Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-AOC VILL P O CHINCHURIA DIST PASCHIM BARDHAMAN PIN 713378 W B | CHINCHURIA | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | 1 | Accepted-AOC ELIGIBLE L-1 BIDDER | |
| 2 | Rejected-Technical VILL CHINCHURIA PO CHINCHURIA JAMURIA PASCHIM BARDHAMAN WB 713378 | JAMURIA | PASCHIM BARDHAMAN | WB | 713378 | - | Rejected-Technical Technically may not be acceptable | |
| 3 | Rejected-Technical HARIPUR COLLIERY P O HARIPUR DIST PASCHIM BARDHAMAN PIN 713378 W B | HARIPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | - | Rejected-Technical Technically may not be acceptable |
| Sl No | Description | Qty | Unit | CHAKRABORTY AND COMPANY L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 1.01Material Cost | ||||
| 1.02 | Formation of chemical earth pits complete in all respect and connecting of the same to neutral and body of transformer. | 3 | nos. | 48,150 ₹1,44,450 Lowest |
| 1.03Labour Cost:- | ||||
| 1.04 | Installation , commissioning and testing of transformer (3.3kv/440V). | 1 | nos. | 16,374 ₹16,374 Lowest |
| 1.05 | Formation of chemical earth pits complete in all respect and connecting of the same to neutral and body of transformer. | 3 | nos. | 1,637 ₹4,911 Lowest |
| 1.06 | P. F. amount for labour cost | 1 | no. | 2,630.83 ₹2,630.83 Lowest |
| 1.07 | Total impact of GST for the purpose of CTC | 1 | Nos | 30,305.85 ₹30,305.85 Lowest |
Tender Value
₹1.9 L
EMD Value
₹2,400
Closing Date
4 Apr 2025, 5:00 pmClosed
AE EnM
Sonepur Bazari Area
Installation of transformer 3.3KV/440V with construction of chemical earth pit for system and neutral earthing at Haripur Colony at S.B. Project.
2025_ECL_333132_1
GM/SBA/EnM/e-Tender/24-25/96
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Sonepur Bazari Area
Please refer tender documents.
6 documents required · 6 mandatory
₹2,400
26 Sept 2025
24 Mar 2025
7 Apr 2025
25 Mar 2025
4 Apr 2025
25 Mar 2025
25 Mar 2025 - 28 Mar 2025
Amount
Item Description/ Heading
Material Cost
Formation of chemical earth pits complete in all respect and connecting of the same to neutral and body of transformer.
Labour Cost:-
Installation , commissioning and testing of transformer (3.3kv/440V).
Formation of chemical earth pits complete in all respect and connecting of the same to neutral and body of transformer.
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .