Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-AOC | ₹11.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.4 LRejected-Finance GRAM AND POST JARKHOR KALAN BABURI CHANDAULI | CHANDAULI | UTTAR PRADESH | 221009 | ₹11.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹12.2 LRejected-Finance NEAR SHIV MANDIR RETI STREET MANAS PRAKRIT CHIKITSALAY CENTER PAT PAT SARAI MORADABAD MORADABAD UTTAR PRADESH 244001 | MORADABAD | UTTAR PRADESH | 244001 | ₹12.2 L | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical CIVIL LINE MORCHAGHAR CIVIL LINE MORCHAGHAR MIRZAPUR MIRZAPUR MIRZAPUR UTTAR PRADESH 231001 UDYAM UP 57 0003195 | MIRZAPUR | UTTAR PRADESH | 231001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical NEWADA VARANASI | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | PURNIMA CONSTRUCTION L1 | Shree Construction L3 | M/S RISHABH SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling RCC slab including stacking of dismantled materials as directed by engineer in charge | 17.6 | M3 | 436.8 ₹7,687.68 | 500 ₹8,800 | 492.46 ₹8,667.30 |
| 2.00 | Dismantling brick work in cement mortar including stacking of materials within a distance of 60 m. | 103.76 | M3 | 205.8 ₹21,353.81 | 250 ₹25,940 | 232.02 ₹24,074.40 |
| 3.00 | Earth work in excavation in foundation in all type of soil including all leads & lift with proper disposal of excess earth. | 125.57 | M3 | 70 ₹8,789.90 | 80 ₹10,045.60 | 79 ₹9,920.03 |
| 4.00 | Laying Cement concrete 1:3:6 in foundation with brick ballast size 20 to 40 mm and coarse sand including cost of all materials, labour and T&P etc complete. | 31.46 | M3 | 4,267.34 ₹1.3 L | 5,500 ₹1.7 L | 4,811.12 ₹1.5 L |
| 5.00 | 1st class brick masonary work in 1:4 C.M. with coarse sand including cost of all material, labour and T&P etc complete. | 74.47 | M3 | 4,435.96 ₹3.3 L | 5,800 ₹4.3 L | 5,001.22 ₹3.7 L |
| 6.00 | Centering & shuttering for R.C.C. work in Lintel & Slab including cost of all material, labour and T&P etc Complete. | 52.63 | M2 | 684.6 ₹36,030.50 | 125 ₹6,578.75 | 771.83 ₹40,621.41 |
| 7.00 | Cutting, bending, binding and placing in position of tor steel in R.C.C. work including cost of all materials, labour and T&P etc complete. | 4.09 | MT | 68,932.5 ₹2.8 L | 75,000 ₹3.1 L | 77,716.47 ₹3.2 L |
| 8.00 | Laying R.C.C. 1:1½:3 with Dala stone grit size 4.75 to 20 mm & coarse sand including cost of all materials, labour and T&P etc complete. | 26.18 | M3 | 6,679.82 ₹1.7 L | 9,300 ₹2.4 L | 7,531 ₹2.0 L |
| 9.00 | Struck Deep Pointing 1:2 C.M. including cost of all materials, labour, lead, lift and T&P etc | 36.1 | M2 | 106.95 ₹3,860.90 | 125 ₹4,512.50 | 120.58 ₹4,352.94 |
| 10.00 | Finished wall with water proofing cement paint of approved make such as super snowcem,Super cern quality etc and of required shade on new wall surface (two coats) over one coat of white cement primer to give the even shade after thoroughly brushing the surface to removed powdered materials including cost of all material,labour T & P etc.required for proper completion of work. | 36.1 | M2 | 85.4 ₹3,082.94 | 75 ₹2,707.50 | 96.28 ₹3,475.71 |
Tender Value
₹1.4 L
EMD Value
₹30,000
Closing Date
23 Feb 2026, 2:00 pmClosed
Executive Engineer
Office Executive Engineer, Bandhi Division, Varunapurm Sinchai Colony Sigra, Varanasi
RENOVATION OF V.R.B AT KM 3.500 OF LALPUR-I DRAIN
2026_UPIDC_1116560_2
05/E.E./B.D.V./2025-26
Open Tender
Civil Works
30 days
Varanasi
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹30,000
Yes
10 Mar 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
Dismantling RCC slab including stacking of dismantled materials as directed by engineer in charge
Dismantling brick work in cement mortar including stacking of materials within a distance of 60 m.
Earth work in excavation in foundation in all type of soil including all leads & lift with proper disposal of excess earth.
Laying Cement concrete 1:3:6 in foundation with brick ballast size 20 to 40 mm and coarse sand including cost of all materials, labour and T&P etc complete.
1st class brick masonary work in 1:4 C.M. with coarse sand including cost of all material, labour and T&P etc complete.
Centering & shuttering for R.C.C. work in Lintel & Slab including cost of all material, labour and T&P etc Complete.
Cutting, bending, binding and placing in position of tor steel in R.C.C. work including cost of all materials, labour and T&P etc complete.
Laying R.C.C. 1:1½:3 with Dala stone grit size 4.75 to 20 mm & coarse sand including cost of all materials, labour and T&P etc complete.
Struck Deep Pointing 1:2 C.M. including cost of all materials, labour, lead, lift and T&P etc
Finished wall with water proofing cement paint of approved make such as super snowcem,Super cern quality etc and of required shade on new wall surface (two coats) over one coat of white cement primer to give the even shade after thoroughly brushing the surface to removed powdered materials including cost of all material,labour T & P etc.required for proper completion of work.
Earth work filling from cartage earth for making approach road on both sides with all lead and lift, manual compaction including carriage with all type soil and T&P charges etc. required for proper completion of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
TenderDocuementsLot02.pdf
Tender Documents • 3.08 MB
BOQ_2073929.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid