| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹30.3 LAccepted-Finance | ₹30.3 L | 1 | Accepted-Finance Quoted highest among the all |
| 2 | 2₹31.8 LRejected-Finance CHANDIGARH | ₹31.8 L | 2 | Rejected-Finance Quoted lower than L1 |
| 3 | 3₹34.5 LRejected-Finance | ₹34.5 L | 3 | Rejected-Finance Quoted lowest among the all |
Tender Value
₹34.5 L
EMD Value
₹69,033
Closing Date
14 May 2026, 10:00 amClosed
DSCO Sri Muktsar Sahib
O/O DSCO Shri Muktsar Sahib
Earth work for excavation of trenches for laying of underground pipeline lowering and jointing of 400 mm 500mm 600mm dia RCC pipes fixing of AVP Riser construction of Haudies and pumpstand etc at district Sri Muktsar Sahib
2026_DOA_167359_1
DSWC/MKS/2026-2027/01
Open Tender
Pipe Laying Works
Shri Muktsar Sahib
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
₹69,033
14 May 2026
4 May 2026
14 May 2026
4 May 2026
14 May 2026
4 May 2026
E-Tender No.:DSWC/MKS/2026-27/01
Earth Work for excavation of Trenches for laying of Under Ground Pipe Line, lowering and jointing of 400 mm, 500mm, 600 mm Dia RCC Piped, fixing of AVP , Risers, Construction of Haudies and Pumpstands Etc. at Village Baja Madahar ,Haraj , Bhullarwal District Sri Muktsar sahib
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name and address of the Contractor/ Bidder
Phone Number of Contractor/ Bidder Email id of Bidder
Total Estimated Amount of Work Rs. 3451660
Quoted by Contractor/ Bidder (As percentage of Estimated Amount) %age (-/+) 0
details of work and cost
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village Baja Madahar , Sri Muktsar Sahib (C/o Moga No. 195185 / R etc. ) District Sri Muktsar Sahib
SR. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 8454.1 /m3 93.78 Rupees Ninety Three and Seventy Eight Paise Only
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 5693 /Mtrs 71 Rupees Seventy one Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2277 /Joints 207.84 Rupees Two Hundred Seven and Eighty Four Paise Only
4 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (riser pipe) 54 /cut 105 Rupees One Hundred Five Only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (Airvent pipe) 35 /cut 41 Rupees Forty One Only
6 Fixing of Risers & Alfa valves with C.C 1:2:4 54 /Riser & Valve 610.75 Rupees Six Hundred Ten and Seventy Five Paise Only
7 Fixing of Air vent Pipes with C.C 1:2:4 35 /Air pipe 287.89 Rupees Two Hundred Eighty Seven and Eighty Nine Only
8 Fixing of Pump Stand 7 /number 3588.93 Rupees Three Thousand five hundred Eighty Eight and Ninty Three Paise Only
Estimate of Charges for 7 Pump Stand and 1 Haudies
9 Earth work in Excavation 69.225 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
10 B.B.C 1:8:16 4.8 cum 3801.78 Rupees Thousand Eight Hunderd One and Seventy Eight Paise Only
11 Plain Cement Concrete 1:2:4 0.456 cum 5012.71 Rupees Five Thousand Twelve and Seventy One Paise Only
12 First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 3.63 cum 4465.88 Rupees Four Thousand Four Hundred Sixty Five and Eighty Eight Paise only
13 10.0 mm thick cement plaster work 1:3 36.6 sqm 186.09 Rupees One Hundred Eighty Six and Nine Paise Only
Total Cost for Pump Stand/Riser
Cost of Other Items
14 Sign Board (5' X 3') 1 each 3000 Rupees Three thousand Only 3000
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 500 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village Haraj , Sri Muktsar Sahib (C/o Moga No. 218640/L etc. ) District Sri Muktsar Sahib
SR.NO. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2585.58 /m3 93.78 Rupees Ninety Three and Seventy Eight Paise Only
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1467 /Mtrs 71 Rupees Seventy one Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 587 /Joints 277.84 Rupees Two Hundred Seventy Seven and Eighty Four Paise Only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (Airvent pipe) 9 /cut 41 Rupees Forty One Only
7 Fixing of Risers & Alfa valves with C.C 1:2:4 14 /Riser & Valve 1120.1 Rupees One Thousand One Hundred Twenety and Ten Paise Only
8 Fixing of Air vent Pipes with C.C 1:2:4 9 /Air pipe 289.41 Rupees Two Hundred Eighty Nine and Forty One Only
10 Fixing of Pump Stand 3 /number 3599.7 Rupees Three Thousand Five Hundred Ninty Nine and Seventy Paise
Estimate of Charges for 3 Pump Stand
11 Earth work in Excavation 24 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
12 B.B.C 1:8:16 1.8 cum 3827.45 Rupees Thousand Eight Hunderd Twenty Seven and Forty Five Paise Only
Total Cost for Pump Stand/Riser
Cost of Other Items
13 Sign Board (5' X 3') 1 each 3000 Rupees Three thousand Only 3000
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village Bhullarwala , Sri Muktsar Sahib (C/o Moga No. 131250/TR etc. ) District Sri Muktsar Sahib
SR.NO. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 4704 /m3 93.78 Rupees Ninety Three and Seventy Eight Paise Only
2 Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 2450 /Mtrs 74 Rupees Seventy one Only
3 Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 980 /Joints 339.1 Rupees Two Hundred Seventy Seven and Eighty Four Paise Only
4 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (riser pipe) 11 /cut 150 Rupees One Hundred Fifty only
5 Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (Airvent pipe) 8 /cut 41 Rupees Forty One Only
6 Fixing of Risers & Alfa valves with C.C 1:2:4 11 /Riser & Valve 1291.39 Rupees One Thousand One Hundred Twenety and Ten Paise Only
7 Fixing of Air vent Pipes with C.C 1:2:4 8 /Air pipe 295.58 Rupees Two Hundred Eighty Nine and Forty One Only
8 Fixing of Pump Stand 3 /number 3656.03 Rupees Three Thousand Five Hundred Ninty Nine and Seventy Paise
Estimate of Charges for 3 Pump Stand
9 Earth work in Excavation 24 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
10 B.B.C 1:8:16 1.8 cum 3958.02 Rupees Thousand Eight Hunderd Twenty Seven and Forty Five Paise Only
Total Cost for Pump Stand/Riser
Cost of Other Items
11 Sign Board (5' X 3') 1 each 3000 Rupees Three thousand Only
12 Recarriage of Pipes 0.5 to 1 KM 493 Per tonne 213.14 Rupees Two Hundred Thirteen and Fourteen Paise Only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
StandardDNITDoc_zyaebxlfnvo_134219981500381604.pdf
Tender Documents • 0.52 MB
Financial_Bid_tzlmvnta3yn_134213287737145913.xls
Additional Documents • 0.08 MB
DNITApprovalLetter_w1myb2pusjo_134217600853636132.pdf
Additional Documents • 0.02 MB
Download all tender documents and submit your bid