| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹70.5 LAccepted-AOC | ₹70.5 L | 1ST | Accepted-AOC successful |
| 2 | 2ND₹70.5 LSame as 1STRejected-Finance | ₹70.5 LSame as 1ST | 2ND | Rejected-Finance unsuccessful |
| 3 | 3RD₹70.5 LSame as 1STRejected-Finance | ₹70.5 LSame as 1ST | 3RD | Rejected-Finance unsuccessful |
| 4 | 4TH₹70.5 LSame as 1STRejected-Finance | ₹70.5 LSame as 1ST | 4TH | Rejected-Finance unsuccessful |
| 5 | 5TH₹70.5 LSame as 1STRejected-Finance | ₹70.5 LSame as 1ST | 5TH | Rejected-Finance unsuccessful |
Tender Value
₹70.5 L
EMD Value
₹70,504
Closing Date
27 Feb 2026, 5:00 pmClosed
COMMISSIONER, SMC
SAMBALPUR MUNICIPAL CORPORATION, DURGAPALI, SAMBALPUR, 768006
Rejuvenation of Kahirapali Bandha,Down Stream
2026_ORULB_125479_8
31/SMC_SBP/2025-26
National Competitive Bid
Civil Works - Others
Percentage
90 days
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹70,504
Yes
3 Aug 2026
7 Feb 2026
2 Mar 2026
7 Feb 2026
27 Feb 2026
7 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | De-Watering:-Suplying all materials, labours, T&P, 5.00 HP Diesel Pump set with POL, Pump Operator etc. and De-watering the clear water/muddy water etc. all complete as per the required specification and direction of Engineer in charge | 483.33 | HR | 233.11 | ₹1,12,669.06 |
| 2 | Deweeding:-Uprooting rank vegetation and weeds by digging the area to a depth of 60cm, removing all weeds and other growth roots by forking repeatedly beraking clods rough dressing flooding with water uprooting fresh growths after 10 to 15days and then fine dressing for planting new grass etc as per the required specification and direction of the Engineer-in -charge | 11,600 | Sqm | 44.54 | ₹5,16,664 |
| 3 | De-Silting :- Supplying all materials labour T&P, Excavation of any available type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil within the Pond Area on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction by mechanical means but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the required specification and direction of the Engineer-incharge. (measurement of the fill to be taken on the finished compacted section under OMC condition.) | 4,350 | Cum | 80.14 | ₹3,48,609 |
| 4 | Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 1km rehandling the earth from dumping yard to bank of pond & spreading on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5cm layers to make ready for watering in dams and dykes for all heights including construction maintenance watering and lighting of haul road and borrow area etc complete as per specification & direction of engineer in charges | 8,700 | Cum | 80.14 | ₹6,97,218 |
| 5 | Supplying all materials labour T&P, Watering earthwork upto OMC condition and compaction by Mechanical means in layars not exceeding 22.5Cm to 95% dray density including hire and running charges of all the Machineries complete as per the direction of EIC (AoR-2006, Page no-12, item No.2) | 8,304 | Cum | 47.85 | ₹3,97,346.4 |
| 6 | Supplying all materials , Labour, T&P and Fine dressing of earthwork in odinary or hard soil in road / Embankment formation including cost of cutting of filling earth upto 0.15m depth of surface etc all complete as per the required specifications and direction of Engineer in Charge (AoR-2006, Page no-7, item No.10) | 2,640 | Sqm | 5.37 | ₹14,166.24 |
| 7 | Earthwork in excavation of foundation in Ordinary soil including levelling the bed and depositing excavated earth away from site with in 50m initial lead , 1.50m initial lift. Complete as per direction of E-I-C | 332.82 | Cum | 206.06 | ₹68,580.89 |
| 8 | Supplying ,Filling of sand in foundation and plinth base of road surface including cost of material with taxes , watering, ramming and labour required for the work etc.Complete as per direction of E-I-C. | 46.85 | Cum | 826.11 | ₹38,699.12 |
| 9 | P.C.C. work in (1:3:6) with 40mm size h.g.metal(CB), mixing with concrete mixture laying , compacting including cost of all material with taxes , watering, curing ,labour required for the work etc. Complete as per direction of E-I-C. | 71.6 | Cum | 5,805.35 | ₹4,15,663.06 |
| 10 | P.C.C. work in (1:2:4) with 12mm size crusher brocken h.g. chips mixing with concrete mixture laying , compacting including cost of all material with taxes , watering, curing labour required for the work etc but excluding centring, shuttering . Complete as per direction of E-I-C. | 189.41 | Cum | 7,458.52 | ₹14,12,718.27 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_579289.xls
BOQ • 0.27 MB
corrigendum2.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .