| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC BAZARPURA NOWROZABAD MADHYA PRADESH 484555 DIST UMARIA M P | NOWROZABAD | UMARIA | MADHYA PRADESH | 484555 | L1 | Accepted-AOC Lowest bidder |
Tender Value
₹7.0 L
EMD Value
₹8,700
Closing Date
22 Mar 2023, 5:00 pmClosed
Staff Officer EnM Johilla Area
Office of the General Manager johilla Area ENM department Johilla Area Nowrozabad distt umaria madhyapradesh 48455
Repairing/Rewinding of 05 Nos. Transformers (Local No. TFR-28, TFR-34, TFR-14, TFR-93, TFR-94) of different Capacity and voltage rating 33KV/3.3KV-1000KVA, 33KV/3.3KV-1000KVA, 33KV/3.3KV-750KVA 3.3KV/550V/440V-500KVA, 3.3KV/230Volts-63KVA of dif
2023_SECL_274014_1
SECL/JHL/SO(EnM)/ 22-23/ET/222329 Dt 06/03/2023
Open Tender
Electrical and Maintenance Works
Item Rate
90 days
REGIONAL WORKSHOP JOHILLA AREA SECL
5 documents required · 5 mandatory
₹8,700
27 Jun 2023
7 Mar 2023
24 Mar 2023
7 Mar 2023
22 Mar 2023
7 Mar 2023
7 Mar 2023 - 15 Mar 2023
Amount
PART A : Details: Make- Star Delta make, 33KV/3.3KV, 1000KVA, 50C/S, Oil Cooled, Serial No. 1090/11848, Local No.-TFR 28 of Umaria Mine,Umaria Sub Area.
Complete Repairing, rewinding, &Testing of Power Transformer by Replacement of all damaged Primary & Secondary winding and all Primary & secondary winding reinsulation of three Paper insulated as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly.Dismantaling, replacement of damaged parts i.e.Tab-changer insulators & Others and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make synthetic enamel paints.
a)Total Copper Winding Weight(Primary +secondary) = 443kg
b) Copper wire for Primary core of transformer
c) Insulating Material and varnish of sl.no. 1.3
d) Labour Charges of sl. No. 1.3
e) Less Scrap Copper of sl. No. 1.3
PART B: Details: Make- Star Delta make, 33KV/3.3KV, 1000KVA, 50C/S, Oil Cooled, Serial No. Name Plate Missing, Local No.-TFR 34 of Umaria Mine,Umaria Sub Area.
Complete Repairing, rewinding, &Testing of Power Transformer by Replacement of all damaged Primary & Secondary winding and all Primary & secondary winding reinsulation of three Paper insulated as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly.Dismantaling, replacement of damaged parts i.e.Tab-changer insulators & Others and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make synthetic enamel paints.
a)Total Copper Winding Weight(Primary +secondary) = 482kg
b) Copper wire for Primary core of transformer
c) Insulating Material and varnish of sl.no.2.3
d) Labour Charges of sl. No. 2.3
e) Less Scrap Copper of sl. No. 2.3
PART C: Details: Make- Electric Corporation, 33KV/3.3KV, 750KVA, 50C/S, Oil Cooled, Serial No. 249/1, Local No.-TFR 14 of Birsinghpur Mine, Pali Sub Area.
Complete Repairing, rewinding, &Testing of Power Transformer by Replacement of all damaged Primary & Secondary winding and all Primary & secondary winding reinsulation of three Paper insulated as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly.Dismantaling, replacement of damaged parts i.e.Tab-changer insulators & Others and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make synthetic enamel paints.
a)Total Copper Winding Weight(Primary +secondary) = 840kg
b) Copper wire for Primary core of transformer
c) Insulating Material and varnish of sl.no. 3.3
d) Labour Charges of sl. No. 3.3
e) Less Scrap Copper of sl. No. 3.3
PART D: Details: Make- Mirjapur Electrical Industries ,3.3KV/550/440Volts, 500KVA, 50C/S, Oil Cooled, Serial No. 17898, Local No. TFR-93 of Pali Project Mine, Pali Sub Area.
Complete Repairing, rewinding, &Testing of Power Transformer by Replacement of all damaged Primary & Secondary winding and all Primary & secondary winding reinsulation of three Paper insulated as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly.Dismantaling, replacement of damaged parts i.e.Tab-changer insulators & Others and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make synthetic enamel paints.
a)Total Copper Winding Weight(Primary +secondary) = 350kg
b) Copper wire for Primary core of transformer
c) Insulating Material and varnish of sl.no. 4.3
d) Labour Charges of sl. No. 4.3
e) Less Scrap Copper of sl. No. 4.3
PART E: Details: Make- M&B SwitchGears, 3.3KV/230Volts, 63KVA, 50C/S, Oil Cooled, Serial No. PRM128119, Kancan OCM, NRZB Sub Area, Johilla Area..
Complete Repairing, rewinding, &Testing of Power Transformer by Replacement of all damaged Primary & Secondary winding and all Primary & secondary winding reinsulation of three Paper insulated as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly.Dismantaling, replacement of damaged parts i.e.Tab-changer insulators & Others and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make synthetic enamel paints.
a)Total Copper Winding Weight(Primary +secondary) = 69kg
b) Copper wire for Primary core of transformer
c) Insulating Material and varnish of sl.no. 5.3
d) Labour Charges sl. No. 5.3
e) Less Scrap Copper of sl. No. 5.3
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .