Tripple pole O/D type
D.O Fuse Unit
MS Chanel Iron (75x40x6 mm), Length: 460 mm x ( 1 No. for GO Switch Handle mounting).
Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]
X-Arm (Horizontal) - MS Channel Iron C type: 100X50x5, Length: 2340 mm x 2 No.] ∆ Formation
MSAI Bracing Set for X-Bracing set for double pole str of Size (50X50x6, Length :2125mm each ( 2 Nos per set ).
Discs insulator sets (comprising 1 No. Disc: (Polymeric Disc Insulator BS, 12 kV, 90 kN) including Ball Cleave, Bend Stapple, Dead End Clamps etc.)
11 kV Pin Insulators (Porcleian 12 kV, 5 KN) with GI Pin (3Nos. Per Pole Structure)
HT Stay Set Complete i/c Guy Assembly and Helically fittings)
Stay wire 7/3.15 mm@ 10.00 kG per stay set
HT Pipe Earthing Set complete in all respect.
Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg.one road crossing @ 20 m and Additional 3% (Sag and wastage)} including Cross Lacings (GI, 8 SWG) [ 2.2 m x 9 Nos @ 2 m spacing] at road crossings {0.102 kg/m}
Eye hook
M.S.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm² or more (with flat and spring washers)]
Barbed Wire
Danger Plate (250X200X1.6 mm)
Half Clamp made of M.S. Flat of size(50 x 6mm).
Full Clamp made of M.S. Flat of size(50 x 6mm).
Aluminium Paint
11 KV Isolator Isolator(630 A, 25 KA) motorised
CTPT UNIT :CT-PT Combined Unit [PT:11 kV/110 V) ; CT:10-400/5A]
3-phase, 3/4-Wire CT-PT operated Static Trivector Meter (DLMS Compliant
i) PVC Multistrand 2.5 mm² copper wire
ii) 1 inch dia GI pipe for concealing
bend joints/ elbow
Steel Tubular Poles 11 m, Working Load > 200 kgf/m²)
Muffs (2000mm) with concerete filling
X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 4 Nos]
X-Arm: [Channel Iron (75x40x4.8 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of CT-PT Unit]
MS Angle Iron (50X50x6 mm), Length: 2800 mm x1 Nos for LA's)
CT-PT Unit Belting & Knee Bracing MS Angle Iron (50X50x6 mm), Length : 2800 mm x 4 Nos
MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing
GO AB Switch Unit (11kV, 400A, 25 KA )
D.O Fuse Unit
Surge Arrester, 9 kV Station Class (Porcelain Type)
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
Stay set complete (i/c Stay Clamp)
6 Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
Pipe Earthing Set
GI Wire 6 SWG For Earthing
Half Clamp (M.S. Flat 50X6 mm)
Full Clamps (M.S. Flat 50X6 mm)
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Aluminium Thimble
Copper tinned thimble
Danger Plate
Barbed Wire
)Aluminium Paint.
Autoamtion and Digital data management system equipments for Electrical Infrastructure i.e. i) HP ProOne 440 23.8-inch G9 (Intel i5 Processor), 23" or higher All-in-One Desktop PC Intel Core 15-14500 (14th Gen) processor with 14 cores, 20 threads, 24 MB cache, and 65 W base power on an Intel Q-Series chipset with, Intel vPro and AMT support. It includes 8 GB DDR5 RAM (expandable to 64 GB), a 512 GB NVMe SSD, and Intel UHD Graphics 730, along with Windows 11 Pro (64-bit), along with UPS. 2)HP Laser MFP 1188fnw Printer Mono MFP Laser Printer 20ppm with wi-fi (Print, Scan & Copy). 3.HP Laser MFP 323d Printer Mono Chrome Laser printer A-4-28 PPM or higher (Print, Scan, Copy)4) HP Laser MFP 1188a Printer Mono Chrome Laser printer A-4-18 PPM (Print Scan, Copy)
ERECTION OF 11KV HT LINE : Erection of Single Pole Run through Structure with Steel Tubular Pole 11Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect.
Erection of Double Pole / Dead Pole Structure with Steel Tubular Pole 11Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect.
Erection of Stay Set (HT) as per latest standard practices /specification of REC / HPSEBL including Digging of pit (size0.9x0.7x1 .5 M),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
Erection of HT Earthing Set as per latest standard practices /specification of REC / HPSEBLincluding digging of pit of size 1.80x 1.2 x1.2 Mtrs, fixing of HT Earth Set, refilling the same and prov. earthing connection complete in all respect.
Laying of Conductor, Stringing, Sagging of ACSR, 80-100mm² and binding with Insulators (3 wires) and fixing of jumper.
Erection of Continous Earth Wire / Guaring wire i.e. Laying of GI Wire 8SWG , Stringing, Sagging of and binding with Insulators including erection of Guarding wire & Cross Lacings etc. at road crossings/ where ever necessary.
Erection of GO switch unit complete in all respect
Erection of 11 KV Isolator complete in all respect
ERECTION OF 11KV CTPT UNIT: Erection of Double Pole / Dead Pole Structure with Steel Tubular Pole 11Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect.
Erection of Stay Set (HT) as per latest standard practices /specification of REC / HPSEBL including Digging of pit (size0.9x0.7x1 .5 M),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
Erection of Earthing Set as per latest standard practices /specification of REC / HPSEBLincluding digging of pit of size 1.80x 1.2 x1.2 Mtrs, fixing of HT Earth Set, refilling the same and prov. earthing connection complete in all respect.
Erection of Continous Earth Wire / Guaring wire i.e. Laying of GI Wire 8SWG , Stringing, Sagging of and binding with Insulators including erection of Guarding wire & Cross Lacings etc. at road crossings/ where ever necessary.
Erection of GO switch unit complete in all respect
Erection of CT PT unit Erection of 30Ø, 11 kV DS/ CS/ MIP/ IDWPS Connection above 50 kW to upto 100 kW CT PT Unit, Trivector Meter, XLPE Cable etc.Complete in all respect.
Add Transportation charges/mannual carriage , loading unloding of material from site to store & store to site as instruction from Site Incharge complete job in all respect.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
SBD.rar
Tender Documents • 7.82 MB
BOQ_188659.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid