| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
11 Sept 2023, 2:00 pmClosed
SE/GOBI/EDC
The Superintending Engineer, 110/11 KV GOBI SS CAMPUS,VETTAIKARANKOVIL,GOBI-638476
Erection, dismantling transportation of poles, DTs, HT/LT lines at Construction Gobi Subdivision
2023_EB_364762_1
ET No.35/23-24 dt 25.8.23
Open Tender
Electrical and Maintenance Works
Works
30 days
GOBI EDC
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
Yes
12 Sept 2023
29 Aug 2023
12 Sept 2023
29 Aug 2023
11 Sept 2023
29 Aug 2023
Amount
Excavation of pole pit upto 27" (8.0 m) pole by using JCB or manual
Excavation of Stay pit 4.5' to 5' depth by using JCB or manual
Excavation of pole pit above 8.0 mtr pole PSC/RCC/RSJ by using JCB or manual
Excavation of pole/stay pit hard rock requires blasting
Excavation of Pole pit/ Stay pit Hard rock without blasting (where houses are located)
Erection of PSC/RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
Dismantling of RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
Erection of pole above 8.0 mtr pole PSC/RCC/RSJ by using JCB or manual
Erection of metal supports above 9 m/RSJ/Rail poles/ Fabricated poles/Tubular pole by using JCB or manual
Dismantling of metal supports above 9 m/RSJ/Rail poles/ Fabricated poles/Tubular pole by using JCB or manual
Erection of stay set complete
Dismantling of Stay
Fixing of "V" cross arms (all types)/Channel cross arms/guarding cross arms/Double Channel X Arm/Guarding Crossarm/Tapping Channel X arm
Dismantling of "V" cross arms (all types)/Channel cross arms/guarding cross arms/Double Channel X Arm/Guarding Crossarm/Tapping Channel X arm
Fixing of LT 3 phase cross arms
Dismantling of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Dismantling of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Dismantling of HT/LT TI Fittings
Fixing of HT pin Insulators 11 KV
Dismantling of HT pin Insulators 11 KV
Fixing of HT 11 KV strain disc
Dismantling of HT 11 KV strain disc
Fixing of LT pin Insulator
Dismantling of LT pin Insulator
Fixing of LT shackle
Dismantling of LT shackle
Fixing of Aluminium Knob
Dismantling of Aluminium Knob
Earthing of pole with coil earthing including burying looping and binding.
Paving of conductor, stringing etc.complete with ACSR 7/4.09 mm.
Paving of conductor, stringing etc.complete with ACSR for both HT/LT lines ACSR 7/3.35mm, AAAC 7/3.15 mm Rabbit conductor
Paving of conductor, stringing etc.complete with ACSR for both HT/LT lines ACSR 7/2.59mm AAAC 7/2.50mm weasel and ACSR 7/2.11mm conductor.
Sleeve concreting including materials (Cement + river sand/M sand and Blue metals and watering).
Flat guarding including fixing of 2 Nos,cross arms
Guarding arrangement for HT Guarding
Transporting of poles/Materials/Conductors and other materials (excluding loading and unloading charges) below 8 kms
Transporting of poles/Materials/ Conductors and other materials (Excluding loading and unloading charges)above 8 Kms. For additional Km (Inrespective of weight in tonnage )
Loading of Poles upto 27'
Loading of Metal poles (All sizes)
Unloading of poles upto 27'
Unloading of Metal Poles(All sizes)
Transporting of poles from road site to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road site to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Loading /Unloading of Distribution Transformer up to 100 KVA for each
Loading /Unloading of Distribution Transformer above 100 and upto 200 KVA
Loading /Unloading of Distribution Transformer above 200 KVA
Erection of New transformer All capacities(with jumbering)
Erection of street light including fixture fitting
Erection of street light service
Releasing of grills from RCC poles
Releasing of single phase service and re-fixing
Releasing of 3 phase service and (upto 50 HP) refixing
Labour charges for alteration of Back clamp (Stay clamp)to suit for the works.
Re Sagging of ACSR 7/3.35mm, AAAC 7/3.15 mm Rabbit conductor
Re Sagging of ACSR 7/2.59mm AAAC 7/2.50mm weasel and ACSR 7/2.11mm conductor.
Providing LT bus bar arrangement in distn. Trs. Structure location
Provision of Distribution Transformer Name Board (Name of the 22/11KV #, Name of the SS, Capacity of DT.
Releasing of ACSR/AAAC conductors from conductor drum and coiling ACSR 7/3.35, 7/2.59, AAAC 7/2.50, 7/3.15 MM (Per/Km.)
Cutting of coconut leaves (per tree)
Drilling of hole in channel only 3/4" & 1"
T.I.Fitting welding with clamps
Clearing of branches of trees
Feeding arrangements with open type fuse unit
Painting of Transformer (Double Coat)
Releasing of HTS wire from PSC Pole
Replacement of HQ&EM Meter to Static Meter
Replacement of earthing of pole with coil earthing including burying looping & binding
Erection of new earth pipe by replacing the corroded earth pipe
Erection of new 10' earth pipe by replacing the corroded earth pipe and renewal of earthing including burying looping and binding.
Fixing of meter on LV side of DT with CT
Fencing of Distribution Transformer structure at Road side Fabrication and Erection
Erection of Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel seating channel,belding angle including concreting (Expect erection of Transformer)
Erection of Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel seating channel,belding angle excluding concreting (Expect erection of Transformer)
Erection of DP structure with AB switch , Top channel , cross bracing earthing painting providing stay including concreting .
Erection of DP structure with AB switch , Top channel , cross bracing earthing painting providing stay excluding concreting .
Erection of Single pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of tapping channel,Transformer bed structure including concreating (Expect erection of Transformer)
Erection of Single pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of tapping channel,Transformer bed structure excluding concreating (Expect erection of Transformer)
Set right the leaning of poles (all size Pole)
Engaging of JCB/Crane for first 2 Hrs
Engaging of JCB/Crane for every additional Hrs
Replacement of failed Transformers all capacities
Clearig of jungle
SRIVISHNU ELECTRICAL WORKS
HARISIVAM AND CO
Bidder Name
SRI DEVI AMMAN AND CO
stage.html
html • 0.02 MB
finance_434933.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .