| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-AOC 3 LSC 2ND FLOOR OPP ANNADLOK SOCIETY GATE NO 1 DDA MARKET MAYUR VIHAR PHASE 1 NEW DELHI DELHI 110091 | EAST DELHI | DELHI | 110091 | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2 BIDDER DUE TO NOT L1 BIDDER | |
| 2 | Rejected-Technical SHUKIA MORE MORWA DISTT SINGRAULI MP | MORWA | SINGRAULI | MP | - | Rejected-Technical NOT L1 BIDDER |
Tender Value
₹14.7 L
EMD Value
₹18,400
Closing Date
8 Aug 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER EXCAVATION
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P.
Replacement of old worn out rail roller assembly with new assembly of ESH 20/90 Baidyanath Dragline of Khadia Project
2022_NCL_250683_1
KHD/G.M. (Excv)/E-Tender/22-23/377
Open Tender
Excavation Department Work
Item Rate
45 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹18,400
3 Feb 2023
19 Jul 2022
9 Aug 2022
19 Jul 2022
8 Aug 2022
20 Jul 2022
19 Jul 2022 - 27 Jul 2022
Amount
Scope of Work:- i. Lowering of boom on proper stand. ii. Complete cleaning / removal of cardium compound from tub assy. And other places of work. iii. Detection of cracks on the tub and lower portion of revolving frame. iv. Lifting of the complete revolving frame to have the clearance of 600mm by jacks and placement of solid support of tub at 8 places and wooden slippers support at the rear of the machine at 4 places. v. Removal of old swing rollers assy. vi. Removal of upper and lower rails by cutting the stoppers and cleats. vii. Fitment of new upper and lower rails and fixing of stoppers and cleats after proper alignment. viii. Fitment/ installation of new swing roller assy. ix. Lowering of complete revolving platform after removal of solid supports from tub as wooden support. x. Commissioning of rails and rollers assy and lifting of boom.
Labour Charges for above job
Labour Charges for Lowering of boom on suitable stand and re-erection after completion of work. Note : It includes Group of 2 No. highly skilled fitter, 2 No. highly skilled electrician, 2 No. highly skilled rigger, 2 Nos. semiskilled & 4 Nos. unskilled manpower in 2 shift per day for 2 days
Labour Charges for Cleaning of cardium / grease / oil / waste foreign materials around rail area and under revolving frame. Note : It includes Group of 4 Nos. semiskilled & 8 Nos. unskilled manpower in 2 shift per day for 6 days
Labour Charges for Dismnatling 6.6 KV power supply from ring collector and arrangement of alternate power supply: Note : It includes Group of 1 No. highly skilled fitter, 1 No. highly skilled electrician & 4 Nos. semiskilled manpower in 2 shift per day for 2 days
Labour Charges for Removal of ring collector and clamp of centre pintle and refitment. Note : It includes Group of 2 No. highly skilled fitter, 1 No. highly skilled welder & 6 Nos. semiskilled manpower in 2 shift per day for 6 days
Labour Charges for Removal of tub holds and refitting. Note : It includes Group of 2 No. highly skilled fitter, 2 No. highly skilled rigger, 4 Nos. semiskilled & 2 Nos. unskilled manpower in 2 shift per day for 2 days
Labour Charges for Removal of old rails and rollers. Note : It includes Group of 4 No. skilled fitter, 4 No. skilled welder & 8 Nos. semiskilled manpower in 2 shift per day for 8 days
Labour Charges for Fitment of new rail and roller assy. Note : It includes Group of 4 No. skilled fitter, 4 No. skilled welder & 8 Nos. semiskilled manpower in 2 shift per day for 8 days
Labour Charges for Alignment of rails. Note : It includes Group of 4 No. highly skilled fitter, 4 Nos. semiskilled & 4 Nos.unskilled manpower in 2 shift per day for 4 days
Labour Charges for Fitment and removal of support under the revolving frame by lifting and lowering of machine. Note : It includes Group of 2 No. highly skilled fitter, 2 No. highly skilled Rigger, 1 Nos. highly skilled electrician & 8 Nos. semiskilled manpower in 2 shift per day for 4 days
Supervision Charges of above job for commissioning of machine. Note : It includes 2 No. highly skilled Supervisor in 2 shift per day for 41 days
Hiring Charges for above job
Welding machine - 02 No. for a Max Period of 41 days
Gas cutting sets - 2 No with accessories for a Max Period of 41 days
Grinder Heavy Duty - 2 No. for a Max Period of 25 days
Hydraulic Jack 200 Ton capacity - 2 No. for a Max Period of 41 days
Hydraulic Jack 400 Ton capacity - 2 No. for a Max Period of 41 days
Crane 14 Ton capacity - 1 No. for a Max Period of 30 days
Misc. Tools & Tackles like hammers, spanners crow bars, D-shackles, jigs & fixtures, hand gloves, inspection lamp, manila rope, cleaning materials, chain blocks.
Special alignment tools and tackles
Transportation Charges for manpower
Grinding Wheels size: 100 mm X 25 mm
Total impact of GST for the purpose of CTC
Kohli Engineering Company
stage.html
html • 0.04 MB
techsummary_259023.pdf
PDF • 0.10 MB
finsummary_259023.pdf
PDF • 0.10 MB
scan0436.pdf
PDF • 1.40 MB
finance_259023.pdf
PDF • 0.10 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .