Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹1.9 LAccepted-AOC FULBERIA SAMDI BARDHAMAN 713359 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713359 | ₹1.9 L Quoted ₹2.0 L | L2 | Accepted-AOC Being L1 bidder work is awarded. |
| 2 | L1₹1.9 LRejected-Finance | ₹1.9 L | L1 | Rejected-Finance As per TC committee recommendation |
| 3 | L3₹2.0 LRejected-Finance BALAJPUR MORE BALIAPUR PO LALGANJ 713359 WEST BENGAL INDIA | BALIAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | ₹2.0 L | L3 | Rejected-Finance As per TC committee recommendation |
| Sl No | Description | Qty | Unit | KALYANI ENTERPRISE L3 | RAKESH ELECTRICAL L2 | R.S. ELECTRICAL CONCERN L1 |
|---|---|---|---|---|---|---|
| 1.00 | Cost of digital Earth relay with CBCT | 1 | No | 12,812 ₹12,812 | 12,652 ₹12,652 | 12,512 ₹12,512 |
| 2.00 | Cost of Vacuum contact bottle as per existing dimension & specification | 3 | Nos | 30,000 ₹90,000 | 30,000 ₹90,000 | 30,000 ₹90,000 |
| 3.00 | Cost of C.T.(100/200/5) | 3 | Nos | 4,500 ₹13,500 | 4,500 ₹13,500 | 4,500 ₹13,500 |
| 4.00 | Cost of seperator switch for Amp Meter & Volt Meter | 2 | Nos | 2,500 ₹5,000 | 2,500 ₹5,000 | 2,500 ₹5,000 |
| 5.00 | Cost of closing & tripping mechanism with supply of spares | 1 | LS | 6,000 ₹6,000 | 6,000 ₹6,000 | 6,000 ₹6,000 |
| 6.00 | Cost of glass epoxy separator | 2 | Nos | 3,750 ₹7,500 | 3,750 ₹7,500 | 3,750 ₹7,500 |
| 7.00 | Cost of Nuts, bolts ,washer & painting inner & outer body of VCB. | 1 | LS | 2,500 ₹2,500 | 2,500 ₹2,500 | 2,500 ₹2,500 |
| 8.00 | Cost of wiring /insulation materials | 1 | LS | 5,000 ₹5,000 | 5,000 ₹5,000 | 5,000 ₹5,000 |
| 9.00Piller Portion | ||||||
| 10.00 | Re-insulation of bus bar with insulation materials | 1 | LS | 5,000 ₹5,000 | 5,000 ₹5,000 | 5,000 ₹5,000 |
Tender Value
₹2.3 L
EMD Value
₹2,900
Closing Date
29 Dec 2025, 11:00 amClosed
AE EandM
Office of AE EandM
Up gradation of electrical starter 3.3KV,50 Amps Mine line make Vacuum type installed at Mines of Bonjemihary Colliery under Salanpur Area.
2025_ECL_349482_1
ECL/SLN/GM/EnM/ etender/25-26/40, dt. 15.12.2025
Open Tender
Electrical and Maintenance Works
14 days
Bonjemihary ocp
6 documents required · 6 mandatory
₹2,900
16 Apr 2026
17 Dec 2025
30 Dec 2025
17 Dec 2025
29 Dec 2025
17 Dec 2025
17 Dec 2025 - 24 Dec 2025
Cost of digital Earth relay with CBCT
Cost of Vacuum contact bottle as per existing dimension & specification
Cost of C.T.(100/200/5)
Cost of seperator switch for Amp Meter & Volt Meter
Cost of closing & tripping mechanism with supply of spares
Cost of glass epoxy separator
Cost of Nuts, bolts ,washer & painting inner & outer body of VCB.
Cost of wiring /insulation materials
Piller Portion
Re-insulation of bus bar with insulation materials
Bus bar Jumper
Cost of Male /female pin socket
Moulded out going insulator with terminal
Cost of Bus bar terminal
Repairing of Isolator with contacts changing
Labour Charges for upgradation of 3.3 KV starter .Unskilled-04 nos, Skilled 01 no.
Add: Other Expenses
Add: Provident fund on Labour cost
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
techsummary_362234.pdf
BOQ Comparative Chart
xlsx
finsummary_362234.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Tendernotice_2.pdf
PDF • 1.76 MB
Tendernotice_3.pdf
PDF • 0.24 MB
BOQ_362234.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid