Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 CrAdmitted-Finance | ₹9.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.2 Cr+₹33.6 L (3.39%)Admitted-Finance | ₹10.2 Cr+₹33.6 L (3.39%) | L2 | Admitted-Finance |
| 3 | L3₹10.7 Cr+₹79.6 L (8.04%)Admitted-Finance | ₹10.7 Cr+₹79.6 L (8.04%) | L3 | Admitted-Finance |
| 4 | L4₹12.7 Cr+₹2.8 Cr (28.0%)Admitted-Finance | ₹12.7 Cr+₹2.8 Cr (28.0%) | L4 | Admitted-Finance |
| 5 | L5₹13.6 Cr+₹3.7 Cr (37.7%)Admitted-Finance 208 2ND FLOOR EXPRESS MARKET AMBEDKAR ROAD GHAZIABAD 201001 UP | GHAZIABAD | UTTAR PRADESH | 201001 | ₹13.6 Cr+₹3.7 Cr (37.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Prasad Construction Company L3 | VADERAS INTERIORS AND EXTERIORS L5 | M/s T.K. ENTERPRISE L4 | Sri Nipul Kalita L1 | O-DARANG ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|---|
| 0.00NOTE:- (Applicable for all parts/items/):- The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. | ||||||||
| 1.00 | SCHEDULE ‘A’ PART-I(A) (BUILDING &STRUCTURE WORKS)
Construction of Swimming pool, Swimming pool shed and Spectator's Gallery, Plant room, Changing room, Balanching tank etc RCC framed structure, ACC block walls construction including built in furniture items complete all as specified and shown on drawings.
Note:
(i) Boring of pile and cast-in-situ of pile including its concrete and reinforcement shall be measured and paid separately under relevant Schedule.
(ii) Cost of pile cap including RCC, reinforcement and form work & its earthwork are included in the quoted amount of this item. | 1 | Each Block | 4,25,00,000 ₹4,25,00,000 | 7,90,00,000 ₹7,90,00,000 | 5,00,00,000 ₹5,00,00,000 | 20,00,000 ₹20,00,000 Lowest | 3,75,00,000 ₹3,75,00,000 |
| 2.00 | Lumpsum price workedout by the tenderer for CAS IN SITU PILE as listed in Schedule ‘A’ Part-I(B) | 1 | Lump-sum | 91,80,375 ₹91,80,375 | 95,00,000 ₹95,00,000 | 1,40,00,000 ₹1,40,00,000 | 82,70,609.4 ₹82,70,609.4 Lowest | 1,00,00,000 ₹1,00,00,000 |
| 3.00 | Lumpsum price worked out by the bidder/ tenderer for SITE CLEARANCE, SITE DEVELOPMENTS & EARTH WORKS as listed in Schedule 'A' Part-II. | 1 | Lump-sum | 3,71,729 ₹3,71,729 | 3,38,000 ₹3,38,000 | 5,00,000 ₹5,00,000 | 3,37,936.63 ₹3,37,936.63 Lowest | 3,37,936.63 ₹3,37,936.63 Lowest |
| 4.00 | Lumpsum price worked out by the bidder/ tenderer for ROAD, PATH, CULVERT AND HARDSTANDING as listed in Schedule 'A' Part-III | 1 | Lump-sum | 13,54,214 ₹13,54,214 | 8,16,000 ₹8,16,000 | 8,00,000 ₹8,00,000 | 6,80,510.73 ₹6,80,510.73 Lowest | 6,80,510.73 ₹6,80,510.73 Lowest |
| 5.00 | Lumpsum price worked out by the bidder/ tenderer for SEWAGE DISPOSAL as listed in Schedule 'A' Part-IV. | 1 | Lump-sum | 2,03,791 ₹2,03,791 | 2,35,000 ₹2,35,000 | 1,70,000 ₹1,70,000 | 1,34,073.36 ₹1,34,073.36 Lowest | 1,34,073.36 ₹1,34,073.36 Lowest |
| 6.00 | Lumpsum price worked out by the bidder/ tenderer for AREA DRAINAGE as listed in Schedule 'A' Part-V. | 1 | Lump-sum | 13,09,332 ₹13,09,332 | 13,00,000 ₹13,00,000 | 10,00,000 ₹10,00,000 | 8,67,107.81 ₹8,67,107.81 Lowest | 8,67,107.81 ₹8,67,107.81 Lowest |
| 7.00 | Lumpsum price worked out by the bidder/ tenderer for BOUNDRY WALL, FENCING AND GATE as listed in Schedule 'A' Part-VI. | 1 | Lump-sum | 22,28,968 ₹22,28,968 | 19,00,000 ₹19,00,000 | 17,00,000 ₹17,00,000 | 14,56,842.47 ₹14,56,842.47 Lowest | 14,56,842.47 ₹14,56,842.47 Lowest |
| 8.00 | Lumpsum price worked out by the bidder/ tenderer for INTERNAL ELECTRIFICATION as listed in Schedule 'A' Part-VII | 1 | Lump-sum | 8,13,127.37 ₹8,13,127.37 | 8,77,000 ₹8,77,000 | 6,50,000 ₹6,50,000 | 5,84,983.72 ₹5,84,983.72 Lowest | 5,84,983.72 ₹5,84,983.72 Lowest |
| 9.00 | Lumpsum price worked out by the bidder/ tenderer for INTERNAL WATER SUPPLY as listed in Schedule 'A' Part-VIII. | 1 | Lump-sum | 83,566.08 ₹83,566.08 | 85,000 ₹85,000 | 60,000 ₹60,000 | 56,084.62 ₹56,084.62 Lowest | 56,084.62 ₹56,084.62 Lowest |
Tender Value
₹9.5 Cr
EMD Value
₹8.0 L
Closing Date
29 Jul 2026, 6:00 pmClosed
CE SHILLONG ZONE
HQ CE SHILLONG ZONE, SPREAD EAGLE FALLS, SHILLONG MEGHALAYA 793011
PROVISION OF SWIMMING POOL AT LICHUBARI UNDER GE JORHAT
2026_MES_761733_2
89877/JOR/E8
Open Tender
Civil Works
Lump-sum
650 days
JORHAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
GE JORHAT
₹8.0 L
8 Sept 2026
4 Jun 2026
31 Jul 2026
4 Jun 2026
29 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCHEDULE ‘A’ PART-I(A) (BUILDING &STRUCTURE WORKS)
Construction of Swimming pool, Swimming pool shed and Spectator's Gallery, Plant room, Changing room, Balanching tank etc RCC framed structure, ACC block walls construction including built in furniture items complete all as specified and shown on drawings.
Note:
(i) Boring of pile and cast-in-situ of pile including its concrete and reinforcement shall be measured and paid separately under relevant Schedule.
(ii) Cost of pile cap including RCC, reinforcement and form work & its earthwork are included in the quoted amount of this item. | 1 | Each Block | - | - |
| 2 | Lumpsum price workedout by the tenderer for CAS IN SITU PILE as listed in Schedule ‘A’ Part-I(B) | 1 | Lump-sum | 82,70,609.4 | ₹82,70,609.4 |
| 3 | Lumpsum price worked out by the bidder/ tenderer for SITE CLEARANCE, SITE DEVELOPMENTS & EARTH WORKS as listed in Schedule 'A' Part-II. | 1 | Lump-sum | 3,37,936.63 | ₹3,37,936.63 |
| 4 | Lumpsum price worked out by the bidder/ tenderer for ROAD, PATH, CULVERT AND HARDSTANDING as listed in Schedule 'A' Part-III | 1 | Lump-sum | 6,80,510.73 | ₹6,80,510.73 |
| 5 | Lumpsum price worked out by the bidder/ tenderer for SEWAGE DISPOSAL as listed in Schedule 'A' Part-IV. | 1 | Lump-sum | 1,34,073.36 | ₹1,34,073.36 |
| 6 | Lumpsum price worked out by the bidder/ tenderer for AREA DRAINAGE as listed in Schedule 'A' Part-V. | 1 | Lump-sum | 8,67,107.81 | ₹8,67,107.81 |
| 7 | Lumpsum price worked out by the bidder/ tenderer for BOUNDRY WALL, FENCING AND GATE as listed in Schedule 'A' Part-VI. | 1 | Lump-sum | 14,56,842.47 | ₹14,56,842.47 |
| 8 | Lumpsum price worked out by the bidder/ tenderer for INTERNAL ELECTRIFICATION as listed in Schedule 'A' Part-VII | 1 | Lump-sum | 5,84,983.72 | ₹5,84,983.72 |
| 9 | Lumpsum price worked out by the bidder/ tenderer for INTERNAL WATER SUPPLY as listed in Schedule 'A' Part-VIII. | 1 | Lump-sum | 56,084.62 | ₹56,084.62 |
| 10 | Lumpsum price worked out by the bidder/ tenderer for EXTERNAL WATER SUPPLY as listed in Schedule 'A' Part-IX. | 1 | Lump-sum | 1,32,046 | ₹1,32,046 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.27 MB
tender.pdf
Tender Documents • 9.82 MB
BOQ_862101.xls
BOQ • 0.58 MB
tddrawings.pdf
Additional Documents • 35.03 MB
maindrawings.pdf
Additional Documents • 13.55 MB
dtcorrigendum05.pdf
PDF • 0.23 MB
dtcorrigendum03.pdf
PDF • 0.23 MB
89877dtcorr02.pdf
PDF • 0.23 MB
dtcorrigendum01.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .