Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.9 L+₹5,085.30 (1.34%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.9 L+₹12,713.24 (3.34%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹4.1 L+₹27,281.93 (7.17%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹4.7 L+₹94,077.98 (24.7%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹6.9 L
EMD Value
₹13,740
Closing Date
30 Jul 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Construction of Culvert near Kartar floor mill at Nouni Panchayat Chilakh West Block Dinga Amb
2026_RDPR_316708_16
e-NIT No.125/REW/K of 2026-27 Dated 18/07/2026
Open Tender
Civil Works
Percentage
90 days
dinga amb
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹13,740
12 Aug 2026
18 Jul 2026
31 Jul 2026
18 Jul 2026
30 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by Mechlnical means over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed:All kinds of soil. | 16.2 | cum | 256.85 | ₹4,160.97 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 (1 cement: 5 coarse sand: 10 graded stone aggregate 40mm nominal size). | 2.7 | cum | 4,816.5 | ₹13,004.55 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring. shuttering, finishing and reinforcement-All work upto plinth level.1.1.5:3 (1 cement : 1.5 coarse sand : 3graded stone aggregate 20mm nominal size). | 13.29 | cum | 7,788.4 | ₹1,03,507.84 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 41.58 | cum | 5,733.6 | ₹2,38,403.09 |
| 5 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. | 1,594.8 | KG | 123.5 | ₹1,96,957.8 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 211.69 | sqm | 286.35 | ₹60,617.43 |
| 7 | Centring and shuttermg including strutting, propping etc. and removal of form for suspended floor | 18.18 | sqm | 718.2 | ₹13,056.88 |
| 8 | Centring and shuttermg including strutting, propping etc. and removal of form for beams | 10 | sqm | 577.55 | ₹5,775.5 |
| 9 | Centring and shuttermg including strutting, propping etc. and removal of form for edges of slab Above 20 cm wide | 8.55 | sqm | 1,145.1 | ₹9,790.61 |
| 10 | Supply and laying of River Bed Materials/ Earth filling of max. size 75mm leveling dressing watering consolidation in layer 20cm in depth each layer consolidated with power road roller of minimum 8 tonne capacity incl. carriages complete. ( L.M.R ) | 42 | cum | 325 | ₹13,650 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.91 MB
BOQ_1034796.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .