Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAccepted-Finance | ₹18.2 L | L1 | Accepted-Finance OK |
| 2 | L2₹21.4 L+₹3.2 L (17.7%)Accepted-Finance | ₹21.4 L+₹3.2 L (17.7%) | L2 | Accepted-Finance OK |
| 3 | L3₹21.7 L+₹3.5 L (19.1%)Accepted-Finance | ₹21.7 L+₹3.5 L (19.1%) | L3 | Accepted-Finance OK |
| 4 | L4₹22.5 L+₹4.3 L (23.5%)Accepted-Finance | ₹22.5 L+₹4.3 L (23.5%) | L4 | Accepted-Finance OK |
| Sl No | Description | Qty | Unit | M.S. SAROJ ENTERPRISE L1 | M/S GALIYAN ENGINEERING WORKS L4 | M K TRADERS L2 | M/S SHRI BALAJI ELECTRICALS L3 |
|---|---|---|---|---|---|---|---|
| 1.00Safe carriage of the following Centralised material from Store Centre to site /JE store with loading & unloading at both ends respectively. | |||||||
| 1.01 | PCC pole 8.5 meter long | 34 | No | 650 ₹22,100 | 900 ₹30,600 | 450 ₹15,300 Lowest | 600 ₹20,400 |
| 1.02 | 250 KVA transformer | 12 | No | 3,500 ₹42,000 Lowest | 5,000 ₹60,000 | 4,500 ₹54,000 | 6,000 ₹72,000 |
| 1.03 | 100 KVA transformer | 2 | No | 2,500 ₹5,000 Lowest | 3,500 ₹7,000 | 4,000 ₹8,000 | 6,000 ₹12,000 |
| 1.04 | 63 KVA transformer | 5 | No | 2,500 ₹12,500 Lowest | 3,000 ₹15,000 | 3,600 ₹18,000 | 3,000 ₹15,000 |
| 1.05 | 25 KVA transformer | 7 | No | 2,200 ₹15,400 Lowest | 2,500 ₹17,500 | 2,500 ₹17,500 | 3,000 ₹21,000 |
| 1.06 | ACSR weasel conductor | 2,110 | Mtr | 3 ₹6,330 | 6 ₹12,660 | 3 ₹6,330 | 2 ₹4,220 Lowest |
| 1.07 | LT AB Cable (3x50+1x35+1x16) Sq.mm | 1,110 | Mtr | 10 ₹11,100 | 20 ₹22,200 | 6 ₹6,660 Lowest | 10 ₹11,100 |
| 1.08 | LT AB Cable (3x120+1x95+1x16) Sq.mm | 1,430 | Mtr. | 10 ₹14,300 | 25 ₹35,750 | 6 ₹8,580 Lowest | 10 ₹14,300 |
| 1.09 | LT PVC Cable 1X400 sqmm | 100 | Mtr | 10 ₹1,000 Lowest | 100 ₹10,000 | 40 ₹4,000 | 50 ₹5,000 |
Tender Value
₹25.6 L
EMD Value
₹26,000
Closing Date
10 Jun 2026, 12:00 pmClosed
SE EDC BIJNOR
AVAS VIKAS COLONY, BIJNOR
The Work of Increasing Capacity of Distribution Transformer and other works like earthing, installation of danger board etc Under EDD, Bijnor, Kiratpur, Chandpur and Noorpur.
2026_PVVNL_1151569_1
01/2026-27/EDC BIJNOR
Open Tender
Electrical Works
Item Rate
90 days
SE EDC BIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Yes
SE EDC BIJNOR
₹26,000
Yes
12 Jun 2026
22 May 2026
10 Jun 2026
22 May 2026
10 Jun 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Safe carriage of the following Centralised material from Store Centre to site /JE store with loading & unloading at both ends respectively. | |||||
| 1.01 | PCC pole 8.5 meter long | 34 | No | - | - |
| 1.02 | 250 KVA transformer | 12 | No | - | - |
| 1.03 | 100 KVA transformer | 2 | No | - | - |
| 1.04 | 63 KVA transformer | 5 | No | - | - |
| 1.05 | 25 KVA transformer | 7 | No | - | - |
| 1.06 | ACSR weasel conductor | 2,110 | Mtr | - | - |
| 1.07 | LT AB Cable (3x50+1x35+1x16) Sq.mm | 1,110 | Mtr | - | - |
| 1.08 | LT AB Cable (3x120+1x95+1x16) Sq.mm | 1,430 | Mtr. | - | - |
| 1.09 | LT PVC Cable 1X400 sqmm | 100 | Mtr | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
BOQ_2157028.xls
BOQ • 0.28 MB
T_1.pdf
Tender Documents • 1.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .